Loading...
REVIEWED BLD2021-1491+Structural_Analysis_or_Calculations+10.8.2021_2.09.16_PM+24531244 ENGINEERING RECEIVED Nov 02 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 250 4th Ave S Ste 200 Edmonds, WA 98020 Phone: (425) 778-8500 Fax: (425) 778-5536 civil & structural engineering & planning BLD2021-1491 REVIEWED BY CITY OF EDMONDS STRUCTURAL CALCULATIONS Magnolia Lane Condo Dry rot Repair 8507 Bowdoin Way, Apt #3 Edmonds, WA 98026 CG Project No.: 21321.10 Project Location 8507 Bowdoin Way, Apt #3 Edmonds, WA 98026 Project Description Water damage has affected the framing for an existing condominium unit. The building is two stories and wood framed. We understand that the water damage has affected only the crawlspace for unit 3. We visited the site to as -built the damage to the framing. We will provide repair recommendations based on our observations. Scope of Work Provide structural calculations & drawings in accordance with the 2018 International Building Code and in accordance with the geotechnical report. Basis of Deck Design Roof Dead 15 psf Roof Live (Snow) 25 psf Floor Dead 15 psf Floor Live 40 psf Description By Date Project Summary BTJ 09/28/21 n Checked Date ENGINEERING Scale Sheet No. 250 4th Ave. South Project Job No. Suite 200 Magnolia Lane Condo Edmonds, WA98020 21321.10 1 REPLACE RIM UP REPLACE UNIT 3 BE UNIT 4 BEAN ROTTED J( CUT OUT AND SISTER f FOUNDATION AND CRAWLSPACE PLAN =1 0 0 Description By Q' -°� Date Checked v Date 1 ENGINEERING Scale Sheet No. 250 4th Ave. South Suite 200 project Job No. Edmonds, WA 98020 /vO ow �hrlG CO/wo 425.778.8500 a 3� 1. 10 www.cgengineering.com > a FORTE"M3 MEMBER REPORT Main Floor, BM1 1 piece(s) 3 1/2" x 5 1/2" 1.3E TimberStrand® LSL PASSED 0 Overall Length: - - 4' All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. 0 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 1273 @ 2" 5206 (3.50") Passed (24%) 1.0 D + 1.0 L (All Spans) Shear (Ibs) 857 @ 9" 5454 Passed (16%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 1254 @ 2' 3 1/2" 2686 Passed (47%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.055 @ 2' 3 1/2" 0.142 Passed (L/930) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.076 @ 2' 3 1/2" 0.213 Passed (L/669) 1.0 D + 1.0 L (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Floor Live Total 1 - Stud wall - SPF 3.50" 3.50" 1.50" 357 917 1274 Blocking 2 - Stud wall - SPF 3.50" 3.50" 1 1.50" 357 917 1274 Blocking • Blocking Panels are assumed to carry no loads applied directly above them and the tull load is applied to the member being designed. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 4' 7" o/c Bottom Edge (Lu) 4' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Location (Side) Tributary Width Dead (0.90) Floor Live (1.00) Comments 0 - Self Weight (PLF) 0 to 4' 7" N/A 5.6 1 - Uniform (PLF) 0 to 4' 7" (Front) N/A 150.0 400.0 Default Load System : Floor Member Type : Drop Beam Building Use : Residential Building Code : IBC 2015 Design Methodology : ASD Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Benjamin James CG Engineering (425) 778-8500 benj@cgengineering.com 9/21/2021 6:40:53 PM UTC ForteWEB 0.2, Engine: V8.2.0.17, Data: V8.1.0.16 Weyerhaeuser File Name: Magnoli#Lane Condo Paget/3 a" O R T CM MEMBER REPORT PASSED Main Floor, FJ1 1 piece(s) 1 3/4" x 14" 2.0E Microllam@ LVL @ 16" OC . = -all Length: 20' a 1 j2' 20G 0 0 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 723 @ 3 1/2" 1969 (1.50") Passed (37%) 1.0 D + 1.0 L (All Spans) Shear (Ibs) 637 @ 1' 5 1/2" 4655 Passed (14%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 3561 @ 10' 1 3/4" 12614 Passed (28%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.220 @ 10' 1 3/4" 0.657 Passed (L/999+) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.302 @ 10' 1 3/4" 1 0.985 1 Passed (L/783) 1.0 D + 1.0 L (All Spans) TJ-Pro'"" Rating 51 1 35 1 Passed • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • A 4% increase in the moment capacity has been added to account for repetitive member usage. • A structural analysis of the deck has not been performed. • Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser EdgeTM Panel (24" Span Rating) that is glued and nailed down. • Additional considerations for the TJ-ProTM Rating include: None. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Floor Live Total 1 - Hanger on 14" HF beam 3.50" Hanger' 1.50" 203 541 744 See note' 2 - Hanger on 14" HF beam 3.50" Hanger' 1 1.50" 203 541 744 See note' • At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger • 1 See Connector grid below for additional information and/or requirements. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 15' 5" o/c Bottom Edge (Lu) 19' 9" o/c -Maximum allowable bracing intervals based on applied load. System : Floor Member Type : Joist Building Use : Residential Building Code : IBC 2015 Design Methodology : ASD Connector: Simpson Strong -Tie Support Model Seat Length Top Fasteners Face Fasteners Member Fasteners Accessories 1- Top Mount Hanger ITS1.81/14 2.00" 4-10d 4-10d 4-10dx1.5 2- Top Mount Hanger ITS1.81/14 2.00" 4-10d 4-10d 4-10dx1.5 • Refer to manufacturer notes and instructions for proper installation and use of all connectors. Vertical Load Location (Side) Spacing Dead (0.90) Floor Live (1.00) Comments 1 - Uniform (PSF) 0 to 20' 3 1/2" 16" 15.0 40.0 Default Load Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Benjamin James CG Engineering (425) 778-8500 benj@cgengineering.com 9/29/2021 4:14:52 PM UTC ForteWEB 0.2, Engine: V8.2.0.17, Data: V8.1.0.16 Weyerhaeuser File Name: Magnol§Lane Condo Page 1 / 1 AA_ V` c»� Offo VM4-x - �oO �O m s�o� Description By —� Date Id I Checked Date ENGINEERING Scale Sheet No. 250 4th Ave. South Suite 200 Edmonds, WA 98020 project MAGNoCLA LW6 COAVO Job No. 425.778.8500 www.cgengineering.com