Loading...
APPROVED BLD BLD2021-0769+Plumbing_Plan+6.7.2021_6.10.14_AM+2234343GENERAL NOTES 1. REFERENCE TO RELATED WORK: "REF" INDICATIONS DENOTE WORK COVERED ELSEWHERE (ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL, LANDSCAPE, OR KITCHEN), OR ITEM BASED ON A SPECIFIC MANUFACTURER'S DIMENSIONS (VERIFY). 2. ELECTRICAL CHARACTERISTICS: REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS (VOLTAGES, ETC. OF MECHANICAL EQUIPMENT, UNLESS OTHERWISE INDICATED. 3. CODES: COMPLETE INSTALLATION OF THE PLUMBING SYSTEM SHALL BE PER THE APPLICABLE BUILDING, MECHANICAL, ENERGY, PLUMBING, FIRE, AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL AHJ. 4. PLUMBING CONTRACTOR SHALL LOCATE AND COORDINATE EXACT LOCATION OF ALL PLUMBING EQUIPMENT WITHIN THE STRUCTURE. 5. ACCESS DOORS: COORDINATE WITH ARCHITECT AND LOCATE ALL ACCESS DOORS ON SHOP DRAWINGS PRIOR TO BEGINNING OF CONSTRUCTION. ACCESS DOORS IN FIRE RATED STRUCTURE SHALL BE FIRE RATED. VERIFY ACCESS DOOR LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO BIDDING. 6. EXPOSED PIPING: PROVIDE CHROME PLATING FOR EXPOSED PIPING IN FINISHED ROOMS. 7. PENETRATIONS: PROVIDE ESCUTCHEON PLATES FOR EXPOSED PIPING PENETRATIONS AND SHEET METAL FLASHING FOR EXPOSED DUCTWORK PENETRATIONS. 8. ACCESS CLEARANCES FOR MAINTENANCE AND REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. COORDINATE LOCATIONS OF MECHANICAL WORK AND WORK OF OTHER TRADES TO PROVIDE ACCESS CLEARANCES FOR SERVICE AND MAINTENANCE. COORDINATION REQUIREMENTS 1. PLUMBING FIXTURES & EQUIPMENT: COORDINATE EXACT LOCATION OF ALL PLUMBING FIXTURES & EQUIPMENT WITH ARCHITECTURAL AND OTHER TRADES DOCUMENTS. 2. PIPING: COORDINATE EXACT LOCATION OF ALL STRUCTURAL FRAMING & FOOTINGS AND FINALIZE THE EXACT ROUTING OF ALL PIPES WITH STRUCTURAL ENGINEER AT THE SITE PRIOR TO AND DURING THE CONSTRUCTION. COORDINATE UNDER GRADE PIPING & FOUNDATION DRAINAGE PIPING WITH CIVIL ENGINEER. 3. ADJUSTMENTS: ALL EQUIPMENT, MOTORS, FANS GAS BURNERS, IGNITION DEVICES, DRIVES, ETC. SHALL BE ADJUSTED AND BALANCED TO OPERATE AT SPECIFIED RATINGS AS REQUIRED FOR THIS PROJECT SITE AND ACCOUNTING FOR ELEVATION ABOVE SEA LEVEL. 4. APPROVALS: MECHANICAL AND PLUMBING EQUIPMENT SHALL BE APPROVED FOR INSTALLATION IN THE PROJECT LOCATION AND SHALL HAVE ALL CERTIFICATIONS AND RATINGS TO MEET ALL ENERGY, POLLUTION, ENVIRONMENTAL, SEISMIC, APPLICABLE CODES AND REGULATIONS. THE CONTRACTOR SHALL COORDINATE WITH MANUFACTURE SUPPLIERS AND SHALL INCLUDE ALL COSTS REQUIRED TO MEET THE BID DOCUMENTS. 5. PRIOR TO PIPING INSTALLATION: PLUMBING CONTRACTOR TO COORDINATE PIPING LAYOUT WITH ALL OTHER TRADES. 6. ACCESS: COORDINATE ALL ACCESS LOCATIONS WITH GENERAL CONTRACTOR AND ARCHITECT TO ENSURE ALL REQUIRED ACCESS HATCHES, ACCESS PANELS & ACCESS COVERS ARE PROVIDED. 7. ANY DISCREPANCIES SHOULD BE REPORTED TO THE ARCHITECT IMMEDIATELY. SYMBOLS GENERAL ARCHITECTURAL BACKGROUND (THIN LINE) NEW PIPING (HEAVY LINE) EXISTING PIPING (THIN LINE) EXISTING WORK TO BE REMOVED MATCHLINE OR PROPERTY LINE CONNECTION TO EXISTING SECTION IDENTIFICATION INDICATES DIRECTION OF CUTTING PLANE LETTER INDICATES SECTION A (NO. INDICATES DETAIL) P-3 P-3 SHEET NUMBER WHERE SECTION IS DRAWN SHEET NUMBER WHERE SECTION IS TAKEN DETAIL IDENTIFICATION # DETAIL NUMBER DRAWING/SHEET NUMBER EQUIPMENT TYPICAL EQUIPMENT DESIGNATION HWCP-1 MN W WASTE BELOW GRADE W WASTE ABOVE GRADE PW PUMPED WASTE IW INDIRECT WASTE SS SANITARY SEWER BELOW GRADE SS SANITARY SEWER ABOVE GRADE PSS PUMPED SANITARY SEWER V VENT SD STORM DRAIN OD OVERFLOW STORM DRAIN PSD PUMPED STORM DRAIN CD CONDENSATE DRAIN PCD PUMPED CONDENSATE DRAIN - COLD WATER (CW) - - HOT WATER (HW), POTABLE, 120`F - - 140 HOT WATER, POTABLE, TEMPERATURE OTHER THAN 120°F - - - HOT WATER CIRCULATING (HWC), POTABLE, 120°F — - - - 140 HOT WATER CIRCULATING, POTABLE, TEMPERATURE OTHER THAN 120°F FOF FUEL OIL FILL FOS FUEL OIL SUPPLY FOR FUEL OIL RETURN — — FOV — FUEL OIL VENT RV RELIEF VENT G LOW PRESSURE NATURAL GAS MPG MEDIUM PRESSURE NATURAL GAS IRR IRRIGATION (NON POTABLE) F FIRE MAIN PIPE SYMBOLS Mi, TOP PIPE CONNECTION BOTTOM PIPE CONNECTION Y PIPE TURNING UP D PIPE TURNING DOWN/DROP PIPE CAP PIPE PLUG UNION FLANGE WYE STRAINER WYE STRAINER WITH CAPPED HOSE END BLOWDOWN VALVE ABBREVIATIONS ABV ABOVE FLR AD AREA DRAIN FPM BALL VALVE AFF ABOVE FINISHED FLOOR FPS AHJ AUTHORITY HAVING JURISDICTION FS BFF BELOW FINISHED FLOOR FT BALL VALVE BFP BACKFLOW PREVENTER FU BOH BACK OF HOUSE G GLOBE VALVE BP BOOSTER PUMP GAL BT BATHTUB GD CHECK VALVE BTUH BRITISH THERMAL UNIT PER GM HOUR GPG BALANCING OR PLUG VALVE BV BALANCING VALVE GPM C COMMON GV BUTTERFLY VALVE CAP CAPACITY GWB CB CATCH BASIN GWH CD CONDENSATE DRAIN HB FLEXIBLE CONNECTION IN PIPING CFF CAPPED FOR FUTURE HD CFM CUBIC FEET PER MINUTE HDR CI CAST IRON HEDV aa PRESSURE REDUCING VALVE (PRV) CLG CLW CEILING, COOLING CLOTHES WASHER HORIZ HP PRV CO CLEANOUTS HPCW Q COMB COMBUSTION HW AUTOMATIC CONTROL VALVE, 2-WAY CONT CONTINUE, CONTROL HWC CONTR CONTRACTOR HWCP AUTOMATIC CONTROL VALVE, 3-WAY COTG CLEANOUTS TO GRADE HWR CP CIRCULATING PUMP HWST CV CHECK VALVE HX ID RELIEF VALVE CW COLD WATER ICW D DIAMETER ID DB DRY BULB, DECIBEL IE BALANCING/METERING VALVE DF DRINKING FOUNTAIN IHW DFU DRAIN FIXTURE UNITS IN BV DI DUCTILE IRON KS REDUCER DIM DIMENSION KW DN DOWN L DIRECTION OF FLOW DS DOWN SPOUT LAV DWG DRAWING LB A PIPE ANCHOR (E) EXISTING M EFF EFFICIENCY MBH PIPE ALIGNMENT GUIDE ELEC ELECTRIC MECH EQUIV EQUIVALENT MCA PIPE SUPPORT EWC ELECTRIC WATER COOLER MOCP i PS EWH ELECTRIC WATER HEATER MPG -D0c VALVE STATION OR ASSEMBLY EXT EXTERIOR, EXTERNAL MTD F FAHRENHEIT (N) FCO FLOOR CLEANOUTS NC INDIRECT DRAIN, PIPE TO DRAIN FD FLOOR DRAIN NO ID FDC FIRE DEPARTMENT CONNECTION OD POINT OF CONNECTION FF FINISHED FLOOR O RD OD ROOF DRAIN, OVERFLOW DRAIN FLOOR OPD FEET PER MINUTE OPNG FEET PER SECOND P FLOOR SINK PD FEET POC FIXTURE UNITS PRV GAS (LOW PRESSURE) GALLONS PS GARAGE DRAIN PSIG GAS METER GRAINS PER GALLON PSD GALLONS PER MINUTE PSS GATE VALVE PSW GYPSUM WALLBOARD PW GAS WATER HEATER RD HOSE BIBB REF HEAD RPBP HUB DRAIN HOSE END DRAIN VALVE RPM HORIZONTAL S HORSEPOWER SCH HIGH PRESSURE COLD WATER SCW HOT WATER SD HOT WATER RE -CIRCULATION SEP HOT WATER CIRCULATION PUMP SF HOT WATER RETURN SGSV HOT WATER STORAGE TANK SH HEAT EXCHANGER SO INDUSTRIAL COLD WATER SIP INDIRECT DRAIN, INSIDE DIAMETER SR INVERT ELEVATION SS INDUSTRIAL HOT WATER INCH SSS KITCHEN SINK STD KILOWATT SQ LONG, LENGTH TD LAVATORY TMV POUND TIP WATER METER TYP THOUSAND BTU PER HOUR UH MECHANICAL UON MIN. CIRCUIT AMPACITY UR MAX. OVER CURRENT PROTECTION V MEDIUM PRESSURE GAS VTR MOUNTED W NEW WC NORMALLY CLOSED WCO NORMALLY OPEN WHD OUTSIDE DIMENSION/DIAMETER WM OVERFLOW DRAIN/DECK DRAIN WSFU OVER PRESSURE DEVICE OPENING PUMP PRESSURE DROP, PLANTER DRAIN POINT OF CONNECTION PRESSURE REDUCING VALVE PRESSURE RELIEF VALVE PUMPED STORM DRAINAGE POUNDS PER SQUARE INCH GAUGE PUMPED STORM DRAINAGE PUMPED SANITARY SEWER PUMPED SANITARY WASTE PUMPED WASTE ROOF DRAIN REFERENCE REDUCED PRESSURE BACKFLOW PREVENTER REVOLUTIONS PER MINUTE SINK SCHEDULE SOFTENED COLD WATER STORM DRAIN SEWAGE EJECTOR PUMP SQUARE FOOT SEISMIC GAS SHUT-OFF VALVE SHOWER STORM OVERFLOW STATIC PRESSURE/SUMP PUMP SUDS RELIEF STAINLESS STEEL/SANITARY SEWER SIDE SANITARY SEWER STANDARD SQUARE TRENCH DRAIN THERMOSTATIC MIXING VALVE TRAP PRIMER TYPICAL UNIT HEATER UNLESS OTHERWISE NOTED URINAL VENT VENT THRU ROOF WASTE, WATT, WIDE WATER CLOSET WALL CLEANOUTS WALL HYDRANT WASHING MACHINE WATER SUPPLY FIXTURE UNITS ® ❑o FLOOR DRAIN DRAWING INDEX � HOSE BIBB DWG DESCRIPTION INCLUDED IN S E T BREAK IN PIPING OR DUCTWORK M GAS METER � N U) N M INLINE WATER METER LJ g � > Ln p� Ln PUMP wi o o LdLd T PRESSURE GAUGE P-0.0 LEGEND, GENERAL NOTES, AND DRAWING INDEX x P-0.1 PLUMBING NOTES, TABLES, AND CODES x THERMOMETER P/T t PRESSURE/TEMPERATURE P-1.0 FLOOR PLANS - FIRST & SECOND FLOOR x TEST PORT P-1.1 FLOOR PLAN - THIRD FLOOR x �4�I,,-,D*— REDUCED PRESSURE BACKFLOW P-2.0 ENLARGED PLAN - FIRST FLOOR x RPBP PREVENTER P-2.1 ENLARGED PLAN - SECOND FLOOR x P-2.2 ENLARGED PLAN - THIRD FLOOR x DOUBLE CHECK VALVE ASSEMBLY DCVA CATCH BASIN - SAND/OIL INTERCEPTOR TRENCH DRAIN I I I I I I I I I III III III I I i EMERGENCY GAS SHUT-OFF VALVE ITS— SEISMIC GAS SHUT-OFF VALVE F-1 WASHER BOX --a-GREASE INTERCEPTOR ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE r----------------------------------------------------------- Fire Rated Penetrations shall be maintained ----------------------------------------------------------- City Of Edmonds Building Department Work PLUMBING Address 750 EDMONDS WAY Owner SUNRISE SENIOR LIVING Approved Date 6-16-2021 Building Official Erica Cu-r(-er Permit Number BLD2021-0769 RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z z 0 0 w U) w 0 LLw 0 0 z ❑❑❑p0'0 00 ROeO000 ❑ a 0�0 �FGISTERF'.-• �000 O oO000 /ONAL 05 nOBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL CONTACT: JON ROBISON J J Of W Ld (n c� c� a_ a_ LLJ LLJ z z 0 ¢ w cc LLJ = 0 0 ¢ 9 (I Q CO o Z Z O o L � �ZW W W >: LLj� 00OD WIZ cA_o crzo ZQW 00Hp-. w 0 DATE: 05/21 /2021 N 0 m w C9 m C�� o m � cm 0 o O O O cv LJ ozz rn —1 0-- z O C& (j) z Mw W 0z 0 z SHEET TITLE: LEGEND, GENERAL NOTES, AND DRAWING INDEX SHEET NO. POOO PLUMBING TABLES PIPE INSULATION SCHEDULE OPTION 1 OPTION 2 SERVICE VAPOR RETARDER NOTES REQUIRED MATERIAL THICKNESS MATERIAL THICKNESS DOMESTIC COLD WATER, IRRIGATION WATER, CONDENSATE MINERAL -FIBER WITH JACKET ALL SIZES: Y2" PVC/NBR ALL SIZES: 3/g" YES 12,13 DRAINS, STORM DRAIN (IN CONDITIONED SPACE) (PIPE) ( DOMESTIC COLD WATER, IRRIGATION WATER, CONDENSATE MINERAL -FIBER WITH JACKET Y2" Y2" PVC/NBR ) Y2" PIPEY2" YES 7,8,10 DRAINS, WASTE (OUTSIDE THE CONDITIONED SPACE) ALL OTHER SIZES: 1" ALL OTHER SIZES: 3/4" DOMESTIC HOT WATER AND RECIRCULATED HOT WATER MINERAL -FIBER WITH JACKET %2"-1%4" PIPE: 1" PVC/NBR %2"-1%4" PIPE: 1" NO 3,9 (NONRESIDENTIAL) 1Y2"-4" PIPE:1.5" 1Y2"-4" PIPE:1.5" EXPOSED SANITARY DRAINS AND DOMESTIC WATER SUPPLIES TRUEBRO LAV-GUARD N/A N/A N/A NO 11 AND STOPS FOR ADA FIXTURES. NOTES: 1. PIPING INSULATION EXPOSED TO THE WEATHER SHALL BE PROTECTED FROM DAMAGE. CONTRACTOR SHALL PROVIDE SHIELDING FROM SOLAR RADIATION THAT CAN CAUSE DEGRADATION OF THE MATERIAL. ADHESIVE TAPE SHALL NOT BE PERMITTED. 2. PER 2018 WSEC SECTION R403.5.3 (RESIDENTIAL) INSULATION FOR HOT WATER PIPE SHALL HAVE A MINIMUM R-VALUE OF R-3. 3. PIPING FROM WATER HEATER TO THE TERMINATION OF HEATED WATER SUPPLY PIPE SHALL BE INSULATED IN ACCORDANCE WITH TABLE C403.2.9. 4. ON BOTH THE INLET AND OUTLET PIPING OF A STORAGE HOT WATER HEATER, THE FIRST 8 FEET OF PIPING OR PIPING FROM WATER HEATER TO HEAT TRAP SHALL BE INSULATED. 5. HEAT TRACED PIPING SHALL BE INSULATED IN THE SAME MANNER AS NON HEAT TRACED PIPING OR PER THE HEAT TRACE MANUFACTURER'S INSTRUCTIONS. 6. TUBULAR PIPING INSULATION SHALL NOT BE REQUIRED FOR THE FOLLOWING: 6.1. THE TUBING FROM THE CONNECTION AT THE TERMINATION OF THE FIXTURE SUPPLY PIPING TO A PLUMBING FIXTURE OR PLUMBING APPLIANCE. 6.2. VALVES, PUMPS, STRAINERS, AND THREADED UNIONS IN PIPING THAT IS 1 INCH OR LESS IN NOMINAL DIAMETER. 6.3. PIPING FROM USER -CONTROLLED SHOWER AND BATH MIXING VALVES TO THE WATER OUTLETS. 6.4. COLD WATER PIPING OF A DEMAND RECIRCULATION WATER SYSTEM. 6.5. TUBING FROM A HOT DRINKING -WATER HEATING UNIT TO THE WATER OUTLET. 6.6. PIPING AT LOCATIONS WHERE A VERTICAL SUPPORT OF THE PIPING IS INSTALLED. 6.7. PIPING SURROUNDED BY BUILDING INSULATION WITH A THERMAL RESISTANCE (R-VALUE) OF NOT LESS THAN R-3. 6.8. HOT WATER PIPING THAT IS PART OF THE FINAL PIPE RUN TO THE PLUMBING FIXTURE AND IS NOT PART OF THE HEATED -WATER CIRCULATION SYSTEM CIRCULATION PATH IS NOT REQUIRED TO MEET THE MINIMUM INSULATION REQUIREMENTS OF C404.6. 7. PER 2018 UPC SECTION 312.6 NO WATER, SOIL, OR WASTE PIPE SHALL BE INSTALLED OR PERMITTED OUTSIDE OF A BUILDING, IN ATTICS OR CRAWL SPACES, OR IN AN EXTERIOR WALL UNLESS, WHERE NECESSARY, ADEQUATE PROVISION IS MADE TO PROTECT SUCH PIPE FROM FREEZING. ALL HOT AND COLD WATER PIPES OUTSIDE THE CONDITIONED SPACE SHALL BE PROVIDED WITH INSULATION WITH A MINIMUM R-VALUE OF R-3. 8. HEAT TRACING SHALL BE PROVIDED FOR COLD WATER AND IRRIGATION WATER IN UNCONDITIONED SPACES. CONTACT ENGINEERING IF NECESSARY. PER 2018 WSEC SECTION C403.12.3 FREEZE PROTECTION SYSTEMS, SUCH AS HEAT TRACING OF OUTDOOR PIPING, SHALL INCLUDE AUTOMATIC CONTROLS CONFIGURED TO SHUT OFF THE SYSTEMS WHEN OUTDOOR AIR TEMPERATURES ARE ABOVE 407. 9. PER 2018 WSEC TABLE C403.2.9 INSULATION FOR HOT WATER AND HOT WATER RECIRCULATION SHALL HAVE A THERMAL CONDUCTIVITY OF 0.21-0.28 (BTU.IN/H.FT2.°F) AT OPERATING TEMPERATURE. 10. INSULATION R-VALUE SHALL MEET THE MINIMUM REQUIREMENT. THICKNESS IS BASED ON GRAINGER SAMPLE DATA FOR K-FLEX(PVC/NBR) AND OWENS CORNING(FIBER GLASS). 11. ALL ADA P-TRAPS, HOT WATER SUPPLY TUBING, AND SHUT-OFF COCKS SHALL BE PROTECTED WITH APPROVED COVERS TO PREVENT SCALDING. 12. REQUIRED BY ENGINEERING BASED ON BEST PRACTICE. 13. INSULATION IS NOT REQUIRED ON PLASTIC COLD WATER PIPING. PIPING SUPPORTS (SUPPLY) IALL SUSPENDED WATER SUPPLY PIPE SHALL BE I SUPPORTED AS FOLLOWS PER 2018 UPC TABLE 313.3: MAX. HORIZONTAL SPACING MAX. VERTICAL SPACING COPPER PIPE <1Y2" 6 FT. 10 FT. COPPER PIPE >2" 10 FT. 10 FT. COPPER TUBING <1Y2" 6 FT. 10 FT. COPPER TUBING >2" 10 FT. 10 FT. CPVC < 1 " 3 FT. 10 FT. CPVC > 1Y4" 4 FT. 10 FT. HANGER SPACING FOR WASTE AND VENT PIPING IALL SUSPENDED SANITARY AND VENT PIPE SHALL BE I SUPPORTED AS FOLLOWS PER 2018 UPC TABLE 313.3: MAX. HORIZ. SPACING MAX. VERT. SPACING ABS 4 FT. 10 FT. PVC (TYPE DWV) 4 FT. 10 FT. CAST-IRON HUBLESS* EVERY OTHER JOINT 15 FT. *CAST-IRON OVER 4' SHALL BE SUPPORTED AT EVERY JOINT PLUMBING FIXTURE FLOW RATES PER 2018 UPC CH. 4 FIXTURE TYPE FLOW RATE MAXIMUM FLOW RATE AT ? 20 PERCENT REDUCTION NOTES SHOWERHEADS 2.5 GPM @ 80 PSI 2 GPM @ 80 PSI LAVATORY FAUCETS, RESIDENTIAL 2.2 GPM @ 60 PSI 1.5 GPM ® 60 PSI 1 LAVATORY FAUCETS, NON-RESIDENTIAL 0.5 GPM @ 60 PSI 0.4 GPM ® 60 PSI 2 KITCHEN FAUCETS 2.2 GPM @ 60 PSI 1.8 GPM ® 60 PSI 3 GRAVITY TANK -TYPE WATER CLOSETS 1.6 GALLONS/FLUSH 1.28 GALLONS/FLUSH 4 FLUSHOMETER TANK WATER CLOSETS 1.6 GALLONS/FLUSH 1.28 GALLONS/FLUSH 4 FLUSHOMETER VALVE WATER CLOSETS 1.6 GALLONS/FLUSH 1.28 GALLONS/FLUSH 4 ELECTROMECHANICAL HYDRAULIC WATER CLOSETS 1.6 GALLONS/FLUSH 1.28 GALLONS/FLUSH 4 URINALS 1.0 GALLONS/FLUSH 0.5 GALLONS/ FLUSH NOTES: 1 • LAVATORY FAUCETS SHALL NOT HAVE A FLOW RATE LESS THAN 0.8 GPM AT 20 PSI. 2• WHERE COMPLYING FAUCETS ARE UNAVAILABLE, AERATORS RATED AT 0.35 GPM OR OTHER MEANS MAY BE USED TO ACHIEVE REDUCTION. 3. KITCHEN FAUCETS MAY TEMPORARILY INCREASE FLOW ABOVE THE MAXIMUM RATE, BUT NOT ABOVE 2.2 GPM @ 60 PSI AND MUST DEFAULT TO A MAXIMUM FLOW RATE OF 1.8 GPM @ 60 PSI. 4. INCLUDES SINGLE AND DUAL FLUSH WATER CLOSETS WITH AN EFFECTIVE FLUSH OF 1.6 GALLONS OR LESS. SINGLE FLUSH TOILETS - THE EFFECTIVE FLUSH VOLUME SHALL NOT EXCEED 1.6 GALLONS. THE EFFECTIVE FLUSH VOLUME IS THE AVERAGE FLUSH VOLUME WHEN TESTED IN ACCORDANCE WITH ASME A112.19.2 DUAL FLUSH TOILETS - THE EFFECTIVE FLUSH VOLUME SHALL NOT EXCEED 1.6 GALLONS. THE EFFECTIVE FLUSH VOLUME IS DEFINED AS THE COMPOSITE, AVERAGE FLUSH VOLUME OF TWO REDUCED FLUSHES AND ONE FULL FLUSH. FLUSH VOLUMES WILL BE TESTED IN ACCORDANCE WITH ASME A112.19.2 AND ASME A112.19.14. NOTE TO CONTRACTOR DRAWINGS ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, LAYOUT, AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENT. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS. REFER TO MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND INSTALLATION REQUIREMENTS. PROVIDE DUCTWORK, CONNECTIONS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. CONTRACTOR SUBSTITUTIONS 8 REVISIONS PLEASE SUBMIT PROPOSALS FOR SUBSTITUTIONS OR REVISIONS FOR REVIEW AND APPROVAL PRIOR TO ORDERING MATERIAL OR DOING WORK. FOR EQUIPMENT THAT IS SCHEDULED BY MANUFACTURER'S NAME AND CATALOG DESIGNATIONS, THE MANUFACTURER'S PUBLISHED DATA AND/OR SPECIFICATION FOR THAT ITEM ARE CONSIDERED PART OF SPECIFICATION. ENGINEERING COSTS FOR REVISING MEP PLANS SHALL BE ADDRESSED IN THE COST ANALYSIS OF THE SUBSTITUTION PROPOSAL. CONTRACTOR TO COORDINATE WITH ENGINEER AND DETERMINE ASSOCIATED DESIGN AND PERMITTING COSTS. CONTRACTOR SHALL BE RESPONSIBLE FOR OTHER COSTS ASSOCIATED WITH UNFORESEEN ISSUES RESULTING FROM SUBSTITUTIONS OR REVISIONS. PIPE MATERIALS APPROVED PLUMBING MATERIAL: ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED LISTING AGENCY. 1. ABOVEGROUND WATER DISTRIBUTION PIPING: COPPER, TYPE L OR PEX. 2. UNDERGROUND WASTE & VENT PIPING: NO HUB CAST IRON, ABS SCHEDULE 40 NOTE 1: EXTERIOR INSTALLATIONS OF ABS AND PVC PIPING FOR CONDENSATE DRAINAGE AND ABOVE GROUND VENTING SHALL BE PROTECTED FROM DIRECT EXPOSURE TO SUNLIGHT PER 2016 CPC 312.13 AND 312.14 3. ABOVE GROUND WASTE & VENT PIPING: NO HUB CAST IRON, ABS SCHEDULE 40. 4. CONDENSATE DRAIN PIPING: CPVC OR COPPER TYPE M. 5. TEMPERATURE AND/OR PRESSURE RELIEF VALVE DISCHARGE PIPING: COPPER TYPE M 6. GAS PIPING: STEEL PIPE, ASTM A 53; TYPE E OR S; GRADE B; SCHEDULE 40. PLUMBING NOTES CONNECTIONS: PROVIDE PLUMBING FIXTURE CONNECTIONS TO BUILDING 27. INSULATION MATERIAL SHALL MEET CITY OF KIRKLAND QUALITY WASTE, VENT, COLD WATER, AND HOT WATER SYSTEM IN ACCORDANCE STANDARDS. WITH DRAWINGS, MANUFACTURER'S RECOMMENDATIONS, AND LOCAL CODES. CONNECT TO EACH FIXTURE, EQUIPMENT, ETC. WITH ALL 28. ALL PIPING AND DUCTWORK SHALL BE INSULATED CONSISTENT WITH ACCESSORIES, VALVES, VACUUM BREAKERS, REGULATORS, UNIONS, THE 2018 WASHINGTON STATE ENERGY CODE. ETC. AS REQUIRED AND AS RECOMMENDED BY THE MANUFACTURERS. REFER TO PLUMBING FIXTURE CONNECTION SCHEDULE ON PLANS. 29. BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH 2018 UPC 701.0 AND 903.0. 2. HOT AND COLD: WATER PIPING CONNECTION TO EACH FIXTURE SHALL BE COLD WATER ON THE RIGHT HAND SIDE AND HOT WATER ON THE 30. ALL SANITARY SYSTEM MATERIAL SHALL BE LISTED BY AN APPROVED LEFT HAND SIDE. LISTING AGENCY. 3. HOT WATER: NON -CIRCULATING HOT WATER PIPE SHALL NOT EXCEED 31. ALL STORAGE WATER HEATING EQUIPMENT SHALL BE PROVIDED WITH 10' UNLESS OTHERWISE SHOWN ON DRAWINGS. AN APPROVED, LISTED EXPANSION TANK OR OTHER DEVICE DESIGNED FOR INTERMITTENT OPERATION FOR THERMAL EXPANSION CONTROL PER 4. VENT STACKS: COORDINATE VENT STACK WITH HVAC EQUIPMENT TO 2018 UPC 608.3. MAINTAIN MINIMUM 10' CLEARANCE FROM OUTSIDE AIR INTAKES. 32. WATER HEATERS SHALL BE ANCHORED OR STRAPPED TO RESIST 5. CLEANOUTS: PROVIDE CLEANOUTS PER CURRENT UPC AND AS HORIZONTAL DISPLACEMENTS DUE TO SEISMIC MOTION PER 2018 UPC REQUIRED BY LOCAL JURISDICTIONS. CLEANOUTS SHALL BE LOCATED 507.2. IN WALLS/FLOORS WHERE THEY ARE NOT HIGHLY VISIBLE. FLOOR CLEANOUTS IN CARPETED AREAS TO BE FITTED WITH CARPET INSERTS. 33. MATERIAL EXPOSED WITHIN A DUCT OR PLENUM SHALL COMPLY WITH LOCATIONS SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL. 2018 IMC 602.2.1. NOTE: NOT ALL CLEANOUTS ARE SHOWN ON THE PLUMBING DRAWINGS. 34. CONTRACTOR SHALL PROVIDE FIRESTOPPING AT PENETRATIONS AS 6. SHUT -OFFS: PROVIDE 1 /4 TURN BALL VALVE ANGLE STOP SHUT-OFF NECESSARY TO RETAIN THE FIRE RATING OF ALL ASSEMBLIES. ALL WORK SHALL BE IN COMPLIANCE WITH CODE REQUIREMENTS FOR THE VALVES AND BRAIDED STAINLESS STEEL FLEX CONNECTORS AT HOT BUILDING CONSTRUCTION TYPE. AND COLD WATER SUPPLY TO EACH FIXTURE. EXCEPTION: PROVIDE SCREWDRIVER STOPS AT BATH/SHOWERS. 35. PLUMBING CONTRACTOR SHALL PROVIDE REDUCED PRESSURE BACKFLOW PREVENTERS OR OTHER APPROVED BACKFLOW PREVENTION 7. TRAP ARMS: PROVIDE TRAP ARMS SUCH THAT THE MAXIMUM LENGTH DEVICE WHERE REQUIRED BY HEALTH AUTHORITIES, FOOD SERVICE WILL NOT EXCEED CODE REQUIREMENTS. DRAWINGS, APPLIANCE MANUFACTURER INSTRUCTIONS AND BY CODE. 8. ADA INSULATION: AT PLUMBING PIPING EXPOSED UNDER LAVATORIES, INSULATE THE EXPOSED PIPING AND TRAPS WITH PRODUCT SPECIFICALLY DESIGNED FOR THIS APPLICATION MEETING ADA REQUIREMENTS. PROVIDE HANDI-LAV GUARD OR EQUIVALENT. OFFSET P-TRAPS TO CLEAR WHEELCHAIR ACCESS. 9. GAS EQUIPMENT: GAS EQUIPMENT SHALL BE INSTALLED PER EQUIPMENT LISTINGS, APPLICABLE IFGC, UPC, LOCAL CODES & NFPA STANDARDS. 10. GAS CONNECTIONS: INSTALL FLEXIBLE QUICK DISCONNECT ASSEMBLIES FOR ALL GAS FIRED KITCHEN EQUIPMENT PER APPLICABLE IFGC, UPC, LOCAL CODES & NFPA STANDARDS. PROVIDE LOCKABLE GAS SHUT-OFF VALVES FOR FIREPLACES & BBQS IN UNATTENDED PUBLIC LOCATIONS IN THE BUILDING. 11. GAS PIPING INSTALLATION: STEEL OR MALLEABLE IRON FUEL LINES 2" OR SMALLER SHALL BE ASSEMBLED USING THREAD SEALANT SUITABLE FOR NATURAL GAS. GAS PIPING LARGER THAN 2" SHALL HAVE WELDED FITTINGS. 12. GAS PIPING ABOVE GROUND: WHERE PASSING THROUGH AN OUTSIDE WALL, GAS PIPING SHALL BE PROTECTED AGAINST CORROSION BY COATING OR WRAPPING WITH AN INERT MATERIAL. WHERE PIPING IS ENCASED IN A PROTECTIVE PIPE SLEEVE, THE ANNULAR SPACE BETWEEN THE PIPING AND THE SLEEVE SHALL BE SEALED. 13. GAS PIPE SUPPORT: FUEL LINES SHALL BE SUPPORTED OR STRAPPED, AND SHALL BE PLUMB AND SQUARE. 14. WATER HAMMER ARRESTORS: PROVIDE AT THE END OF HOT AND COLD WATER LINES SERVING TWO OR MORE FIXTURES; SIZE IN ACCORDANCE WITH PLUMBING AND DRAINAGE INSTITUTE (PDI) REQUIREMENTS. WATER HAMMER ARRESTORS ARE REQUIRED FOR QUICK CLOSING VALVES, SUCH AS LAUNDRY WASHERS, FLUSH VALVES (PUBLIC TOILETS), ETC. 15. TRAP PRIMERS AS SPECIFIED: PROVIDE TRAP PRIMERS AND PIPING FOR FLOOR DRAINS, FLOOR SINKS, AREA DRAINS & HUB DRAINS. ARRANGE PIPING TO ACHIEVE EQUAL FLOW TO EACH DRAIN AND FLOOR SINK FOR TRAP PRIMERS SERVING MULTIPLE DRAINS AND FLOOR SINKS. COORDINATE EXACT LOCATIONS WITH ARCHITECT & ELECTRICAL ENGINEER. 16. P-TRAPS: ALL EXPOSED P-TRAPS SHALL BE CHROME -PLATED BRASS. P-TRAPS SERVING HANDICAPPED COUNTER TOP LAVATORIES SHALL BE INSULATED. 17. THROUGHOUT THE PROJECT PROVIDE BALL VALVES. GATE VALVES SHALL NOT BE USED. NO EXCEPTIONS. 18. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FLANGES AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL VALVES, AND OTHER COMPONENTS TO ALLOW DISASSEMBLY FOR MAINTENANCE. 19. REDUCERS: PROVIDE AS REQUIRED FROM LINE PIPE SIZE TO EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CONNECTION SIZES. 20. OFFSETS: PROVIDE FOR BRANCH LINES TO EQUIPMENT. 21. ALL TEMPERATURE MIXING VALVES SHALL COMPLY WITH ASSE-1070 SAFETY STANDARDS. 22. PROVIDE APPROVED PIPE HANGERS & PIPE SUPPORTS IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND 2018 UPC TABLES 313.3 & 313.6. SUBMIT FOR APPROVAL. 23. DIELECTRIC UNIONS: PROVIDE AT CONNECTIONS OF DISSIMILAR PIPE. 24. PIPING & EQUIPMENT SUPPORTS/HANGERS & SEISMIC RESTRAINTS TO BE DESIGNED BY DESIGN BUILT CONTRACTOR. 25. IF NEEDED, PROVIDE VACUUM BREAKERS AT ALL HOSE BIBBS. 26. FLOOR DRAINS OR SIMILAR TRAPS DIRECTLY CONNECTED TO THE DRAINAGE AND SUBJECT TO INFREQUENT USE SHALL BE PROVIDED WITH AN APPROVED AUTOMATIC MEANS OF MAINTAINING THEIR WATER SEALS IN ACCORDANCE WITH 2O18 UPC 1007.0. PROVIDE REQUIRED & PROPER BACK FLOW PREVENTERS AS SPECIFIED FOR THE APPLIANCES INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: a. ICE MACHINES AND ICE MAKERS b. CARBONATED BEVERAGE DISPENSING SYSTEMS C. COFFEE BREWERS d. ESPRESSO MACHINES e. WATER FILTERS f. STEAM OR HOT WATER BOILERS g. IRRIGATION SYSTEM h. FIRE PROTECTION SYSTEM I. CHEMICAL TREATMENT SYSTEM j. SOAP/CHEMICAL DISPENSER SYSTEM k. COMMERCIAL WASHER APPLICABLE CODES THE FOLLOWING PROJECT DESIGN IS BASED ON THE FOLLOWING CODES: -2018 INTERNATIONAL BUILDING CODE (IBC) & WASHINGTON STATE AMENDMENTS -2018 INTERNATIONAL MECHANICAL CODE (IMC) & WASHINGTON STATE AMENDMENTS -2018 UNIFORM PLUMBING CODE (UPC) & WASHINGTON STATE AMENDMENTS -2018 WASHINGTON STATE ENERGY CODE (WSEC) -2018 INTERNATIONAL FUEL GAS CODE (IFGC) & WASHINGTON STATE AMENDMENTS RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z z 0 0 F- U) w U � w 0 LLw Q 0 0 z �AF(� �o00 05 nOBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL CONTACT: JON ROBISON J J w Ld cn 0 0 a a_ �LJ LLJ > z z 0 Q w cc LLJ = 0 0 I U Q 9 (I A Q CO o Z Z O o G � �ZW WWI LLj� 000D Wa.Z COD cr ZQW �Hp-. 0 w 0 DATE: 05/21 /2021 0 m w C9 m cf) cy)� o m cm LLI Q m �z- 0 o O p O N ULj O - -1 0- z O 0 Vl z mw w 0z 0 z w SHEET TITLE: PLUMBING NOTES, TABLES, AND CODES SHEET NO. Pool ❑ ❑ ❑ SEE P2.0 ENLARGED PLANS SEE P2.1 ENLARGED PLANS 0 HAIR SALON I I I ° I 125 I I ----- J RECEIVED PROPOSED PLAN PROPOSED PLAN Jun 072021 FIRST FLOOR SECOND FLOOR CITY OF MONDS DEVELOPMENT SERVICES DEPARTMENT SCALE: 3 32" = 1'-0" SCALE: 3 32" = 1'-0" cn Z z O U F- U) IZ > 0, w U Q-' cn w 0 w Q 0 O z ❑0OpOo o° R0e0000 /S 13 �� o : ❑ ❑ cn z ❑ ❑ 4 0;0�O VFFcisrE� oo°000N000005�`�1�`�� 0 ROBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD,WA98036 206-364-3343 TEL CONTACT: JON ROBISON LLI LLI (n O a a_ LLJ z z O CD U cif Q �n w w w = w 0 o U Q Q AI Q CD 09 Z O Z 50 L 0 Z w ww 00� Wa.Z Colo Ftza ZQw coF-a U LLI O DATE: 05/21 /2021 N O co LLI I-- Cf? M Wit' O (y) Ld Q � c9 Iz— 0 O p O N W O Z Z J 0— U 0 Vl j � C� z mw w 0z 0 10 z w SHEET TITLE: FLOOR PLANS - FIRST & SECOND FLOOR SHEET NO. Pi 00 F---------------------------------------- I I I I I I I I I I I I I I I I I I I I I I I I I I L— PROPOSED PLAN THIRD FLOOR RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z z O U F- U) � w U w w 0 ILL 0 O z FGIST�04� l4k/oaoo0�o 05 nOBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL CONTACT: JON ROBISON J J W W (n C� C� a_ 0_ z z o ¢ w w cc LLJ = w 0 o U ¢ Q (m Q 0® Q c o Z Z O o G � Z w w w >: o0OD wa.Z cA_o crza ZQw CODF-a U w 0 DATE: 05/21 /2021 SHEET TITLE: FLOOR PLAN - THIRD FLOOR cv 0 m w Qo M m � 0 � m � OC) m Q � m Iz- 0 O O O O cv LJ � Z Z -1 00- z od Vl z mw w 0z 0 z w SHEET NO. Pi 0 1 SCALE: 3/32" = 1'-O" FLAG NOTES 1. REMOVE AND REPLACE EXISTING SINK. FURNISH AND INSTALL NEW SINK, FAUCET, POP UP DRAIN ASSEMBLY AND PLUMBING CONNECTIONS. CONNECT TO EXISTING PLUMBING LINES. 2. REMOVE AND REPLACE EXISTING HAIR SHAMPOO STATION. CONNECT TO EXISTING PLUMBING LINES EXISTING ENLARGED DEMO PLAN FIRST FLOOR — HAIR SALON SCALE: 1/2" = 1'-0" PLUMBING FIXTURE SCHEDULE PLAN MARK ROOM LOCATION SERVICE SIZE — INCHES FIXTURE TYPE BASIS OF DESIGN MODEL NOTES CW HW W V S-1 HAIR SALON 1/2 1/2 2 1-1/2 SINGLE BOWL — UNDERMOUNT JUST SINKS US-1114—A HAIR SALON FAUCET CONTRACTOR TO VERIFY FAUCET MODEL WITH CLIENT. S-2 HAIR SALON 1/2 1/2 2 1-1/2 PIVOTING BOWL BELVEDERE 8600 CLO-01 AS REQUIRED — — — — — — — — — — — — FLOOR CLEANOUT JAY R. SMITH 4020 CLO-02 AS REQUIRED — — — — — — — — — — — — WALL CLEANOUT JAY R. SMITH 4402 NEW ENLARGED PROPOSED PLAN FIRST FLOOR — HAIR SALON SCALE: 1/2" = 1'-0" RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z z O 0 F- U) � w U� w 0 W 0 O z AF(� �o00 O STEIF ��ooaoo00o "1��1 05 nOBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL CONTACT: JON ROBISON J J w w (n C� C� a_ 0_ z z o ¢ w w cc LLJ = w 0 0 I U ¢ O (I O 0® Q c o Z Z O o G � Z w ww> 00OD wa.Z cA_o FtZo Zaw �Hpw. I- U Iw 0 DATE: 05/21 /2021 0 m w �Mm � 0 � m � OC) m Q � m Iz— 0 O O O O cv LJ � � Z —1 00— z 0 C& (j) z mw w 0z 0 z w SHEET TITLE: ENLARGED PLAN - FIRST FLOOR SHEET NO. P2mO FLAG NOTES 1. REMOVE EXISTING VANITY AND SINK. FURNISH AND INSTALL NEW SINK TO INCLUDE: SINK, LEVER HANDLE FAUCET SET, POP UP DRAIN ASSEMBLY AND PLUMBING CONNECTIONS. CONNECT TO EXISTING PLUMBING LINES. EXISTING ENLARGED DEMO PLAN SECOND FLOOR — NURSE ROOM SCALE: 1/2" = 1'-0" PLUMBING FIXTURE SCHEDULE PLAN MARK ROOM LOCATION SERVICE SIZE — INCHES FIXTURE TYPE BASIS OF DESIGN MODEL NOTES CW HW W V S-3 NURSE ROOM 1/2 1/2 2 1-1/2 SINGLE BOWL — UNDERMOUNT BLANCO 441026 NURSE ROOM FAUCET MOEN 7735 SRS SIDE SPRAY NOT INSTALLED CLO-01 AS REQUIRED — — — — — — — — — --- FLOOR CLEANOUT JAY R. SMITH 4020 CLO-02 AS REQUIRED — — — — — — — — — --- WALL CLEANOUT I JAY R. SMITH 4402 NEW ENLARGED PROPOSED PLAN SECOND FLOOR — NURSE ROOM SCALE: 1/2" = 1'-0" RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z z 0 0 F- U-) w V) w 0 LLW 0 O z FGIST�04� go 0�ooaoo��o "1��1 05 nOBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL CONTACT: JON ROBISON J J W W (n C� C� a_ 0_ z z 0 ¢ w cc LLJ = 0 0 0 ¢ O (I O 0® Q c o z Z O o G � Z w ww> 00OD wa.Z cA_o crZo Z¢w �Hpw. I- 0 w 0 DATE: 05/21 /2021 0 m w �Mm � 0 � m � OC) m Q � m Iz— 0 O 0 O O cv LJ � � Z -1 00- z od (j) z mw w 0z 0 z w SHEET TITLE: ENLARGED PLAN - SECOND FLOOR SHEET NO. P2ml PLUMBING FIXTURE SCHEDULE PLAN MARK ROOM LOCATION SERVICE SIZE - INCHES FIXTURE TYPE BASIS OF DESIGN MODEL NOTES CW HW W V S-4 ACTIVITY ROOM 1/2 1/2 2 1-1/2 SINGLE BOWL - UNDERMOUNT BLANCO 441026 ACTIVITY ROOM FAUCET MOEN 7594EWSRS S-5 RESIDENT LAUNDRY 1/2 1/2 2 1-1/2 SINGLE BOWL - UNDERMOUNT BLANCO 441026 RESIDENT LAUNDRY FAUCET MOEN 7594EWSRS S-6 SERVERY 1/2 1/2 2 1-1/2 DOUBLE BOWL - UNDERMOUNT BLANCO 441020 SERVERY FAUCET MOEN 7594EWSRS S-7 SERVERY 1/2 1/2 2 1-1/2 SINGLE BOWL - UNDERMOUNT BLANCO 441026 SERVERY FAUCET MOEN 7594EWSRS LAV-1 TOILET 1/2 1/2 2 1-1/2 LAVATORY TOILET FAUCET BRADLEY CROP S53-3100 WC-1 TOILET 1/2 1/2 2 1-1/2 WATER CLOSET PENGUIN 524 WB-1 LAUNDRY 1/2 1/2 2 1-1/2 WASHER BOX (WASHER) GUY GRAY 82026 PROIVIDE ANTI -SIPHON DEVICES ON HOSE CONNECTIONS. WB-2 LAUNDRY 1/2 1/2 - - - - - - WASHER BOX (DETERGENT) GUY GRAY 82026 PROIVIDE ANTI -SIPHON DEVICES ON HOSE CONNECTIONS. CAP UNUSED DRAIN CONNECTION ON WASHER BOX FOR DETERGENT DISPENSERS CLO-01 AS REQUIRED - - - - - - - - - - - - FLOOR CLEANOUT JAY R. SMITH 4020 CLO-02 AS REQUIRED - - - - - - - - - --- WALL CLEANOUT JAY R. SMITH 4402 FS-01 PER PLANS - - - - - - 2 1-1/2 FLOOR SINK JAY R. SMITH FD-01 PER PLANS --- --- NOTE 2 FLOOR DRAIN JAY R. SMITH 2O05 SERIES WITH ADJUSTABLE STRAINER HEADS NOTES: (1) PR❑VIDE RED/HOT AND BLUE/COLD WATER INDICAT❑RS TO ALL FIXTURES. (2) SIZE PER PLANS (3) FLUSH TRIGGER SHALL BE ON WIDE SIDE OF ROOM (4) ALL SINKS AND LAVS TO BE PR❑VIDED WITH THERM❑STATIC MIXING VALVES nnk I TI A I I I A TI nA I Tn C`rnnk Irl r)AIM nr %A/A C`I 1r-r) nnvrC" _F "LAUNDRY R HAMMER (TYP. 4 PLCS.) W.lkllm� WASHER SUPPLY AND DRAIN SCALE: NONE OVIDE STANDOFF UNTED TO WALL ' PIPE AIR GAP NDIRECT DRAIN TO FLOOR SINK SCALE: NONE EXISTING ENLARGED DEMO PLAN THIRD FLOOR SCALE: 1 /8" = 1'-0" FLAG NOTES 1. REMOVE AND REPLACE EXISTING SINK. FURNISH AND INSTALL NEW: SINK, FAUCET, POP UP DRAIN ASSEMBLY AND PLUMBING CONNECTIONS. CONNECT TO EXISTING PLUMBING LINES. 2. REMOVE AND REPLACE EXISTING WATER CLOSET. PROVIDE NEW Y4 TURN STOPS AND SUPPLIES 3. REMOVE AND REPLACE EXISTING LAVATORY. PROVIDE NEW Y4 TURN STOPS AND SUPPLIES. 4. REMOVE EXISTING WASHER BOXES BEHIND WASHING MACHINE. PROVIDE NEW WASHER BOXES AS INDICATED ON PLANS. PROVIDE SEPARATE BOXES TO SERVE WASHERS AND DETERGENT DISPENSERS. EXTEND AND CONNECT EXISTING PLUMBING LINES TO NEW WASHER BOXES AS REQUIRED. 5. EXISTING PLUMBING FIXTURES IN SERVING/KITCHEN AREA TO BE DEMO'D AND REMOVED. 6. REMOVE EXISTING REFRIGERATOR AND EXTEND EXISTING PLUMBING CONNECTIONS TO NEW REFRIGERATOR ICE MAKER CONNECTION. PROVIDE BACKFLOW PREVENTOR. 7. REMOVE EXISTING KITCHEN SINK AND EXTEND EXISTING PLUMBING CONNECTIONS TO NEW KITCHEN SINK. PROVIDE AIR -GAP CONNECTION FOR DISHWASHER. 8. REMOVE EXISTING DISHWASHER AND EXTEND EXISTING PLUMBING CONNECTIONS TO DISHWASHER. 9. REMOVE EXISTING FOOD WELL. PROVIDE NEW FOOD WELL AT LOCATION SHOWN. PROVIDE NEW FLOOR SINK FOR FOOD WELL DRAIN. EXTEND EXISTING HOT WATER CONNECTION TO NEW FOOD WELL. 10. PROVIDE NEW SINK AND CW/HW/W/V CONNECTIONS PER SCHEDULE AT LOCATION SHOWN. CONTRACTOR TO FIELD VERIFY POINTS OF CONNECTION TO EXISTING PLUMBING. 11. EXISTING GAS FIREPLACE TO BE REPLACED WITH NEW. PROVIDE NEW GAS SHUTOFF VALVE AND PRESSURE REGULATOR. CONNECT TO EXISTING GAS LINE. PROPOSED ENLARGED PLAN THIRD FLOOR SCALE: 1 /8" = 1'-0" RECEIVED Jun 07 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT z z 0 0 F- U) > �w U w 0 ILL 0 0 z �AFc��o00 O ,%0'� /O aoo00o "1��1 05 nOBISON ENGINEERING, INC 19401 40TH AVE W., SUITE 302 LYNNWOOD, WA 98036 206-364-3343 TEL CONTACT: JON ROBISON J J W Ld (n C� C� a_ a_ LLJ z z 0 ¢ w cc LLJ = 0 o U ¢ I- U w 0 DATE: 05/21 /2021 0 w C9 m � 0 Wit' m � � m Q � m Iz- 0 O 0 O O cv LJ � � Z rn -1 0- z 0 & Vl z mw w 0z 0 z w SHEET TITLE: ENLARGED PLAN - THIRD FLOOR SHEET NO. P2m2