Loading...
ENG2021-0442 ROW PERMIT APPLICATIONEN G2021-0442 of EpM04O� RIGHT OF WAY CONSTRUCTION RECEIVED PERMIT APPLICATION Nov 16 2021 CITY OF EDMONDS Complete and submit this Application in accordance with the Submittal DEVELOPMENT SERVICES /'Vc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name Site Address or if no site address use Property Address at NW corner of project area: 7627 195TH St SW Associated Permits: BLD PLN ENG X Owner and Entity Holding Franchise (if applicable) Name of Company PSE/Infrasource Franchise Ordinance No: Point of Contact Susan Sid ick Title SR Permit Specialist Address 1660 Park lane city Burlington State WA Zip 98233 Phone 425-457-6353 Email susan.sidickapse.com Contractor and Authorized Agent of Owner Name of Company (see note below) Contractor Contacts During Construction Primary Name PSE/Infrasource Susan Sidick Agent Name PSE/Infrasource Title SR Permit Specialist Title SR Permit Specialist Mobile 425-457-6353 Address 1660 Park lane Email susan.sidick@pse.com City Burlington State WA Zip 98233 Secondary Name Phone 425-457-6353 Title SR Permit Specialist Email susan.sidick@pse.com Mobile City of Edmonds Business License No: Email State License No: INFRASL871 C2 [N Contractor verifies it is currently bonded d( Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision d6ingle family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) install gas service at approx o o c o c of 16th (1) 3x5 paving cut (1) 3x4 pavin g cut & (1) 3x7 paving and soft surface cut anticipated. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF 1-2 da s SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the x project is proposed: 6a. Does your project involve wires/cables/lines? If yes: x How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Susan Sidick DATE: 10/11/2021 APPLICANT PRINTED NAME: busan Sidick APPLICANT TITLE: Sr Permit Specialist NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 Job #: Date: Jurisdiction: ROW Permit: Est. Start Date: Est. Duration: 106379285 7/9/21 City of Edmonds Yes 9/6/21 1 Day (8 Hours) Puget Sound Energy Gas Pre -Inspect Form Address: City / Zip: Customer: PM / Inspector: 7627 195TH ST SW RECEIVED Nov 16 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Edmonds, 98206 MICHAEL LASSEN 206-999-3691 Loaan Ghirinahelli 1 (804) 401-6809 Job Description ROW Scope of Work Project Scope: From 1-1/4" MPE main (109007374-2000) on 195th St SW - install approx 61' (39' Stub with 2600 EFV & 22' extension) New Construction: No of 1-1/8" PE scat svc ext and set an A425 meter at inches, OL. ROW 50'. Construction Method All Scat / Trenchless PLAT Map: 161.069 N '7705 7619 5/8" MPE 7627 2000 a425 5/8" M P E 2008-E W a eo — — Stormwater — — —7' — — — — — — — — — — — — Water Main— — — —� — — — — — — — — — — — — — — — — — — —— — — — — — — — — — — — — — — _ — — _ — — — �. Sewer — — — — — 1 1 - 1, * SW ------- JULq 3 = c to 3' 1 1 /4" NVEl !P U11 20'S —` — ---------- — — —r ——— — — — — —— -1 a`f007�4 2000 � I _Stormwater 00 +7708 � I I � Work Location Size of Cut Surface Type 14' South of CL 195th St SW & 319' West of CL 76th Ave W 3 x 5 Soft Surface 2' North of CL 195th St SW & 319' West of CL 76th Ave W 3 x 4 Asphalt 5' North of CL 195th St SW & 319' West of CL 76th Ave W 3 x 7 Asphalt/ soft of CL & of CL Service Information Street Information Job Type Diameter: 1-1/8" PE Flaggers #: Arterial: No New Residential Svc EFV: 1-1/8" - 2600 - 9999144 Police #: TCP: Yes Tie -In Fitting Meter: A425 Speed Limit: No Parks #: MDPE - 1 - 1/4" IPS - (DIA) 1"CTS 9999546 Meter Loc: 03 - OL Trolley Lines: Mtr Hoods #: Del Press: 6" W.C. Traffic Signal: Bus Stop: SNO YRD - Snohomish .' :. Bollards: 2.5" # 4" # ADA Ramps #: Route #'s: TEMPORARY TRAFFIC CONTROL PLAN 41- 0 od�� o A 39 --A -T- v 12 7627 195TH ST SW _a co CO W20-7A Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 14' SCL of 195th ST SW & 319' WCL of 76th Ave W. LEGEND ® 28" TRAFFIC CONE ® WORK PIT TRAFFIC FLOW FLAGGER WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY Row PLACE SIGNS BOTH SIDES OF WORK AREA SIGN SPACING MPH "XI. 60/65 1000, 45/55 500' 35/40 350' 30 200' 25 1 100' I I I I I I C OV3HV I � o Ni Iom , 0VO6 ' I o' I CV I t-ow 17122 VL-OZM I w Z ¢ J�Ji , W 2 ZO � Q I � I I I I I , 100, J I 1 100' I I a --------------------------- 195TH ST SW I I I I I I I RESIDENT(S) WILL BE INFORMED ' OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE CHANNELIZATION Sa DEVICE SPACING �Z MPH 55/70 TAPER 40 TA E T /45 30 60 L55 30 20 40 NdwlaVd3a 3S 1N31Nd0-l3A30 IOW(] -El d0 )Z 9l o `I A , 0 I- I I ROAD WORK o N AHEAD 196TH ST SW Designer: Puget Sound Energy PUGET Traffic Control Supervisor: SOUND Jason Bisenius Gregory Hawood Card No. 012238 ENERGY 425-424-7316 Card Exp.09/ od@p3 gregory. harwood@pse.com jason.bisenius@pse.com 425)424-6425 Project Address: 7627 195TH ST SW, EDMONDS, WA 98206. REV 08/09/2021 0 Job # 106379285 1 OF 2 TEMPORARY TRAFFIC CONTROL PLAN o �pOp wo�V4 g o 12� 12 3 195TH ST SW a Z w ■ a �3a W20-7A Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 2' and 5' NCL of 195th ST SW & 319' WCL of 76th Ave W. LEGEND ® 28" TRAFFIC CONE ® WORK PIT TRAFFIC FLOW FLAGGER WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY Row RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 11 7627 PLACE SIGNS BOTH SIDES OF WORK AREA SIGN SPACING MPH "XI. 60/65 1000, 45/55 500' 35/40 350' 30 200' 25 100, . • • VL-2M ■ 100' I I I I 4V3HV o A1Jom OV08 I o' CDI CV ' I v-ow LU � p I I wo= Z � Q I o , I I I 100, I I i -- - - - � - - 195TH ST SW CREW SHALL POTHOLE FOR WATER MAIN DEPTH L I PRIOR TO PROJECT START CHANNELIZATION DEVICE SPACING S3 MPH TAPER TANGENT 55/70 40 8 35/45 30 6 25/30 20 40 1Ndw12i Ina3S 1N wdo� �o Designer: 30NOWO3 o PUGET rOZ 9 SOUND Jason Bisenius ^ ENERGY 425-424-7316 WAN N jason.bisenius@pse.com Project Address: 7627 195TH ST SW, EDMONDS, WA 98206. Q ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 17122 96 Z[ 91, AINO 44111-6�4 196TH ST SW Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory. harwood@pse.com REV 08/09/2021 0 Job # 106379285 20F2 Z 5/8" PE 1975 7803 7731 7723 7707 7629 84'14 7619 19406 5/8"MPE 2001 V 5/8" MPE 2004 1968STW-U 7625 2/00 MPE 2006-E 7711 3 194TH S W 45'W It 3 362'W + 2"STW IP 14'S s 68C180 ; 69's 2" MPE IP 14'S 107021982-2004 5/8" MPE N 2004 cs 1/2"STW-U 971 19426 0 �72's i967 W-U 1967 7628 MPE 7608 p 7730 199 999 L� 7802 7706 7604 7612 TTp'N i N 7627 3/4"STW-U 1963 7705 7619 7615 7603 7729 7721 2000MPEI ° 03-7805 200 MPE 2000 5/8" MPE 2008 E 5/8" PE 1994 �- - 19 f TS 3 1"STW IP 20'S 7 34'w1. - 3 74C069 _ ...._ _3 __ .... _ PE 5/8" 18"'99 v 7708 7732 1/2"STWU 1974 15/8"PEI 1993 5/8" MPE 2000 7614 5/8" PE 1978 7724 7628 aec I I I 1996MPEI I / 1996MPE � � V 18'S 5/8" MPEI 2005 19407 19409 ._..—..—..—..—.._. 5/8" PEI 1994 RECEIVED Nov 16 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 19425 19505 5/8" 1996 PE 7707 3 a 0" 7531 7731 5/8"MPE 6 1996 $ 7717 Li 0, 0 3 9185 PE 7711 n 3N �6TH ST SW 33 DEACT 4" STW 22'S 9518125 N 30'N o V n n 22 N 196T DEACT 2"ST 18'S 75CO2 No electric grid information available Scale 1:1012 S 160068, Q 161069 08-04-2021 Lat\Long=47.8222,-122.3369 OD 0 PUGET SOUND ENERGY ,M x�vr �`M•' The information on the attachetl maps is subject to change without notice. Puget Sound Energy makes no warranty. expressed or implied concerning the suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any o}her person or entity. unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811)."