Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Energy Code
5/26/2021 hftps:llwaenergycodes.com/print_project_summary_form.php?k=aWQ9MzE5MyZmdmk9MTcmY3RpPTQ2&print=1 MECHANICAL COMPLIAN M 2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all Rl Administered by: ©2021 NEEA, All rights reserved Project & Applicant Information Project Title 21-5027 Driftwood Players - 2018 WSEC For Building Department Use: Date: May 26, 2021 Project Address 950 Main St. Edmonds, WA 98020 Applicant Name Taylor Blake Applicant Phone 425-252-3114 Applicant Email tylor@essmwa.com For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type Entmt/Assembly, Performing Arts Building Cond. Floor Area 5,339 General Project Types Alteration New Building or Addition Mechanical Scope Alteration Mechanical ScopeT Single Zone Systems & Equipment Project Cond. Floor Area 5,339 Floors Above Grade 1 Compliance Method Not Selected Mechanical Project Description Remove (3) abandoned basement furnaces, replaced entryway gas furnace, build spider box & replace/add ducts, add (3) air scrubbers. Project Economizer DOAS Ventilation Higher Equipment Equipment Efficiency Mechanical Compliance YP Type Mechanical Scope Exception(s) � Applied. Provided? Efficiency Option O Applied? P � PP Compliance Verification Scope and Method Single Zone Systems & Alteration Equipment No No NA COMPLIES Additional Efficiency Credits Included (AEC) Does building include occupancy classifications requiring No Does project include DOAS equipment? No DOAS? Based on project scope do TSPR requirements apply? No Do all systems comply with Appendix D standard reference design or qualify for an exception to No TSPR? Scope & Space Conditioning ALTERATION - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verification COMPLIES Single Zone Air Systems Category - Furnace, warm air Air Systems Summary Information System/Equip ID Quantity Supply Airflow Ventilation Standard Ventilation CFM Ventilation Paired with DOAS Ventilation energy recovery Energy Recovery of Items Control (Total if Multiple Items) Air Source Efficiency (%) 1 I I Staged volume I OSHA or WAC Integral I I Not provided, not required Air Systems & Equipment - Heating System Heating System/Equip Type I Specific Type I Heating Capacity I HC I Proposed Heating Efficiency I HE Efficiency Compliance /Equip ID Units Units 1 Verification 11 Furnace I Warm air, gas -fired (Et) 1 100,000 1 Btu/h 1 100,000.0 Et COMPLIES Air Systems & Equipment Details System/Equip ID Area(s) Served Location In Project Documents - Plan/Detail # 1 Building All WSEC Equip Efficiency Reference Table - Heating: Table C403.3.2(4) Warm Air Furnaces https://waenergycodes.com/print_Project_summary_form.php?k=aWQ9MzE5MyZmdmk9MTcmY3RpPTQ2&print=1 1/1