Loading...
REVIEWED - Sewer GFC CalculationAddress: 201 Main St Land Use: Specialty Retail Calcd by: J.Lambert City of Edmonds Combined Utility Sewer Connection Charge Calculation COMMERCIAL / MIXED USE/OTHER Job Name Date 7/23/2021 *adjust sewage -flow 0.023 X 1952 = 44.896 multiplier based on Sewage Flow Building Sewage Flow use. per square ft square ft Gallons/Day (gpd) (gpd) 44.896 / 176 = 0.26 Sewage Flow Avg Single (gpd) Family Unit Equivalent Res. (gpd) Units (ERUs) 0.26 X $4,417.00 = $ 1,126.74 ERUs Connection Charge Dusted Valley as of 23 Apr 03 \\edmsvr-deptfs\Engineering\Private Development\Fees-ESUs\sewer connection fee\Sewer GFC MASTER-2012_fee _calc_sheet