Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00548900002201 Site Address: 1136 VISTA PL EDMONDS,WA 98020-2968
Subdivision: 005070, 005489, BLA PLN20130068, SP S-24-77 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $10,000.00 Occupancy Type: Construction Type: VB
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: LANNING- CONVERT OFFICE TO LAUNDRY, NO STRUCTURAL. p&m INCL
WA State Contractor L & I #: PACIFEM090KZ
Applied: 8/6/2021
Issued: 9/3/2021
Final:
Expiration Date: 8/29/2022
Issued by: NED
CONTACTS
NAME TYPE
NAME
A
PHONE
EMAIL
APPLICANT
SIGVE HELLEREN
PO BOX 822, EDMONDS WA
(206)920-2597
PACEMSIGVE@GMAIL.COM
98020
CONTACT
LAURA LESTER DESIGNS
, EDMONDS WA 98020
LAURALESTER@HOTMAIL.COM
CONTRACTOR
PACIFIC EMERALD HOMES
PO BOX 822, EDMONDS WA
(206)920-2597
I N C
9800
1136 VISTA PL, EDMONDS WA
OWNER
MIKE & CRYSTAL LANNING
98020
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
9/3/21
R14542
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
9/3/21
R14542
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$15.00
$15.00
9/3/21
R14542
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/12/21
R13925
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$30.00
$30.00
9/3/21
R14542
TRAP
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
9/3/21
R14542
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$287.00
$287.00
9/3/21
R14542
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$243.95
$243.95
8/12/21
R13925
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
9/3/21
R14542
TOTALS:
$737.45
$737.45
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, December 21, 2021 9:54:57 AM 1 of 2
'RESIDENTIAL
BLDG Permit
of Edmonds PERMIT NUM
EdmondsCity
98020 1 1 •
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONSSchedule
•https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-3 MECH ROUGH IN
X-3 BUILDING FINAL"
B-4 FRAMING
B-5 INSULATION ENERGY
B-3 PLUMB GROUND WK
B-7 BUILDING OTHER INSP
B-3 PLUMB ROUGH IN
Printed: Tuesday, December 21, 2021 9:54:57 AM 2 of 2