Building PermitADULT FAMILY HOME Permit
City of Edmonds
PERMIT NU
iL
. •:� i
1 1
www.edmondswa.gov
Type: ADULT FAMILY
Subtype: AFH ADDITION -REMODEL
Status: ISSUED
HOME
Parcel No: 00407700100601
Site Address: 7615 201ST ST SW EDMONDS,WA 98026-6837
Applied: 11/2/2021
Subdivision: 004077, SP S-32-84
Lot: 0
Issued: 12/20/2021
Fire Sprinklers:
Lot Area: Zoning: RM-3
Final:
Valuation: $7,632.00
Occupancy Type: R3 Construction Type: VB
Expiration Date: 12/15/2022
Code Edition: 2018
No. Stories: 1 # of Dwelling Units: 1
Issued by: NED
Scope of Work: GEBRE/YAECOB-BATHROOM ADDITION PLUMBING AND MECHANICAL INCL
WA State Contractor L & I #: CISNERD817MC
•
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
CARMELO LAVISTE
216 NE 175TH STREET,
(206)683-2395
BONGNL@HOTMAIL.COM
SHORELINE WA 98155
CONTACT
CNL DESIGN
216 NE 175TH STREET,
(206)683-2395
bongnl@hotmail.com
SHORELINE WA 98155
CISNEROS REMODELING
&
11936 SE 168TH ST, RENTON
CONTRACTOR
(206)451-3498
DESIGNS LLC
WA 98058
GENET & YAECOB SAMUEL
7615 201ST ST SW, EDMONDS
OWNER
GEBRE
WA 98026
PLUMBING
FONZY'S PLUMBING INC
14555 WHITMAN AVE N,
(425)345-6594
SHORLEINE WA 98133
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
11/18/21
R15957
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/3/21
R15717
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$15.00
$15.00
11/18/21
R15957
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$110.00
$110.00
11/18/21
R15957
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$259.00
$259.00
11/18/21
R15957
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$220.15
$220.15
11/3/21
R15717
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
11/18/21
R15957
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
11/18/21
R15957
EXPANSION TANK
TOTALS: $715.65
$715.65
CONDITION TYPE
STATUS
?!!!!!
NOTES
Printed: Monday, December 20, 2021 10:18:21 AM 1 of 3
-ADULT
FAMILY HOME • _
City of Edmonds PERMIT NUM —
Edmondsrmit
98020 1 1
. •.
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT
NOTES
DATE
A-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 EXTERIOR INSULATION
Printed: Monday, December 20, 2021 10:18:21 AM 2 of 3
• _
City of Edmonds PERMIT NUM
Avermit
98020 1 1
11c, . •.
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-6 AFH COMPLIANCE
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-2 ENGINEERING FINAL
Printed: Monday, December 20, 2021 10:18:21 AM 3 of 3