Building Permit 2020•M MERCIAL BLDG PermitCity
PERMIT1[7 NUM
• • • •
www.edmondswa.gov
Type: COMMERCIAL BLDG
Owner/ Business: MANFE TORREZ
Status: ISSUED
Subtype: NEW TENANT IMPROVEMENT
Parcel No: 00576700002801 Site Address: 23423 HIGHWAY 99 S EDMONDS,WA 98026
Applied: 6/2/2020
Subdivision: 005767, 9600-122
Lot: 0
Issued: 12/16/2020
Fire Sprinklers: Lot
Area: Zoning: CG
Final:
Valuation: $200,000.00 Occupancy Type: B Construction Type: VB
Expiration Date: 12/11/2021
Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 0
Issued by: NED
Scope of Work: 23423 DELIVERY RESTAURANT: CHANGE OF USE/ TI
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MANFE TORREZ
304 145TH PL NE, BELLEVUE WA
(425)923-7043
MARY.TORREZ@PHILIPS.COM
98034
CONTACT
CATCH DESIGN STUDIO
1405 BOYLSTON AVE, SEATTLE
(206)322-4323
nos@catchstudio.com
WA 98122
CONTRACTOR
CONTRACTOR UNKNOWN
PHAN JOHNNY & CHE
9402 VALHALLA WAY, BOTHELL
OWNER
KRISTINA
WA 98011
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
2020 TRANSPORTATION IMPACT
112.502.345.86.000.00
$2,115.51
$2,115.51
12/16/20
R9102
FEE
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
12/16/20
R9102
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
12/16/20
R9102
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$330.00
$330.00
12/16/20
R9102
PARK IMPACT - APPEAL FEE
001.000.345.83.000.00
$200.00
$200.00
12/16/20
R9102
PARK IMPACT - DEFERRAL FEE
001.000.322.10.000.00
$50.00
$50.00
12/16/20
R9102
PARK IMPACT FEE - COM ADMIN
001.000.322.10.000.00
$100.00
$100.00
12/16/20
R9102
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$2,020.00
$2,020.00
12/16/20
R9102
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$1,717.00
$1,717.00
6/15/20
R5788
TOTALS: $6,597.51 $6,597.51
7
CONDITION TYPE
STATUS NOTES
Printed: Wednesday, December 16, 2020 11:27:01 AM 1 of 3
• Permit
PERMIT NUM
City of Edmonds
JIL-. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
FIRE EXTINGUISHERS
FOR
Provide 2A lOBC portable fire extinguishers at locations noted on approved plans.
NFORMATION
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-0215.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
Premise Isolation Required with Reduced Pressure Backflow Assembly in hot box at
PREMISE ISOLATION WITH HOT
FOR
meter. Verify meter or backflow assembly type and specifications with City of Edmonds
BOX
INFORMATION
Water Department.
INSPECTIONS• - •nline
at: https://Inspection.MyBuildingPermit.co
COMPLETED
SEQID INSPECTION TYPE INSPECTOR
RESULT NOTES
DATE
G-0 PRE-T ROUGH IN
B-4 DRYWALL FASTENING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-1 FIRE FINAL
A-1 BUILDING PRECON
Printed: Wednesday, December 16, 2020 11:27:01 AM 2 of 3
COMMERCIAL BLDG Permit
PERMIT NUMBER
City of Edmonds
�j 121 5th Ave N, Edmonds WA 98020 BLD2020-0569
www.edmondswa.gov 425.771.0220
& g /
' .:
--
E-4 RPBA AND HOTBOX
...•
-
X-2 ENGINEERING FINAL
--
-
:
--
Printed: Wednesday, December 16, 2020 11:27:01 AM 3 of 3