REVIEWED BLD BLD2021-1155+Structural_Analysis_or_Calculations+8.18.2021_4.57.29_PM+2364312Ist printed: 5-4-2021 Rev.I Date NEW BEAM CALCULATION BeamChek v2020 licensed to: CHANG AHN Reg # 3145-69144 9909 226th PI. SW, Edmond, WA BEAM Date: 8/03/21 Selection (2) 1-3/4x 11-7/8 1.9E TJ Microllam LVL Lu = 0.0 Ft Conditions NDS 2015 Min Bearing Area R1= 4.2 in R2= 4.2 in (1.5) DL Defl= 0.11 in Data Attributes Actual Critical Status Ratio Values Adjustments Loads Beam Span 12.0 ft Reaction 1 LL 2340 # Reaction 2 LL 2340 # Beam Wt per ft 10.68 # Reaction 1 TL 3184 # Reaction 2 TL 3184 # Bm Wt Included 128 # Maximum V 3184 # Max Moment 9552'# Max V (Reduced) 2659 # TL Max Defl L / 240 TL Actual Defl L / 477 LL Max Defl L / 360 LL Actual Defl L / 736 Section (in3) Shear (in 2) TL Defl (in) LL Defl 82.26 41.56 0.30 0.20 44.02 13.99 0.60 0.40 OK OK OK OK 54% 34% 50% 49% Fb (psi) Fv (psi) E (psi x mil) Fc L (psi) Reference Values 2600 285 1.9 750 Adjusted Values 2604 285 1.9 750 CF Size Factor 1.001 Cd Duration 1.00 1.00 Cr Repetitive 1.00 Ch Shear Stress N/A Cm Wet Use 1.00 1.00 1.00 1.00 Cl Stability 1.0000 Rb = 0.00 Le = 0.00 Ft Uniform LL: 390 Uniform TL: 520 = A Uniform Load A 0 R1 =3184 R2=3184 SPAN =12FT Uniform and partial uniform loads are Ibs per lineal ft. ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES APPROVED PLANS MUST BE ON JOB SITE GENERAL NOTES: I. Chang Ahn, PE, is the Project Engineer of The Record. Any structural engineering issues shad be directed to This Engineer. 2. Building Codes: All construction work performed for this project shall comply with the 2018 IRC. 3. CONTRACTOR'S APPROVAL: a. Contractor shall, prior to starting construction, coordinate all the construction documents of the latest revision, verify all the dimensions, check for conflicting requirements and report to This Engineer any discrepancies and field conditions which are different from those indicated on drawings. b. Areas requiring special attention: variation caused by different architectural elevations, e.g. location changes of holdowns and post anchors due to different window sizes, location and porch layout, the existence or nonexistence of interior bearing wall and footings, planter shelves, box columns, brick ledge, isolated column pads in 3-Gar Garage option, etc. 4. STRUCTURAL ONLY: a. Structural drawings are intended to cover the structural framing and the foundation elements only. Non-structural elements including decorative architectural elements, stair framing, guard rails, concrete pads, driveway, etc. may not be covered in the structural drawings. Contractors are advised to review all other plans and construction documents for non-structural items which may be embedded in, attached to or otherwise interfering the structural elements. b. MARBLE/TILE: Where marble/tiles are installed, it is the contractor's responsibility to consult with an expert for special framing advice to avoid cracking which may include ups izIng the floor joists, reducing the joist span $ spacing, increase the thickness of floor sheathing, etc. c. Lee Engineers is not responsible for the ventilation, including under -floor, joist and attic, nor concrete flat work including concrete driveway, walkway, door pads and other similar items. Images and/or dimensions the flat work are intended to be conceptual. Contractors shall follow given for the Architectural Plans or Owner's specifications for final location, geometry and dimensions. 5. NOT TO SCALE: Drawings are not to be scaled. Dimensions not specified, when required by field condition, shall be determined by Engineer. (b. TYPICAL DETAILS: Typical and similar details shall apply where no specific details are given. Material notes and details on drawings shall take precedence over the structural notes contained herein. 7. REVISIONS 4 MODIFICATIONS: a. All drawings and subsequent revisions, if any, shall be approved prior to starting construction. No structural members shall be substituted, relocated or omitted, without prior written approval. b. Field Modifications: When the installation of mechanical, plumbing, electrical, landscaping and other similar elements requires changes or modifications including boring, notching, or cutting made to the structural elements, contractor shall submit such changes or modification to Lee Engineers for approval prior to installation. c. NOTCHING of Beams, Joists, and Rafters: Notching from the top edge or the bottom edge is never permitted without approval. Boring is allowed only if located within the middle 1/5 span and the hole size shall be limited to 1/6 of member depth. 8. ADDITIONAL EQUIPMENT: Unless specified on the structural framing plans, mechanical and plumbing equipments, e.g. spa tub, FAU, etc., to be placed over or suspended off the structure members shall be submitted to This Engineer for approval. cl. CONSTRUCTION SAFETY: Contractor and the subcontractors are responsible for the order and means of construction and all temporary bracing 4 erection during construction. 10. 5heetrock Stacking Guidelines: When 5heetrock is stacked on a wood -framed floor during construction, the following guidelines shall be followed: a. The sheetrock shall be laid with the LONG DIRECTION PERPENDICULAR to the joists below. b. 5heetrock must not be stacked more than 2 feet high. c. If sleepers are used beneath a stack of sheetrock, they shall be placed at no more than 2'-O" o.c. d. The floor joists directly beneath a stack of sheetrock shall be shored from below with 4x4 temporary beams placed PERPENDICULAR to the joists. These beams shall then be supported by min 2x4 posts over 4x4x24" sleepers at a maximum spacing of 3'-0" o.c. This shoring shall be done prior to stacking the sheetrock and shall be repeated on every floor directly below the stacked sheetrock until a concrete slab or foundation system is reached. e. If contractor prefers not to provide shoring for the stacked sheetrock as specified above, the maximum height of sheetrock allowed to be placed on the floor is a inches. FOUNDATION NOTES: I. SOILS REPORT: Boils Report is not available for this project. 2. GRADING $ DRAINAGE: a. Site grading, subgrode preparation, cutting slopes, excavation and placement of engineered fill material shall be performed in accordance with the Soils Report. b. For slab -on -Grade construction the soils Report shall be referenced regarding compaction, soaking, moisture barrier, sub -base, gravel, sand, etc. c. Site drainage requirements including final pad grades, roof drainage downspouts shall be referred to Soils Report and Architectural Plans. d. FINISH GRADING: Finish grading around the exterior of the foundation shall be sloped to drain away from the building and be a minimum of 8" below the sill plate. Contractor must follow the soils report for grading details. 3. CONCRETE: a. Concrete for foundations shall have a minimum compressive strength of b. Owner/Builder shall consult with a geotechnical engineer to determine if the underlying soil contains sulfate or if the building site is exposed to salt Hater. If sulfate and/or salt water exposure exist, A1 515-05 shall be followed in concrete mix design. c. Cold joints may be used only where shown. Jointing surface shall be clean, free of foreign material and intentionally roughened. 4. REBAR: a. Unless specified otherwise, reinforcing steel shall be deformed bars of billet or axle steel per A5TM A615 Oracle 40. For #5 and bigger Oracle 60 shall be used. b. Reinforcing bars to be welded shall be A57M A706. c. INSTALLATION: Rebor, dowels and other embedded elements shall be secured in place before pouring concrete. Reinforcement shall be clean and free of extraneous material. cl. CLEARANCE: * 3" clearance shall be provided where concrete is cast against earth, * 2" clearance for concrete exposed to earth or weather but deposited against forms, and * 3/4" clearance for slabs and walls where concrete is not exposed to earth or weather. e. LAPPING: Lap all reinforcing splices a minimum 48 bar diameters but in no cases less than 24". RECEIVED Aug 20 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT (E) CEILING JST W/ "HU" HGR (E) FLR. . (E) GONG. ROOF FRA NO FLAN 1/4" = I' - O" 2x KICKERS "A54" BM. PER PLAN "PC" AT EACH END (E) WALL TO BE REMOVED (N) SEAM IN ATTIO MWO"rw IF NEEDED sr TO T.O. TM E i. PER PLAN AY LEGEND I DETAIL NUMBER 5D SHEET NUMBER REVISION NUMBER INDICATES (H)PAHD HOLDOM AND INSTALLATION FACE. HEADER OR BEAM WALL -- �HA /N6ER BEAM OR JOIST INDICATES NTT) HD HOLDOWV HORIZ. STRAP ON AND INSTALLATION FACE. TOP PLATE, JST OR BM ■�� VERT. STRAP FOOTING, DEEPENED ` P05T ABOVE OR BELOW ®ENLARGED FOOTING, SM PLAN FOR DIMENSION. FRAMING RUN 2X AT 6" O.G.-51ZE AND SPACING ❑CONCRETE PAD OR STOOP, SEE PLAN FOR DIMENSION. FRAMING SPAN (L=&'-O") SHEAR WALL LENGTH INDICATES POST ABOVE PI SHEAR WALL TYPE (SEE SLV.S) - - - EXTENT OF SHEAR WALL 0 INDICATES P05T BELOW 1111 INDICATES POST ABOVE AND BELOW 8" 8" TYP TYP LIFTED ONE -BY -ONE 6 .... MAY BE SKIPPED COMBINED W/ 2" DIA. M.B. FOR 2-PLY, 3-I/2" WIDE IN PLACE W/ 5TD. NUT $ WASHER OR DEPTH LE55 THAN 14" wood -framed residential ahnstructural engiaeerin9 services by an ex -framer (206) 460 - 4730 changahnpe@gmail. com 2205 152nd Ave NE Redmond, WA 98052 VVAS <V 33602 Ewa O��SSEONA ti�Gl Exp.1-4-2025 ' FOR PERMIT ONLY TIES DOCUMENT HAS BEEN PREPARED FOR PERMIT APPLICATION AND IS SUB- JECT TO REVIEW AND MODIFICATIONS BY GOVERNMENTAL AGENCIES. • ROOF FRAMING PLAN • STRUCTURAL DETAILS • STRUCTURAL NOTES • BEAM CALCULATION Scale: A5 SHOWN Drawn: GJA Print size: 24" 56" S1 of 1 sheet 2 (N) I NT. FTO. a MULTIFLE=MIOROLLAM OONNEOTION