Building PermitType: ADU Subtype: ADU ADDITION REMODEL I Status: ISSUED
Parcel No: 00434209402900
Subdivision: 004342
Fire Sprinklers:
Valuation: $103,376.64
Code Edition: 2018
Site Address: 633 WALNUT ST EDMONDS,WA 98020-3421
Lot: 0
Lot Area: 6,600
Occupancy Type: R3
No. Stories: 1
Zoning: RS-6
Construction Type: VB
# of Dwelling Units: 2
Scope of Work: TOLLEFSON-ADU, DECK, PATIO, PLUMBING AND MECHANICAL INCL
WA State Contractor L & I #: LEIFHC10380T
Applied: 10/4/2021
Issued:12/21/2021
Final:
Expiration Date: 12/21/2022
Issued by: WAC
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BARBARA TOLLEFSON
633 WALNUT ST, EDMONDS WA
(206)954-4145
LEE.MICHAELIS@PUGETSOUNDPLANN
98020
ING.COM
PUGET SOUND PLANNING,
5005 200TH ST SW SUITE 101-13,
lee.michaelis@pugetsoundplanning.c
CONTACT
(425)830-1046
LLC
LYNNWOOD
WA 98036
om
CONTRACTOR
LEIF HELLEREN
PO BOX 1764, EDMONDS WA
(206)533-8200
tevensl043@comcast.net
CONSTRUCTION INC
98020
633 WALNUT
ST, EDMONDS WA
OWNER
BARBARA TOLLEFSON
98020-3421
•' •
DESCRIPTION
7,BAsE
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
12/20/21
R16654
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
12/20/21
R16654
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
12/20/21
R16654
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/5/21
R15181
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$90.00
$90.00
12/20/21
R16654
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$550.00
$550.00
12/20/21
R16654
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$30.00
$30.00
12/20/21
R16654
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,124.00
$1,124.00
12/20/21
R16654
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$955.40
$955.40
10/5/21
R15181
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
12/20/21
R16654
STATE BUILDING CODE SURCHARGE
001.000.237.150
$2.00
$2.00
12/20/21
R16654
EACH ADDL DWELLING UNITS
TOTALS:
$2,927.90
$2,927.90
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, December 21, 2021 2:30:10 PM 1 of 3
Permit
City of Edmonds PERMIT NUM
EdmondsADU
98020 1 :.
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
CARBON MONOXIDE SYSTEMS
FOR
CARBON MONOXIDE SYSTEMS
NFORMATION
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Installer shall provide the manufacturer installation, operating instructions, and a whole
WHOLE HOUSE FAN
FOR
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
• • L, MERIM, m Men,• I • - • Ii • • ' - •
COMPLETED
SEQID INSPECTION TYPE 1 INSPECTOR R
Printed: Tuesday, December 21, 2021 2:30:10 PM 2 of 3
- oADU Permit
City f • • • 98020 -1362
BLD2021
www.edmondswa.gov
DATE
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-5 DRIVEWAY SLOPE
E-9 COMPOST AMEND
X-2 ENGINEERING FINAL
E-3 STRM TIGHTLINE
B-3 PLUMB GROUND WK
Printed: Tuesday, December 21, 2021 2:30:10 PM 3 of 3