REVIEWED BLD RESUB1 STRUCTURAL NOTESt3LU1U1U-U2U1 [A-1 ramp has four 2"X6"X6'1"5/16 joists. The RESUB joists are ripped at 1 to 5 7/8. And are May 092021 CITY OF EDMONDS conected to 2"X6"X4' header at 16" on centerEVELOPARTMENRVICES with 311x.131 fraiming nails. This is the begining of the ramp and is conected to ramp A-2 with 1/2" X4" bolts with washers. [A-2 ramp has four 211X6"X12' joists and end with a 211X6"X4' header at each end fastend by 3"X.131 framing nails. Jiost spread is 1 6" on center. And simpson strong ties LSU26 are used at end conecting to landing D. A-2 is conected to landing D with 1/211X4" bolts with washers. A-2 leaves concrete pad and conects to landing D at a 1:12 slope. There are two 411X4" posts, one on each side at 6' on center conected to outside joists with 1/211X6" bolts with 2" square steel washers. Post bolted to 1211X8"X8" dobie bock set in ground. [D landing is framed in with 211X6"X5' and joist are the same. Spread 16" on center. 411X4"posts are conected to outside corners where A2 conects to D and these are bolted with 1/2" bolt and 2"square washers. Post ar also conected to 1211X8"X8" dobie blocks. All 2"X6" famed with 311x.131 framing nails. And all 1 /2" bolts are on center of posts. t3LU1U1U-U2U1 [B ramp has four 211x6"x11' joists that end wiAESUB May 2"x6"x4' header at each end. They ae framedYOFE OND DEVELOPMENT SERVICES DEPARTMENT with 16" on center spread and fastend with 311x.131 framing nails. Simpson stong tie LSU26 used on highside of two center joist and LUS26Z on lower two center joist. Two 411x4" posts on 1211x8"x8" dobie bocks placed on both outside joists with 1/2 11 x6" bolts and 2"steel washers. B is conented to D and E with 1/211x4" bolts. Ramp B is mounted center mass between both landings. [E landing is framed with 211x6"x5' board and all 211x6"x5' joist are spaced at 16" on center. E has two 411x4" posts. one bolted to to E and C where they conect and second post is directly across landing and once again both posts are bolted to 1211x8"x8" dobie blocks. on the building side E is anchor bolted to building foindation 411x3/8" anchor bolts. [C ramp is framed with three 211x6"xg'6" joists. Joists conect to a 211x6"x4' header on low side this header is bolted to landing E. Center two joists are conected to this header with simpson stong ties LUS26Z. Second header is211x1211x5'4". Joists are conect to this header with simpson 1ULU-U U1 strong ties LSU26. Header is on high si_.P o. ramp and is bolted to existing concrete landiRgSUB with 411X3/8" anchor bolts. Joist have a s ready °o1 p DEVELOPMENT SERVICES DEPARTMENT 16" on center. Joist next to building is cut in three sections to work around existing electrical fixtures and is conected to building with 411x3/8" lag bolts. Note C-1. C-1 is fourth joist cut into three sections. C-A is 211X611X4'4" and is conected to building with 511x3/8 lag bolts. Starting at low side they are set in center at Y-9.5"-23"-36". C-B bolt patern is 4"-15.5"-29.5. C-C bolt patern is 5.5"-18" [F is a raised landing over existing concrete landing. It is framed in with three 211X4"X51511 . Where boards meet building they are secured with 411x3/8 lag bolts spaced 16" apart. Joists run to steps and there are two on building side F-1 for framing purposes. F-2 showes a 211x10"x5'5" header that sits on existing concrete. All joist are secure to concret 4' away from door with L brackets and anchor bolts [G stair stringer are held in place buy six steped stringers with 5" risers and 11"tread. Stair width is 59" there are five risers conected to the heade of F with simpson stong ties LSU26. Stair treads are 1211x4'11" """"bLU1 LU,U U1 [Railing is framed with 4x4s, 2x4 an x S 0 "s Hand railing will be 36" in hight. Railing itself ROUB May 9 2021 be 48" in hi ht. Railing will be continuse arour ENTSERVICES DEPARTMENT both sides of ramp and one side of steps and extend no less then 12" from end of ramp and steps t3LU2U2U-U2U2 RESUB May 09 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT t3LU2U2U-U2U2 RESUB May 09 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT