Loading...
REVIEWED BLD2021-1188+Energy_Calculations+8.25.2021_3.37.58_PM+2376507refox https://waenergycodes.com/print_project_Summary_form.php?k=... REVIEWED I ENVELOPE COMPLIANCE SUMMARY I CITY OF EDMONDS I 2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all R1 Administered by: @2021 NEEA, All rights reserved Project & Applicant Information Project Title Pacific Park Mail Room - 2018 WSEC For Building Department Use: Date: Aug 25, 2021 RECEIVED Aug 25 2021 DS gLD2021-1188 °'LOPMTY OF ET ENVI DEVELOPMENT ICES DEPARTMENT Project Address 23231 Highway 99 Edmonds, WA98026 Applicant Name David Sova p licant Phone ^rip 206-617-9010 Applicant Email david@dsdaa.com For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type Office, Other Building Cond. Floor Area 846 Project Cond. Floor 216 Area Project Scope Alteration Space Conditioning Fully Floors Above Grade 1 Categories Conditioned Compliance Method Compliance Method 1 - General Envelope Project Description adding a new door in an existing exterior wall Envelope Scope Space Conditioning Compliance WWR/SRR per UACalculation Adjustment Fenestration Compliance Compliance Category Method Category Alternates Verification Scope and Method Alteration Fully Conditioned Prescriptive 8.06%/ 0°/D No Calculation Adjustments 1 No alternates selected COMPLIES allowed Air Barrier Testing Air barrier testing not included Air Barrier Comments No change in occupancy type and no change Heating system Project Title Pacific Park Mail Room - 2018 WSEC Date Aug 25, 2021 Scope & Space Conditioning ALTERATION - FULLY CONDITIONED Compliance Verification COMPLIES Window -to -wall Ratio 1 8.06% Skylight -to -roof -ratio IVertical Fenestration Alternate I No alternates selected Fenestration & Opaque Door Assemblies Insulation R-Values Opaque Doors Location in Documents Assembly ID Assembly Location Door Insulation U-Factor Rough Opening (SF) Swinging A1.1 Floor Plan Codel SF-20 Exterior R-4.17 U-0.24 20 What percentage of this opaque door is glazing?: 50% or less U-Factor Source: Tested U-Factor Source Description: Manufacture Is this assembly exterior or interior?: Exterior Is this a public entrance door?: Yes Is assembly new, upgraded or unaltered existing?: New assembly of 1 8/25/2021, 3:22 PM