Loading...
Building PermitADULT FAMILY HOME Permit City of Edmonds PERMIT NU iL . •:� i 1 1 www.edmondswa.gov Type: ADULT FAMILY Subtype: AFH ADDITION -REMODEL Status: ISSUED HOME Parcel No: 00407700100601 Site Address: 7615 201ST ST SW EDMONDS,WA 98026-6837 Applied: 11/2/2021 Subdivision: 004077, SP S-32-84 Lot: 0 Issued: 12/20/2021 Fire Sprinklers: Lot Area: Zoning: RM-3 Final: Valuation: $7,632.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 12/15/2022 Code Edition: 2018 No. Stories: 1 # of Dwelling Units: 1 Issued by: NED Scope of Work: GEBRE/YAECOB-BATHROOM ADDITION PLUMBING AND MECHANICAL INCL WA State Contractor L & I #: CISNERD817MC • NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT CARMELO LAVISTE 216 NE 175TH STREET, (206)683-2395 BONGNL@HOTMAIL.COM SHORELINE WA 98155 CONTACT CNL DESIGN 216 NE 175TH STREET, (206)683-2395 bongnl@hotmail.com SHORELINE WA 98155 CISNEROS REMODELING & 11936 SE 168TH ST, RENTON CONTRACTOR (206)451-3498 DESIGNS LLC WA 98058 GENET & YAECOB SAMUEL 7615 201ST ST SW, EDMONDS OWNER GEBRE WA 98026 PLUMBING FONZY'S PLUMBING INC 14555 WHITMAN AVE N, (425)345-6594 SHORLEINE WA 98133 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 11/18/21 R15957 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/3/21 R15717 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $15.00 $15.00 11/18/21 R15957 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $110.00 $110.00 11/18/21 R15957 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $259.00 $259.00 11/18/21 R15957 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $220.15 $220.15 11/3/21 R15717 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 11/18/21 R15957 WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 11/18/21 R15957 EXPANSION TANK TOTALS: $715.65 $715.65 CONDITION TYPE STATUS ?!!!!! NOTES Printed: Monday, December 20, 2021 10:18:21 AM 1 of 3 -ADULT FAMILY HOME • _ City of Edmonds PERMIT NUM — Edmondsrmit 98020 1 1 . •. 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 EXTERIOR INSULATION Printed: Monday, December 20, 2021 10:18:21 AM 2 of 3 • _ City of Edmonds PERMIT NUM Avermit 98020 1 1 11c, . •. B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-4 DRYWALL FASTENING B-4 FRAMING B-4 SHOWER PAN B-5 INSULATION ENERGY B-6 AFH COMPLIANCE B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" X-2 ENGINEERING FINAL Printed: Monday, December 20, 2021 10:18:21 AM 3 of 3