Loading...
Building Permit 2020•M MERCIAL BLDG PermitCity PERMIT1[7 NUM • • • • www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: MANFE TORREZ Status: ISSUED Subtype: NEW TENANT IMPROVEMENT Parcel No: 00576700002801 Site Address: 23423 HIGHWAY 99 S EDMONDS,WA 98026 Applied: 6/2/2020 Subdivision: 005767, 9600-122 Lot: 0 Issued: 12/16/2020 Fire Sprinklers: Lot Area: Zoning: CG Final: Valuation: $200,000.00 Occupancy Type: B Construction Type: VB Expiration Date: 12/11/2021 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 0 Issued by: NED Scope of Work: 23423 DELIVERY RESTAURANT: CHANGE OF USE/ TI WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MANFE TORREZ 304 145TH PL NE, BELLEVUE WA (425)923-7043 MARY.TORREZ@PHILIPS.COM 98034 CONTACT CATCH DESIGN STUDIO 1405 BOYLSTON AVE, SEATTLE (206)322-4323 nos@catchstudio.com WA 98122 CONTRACTOR CONTRACTOR UNKNOWN PHAN JOHNNY & CHE 9402 VALHALLA WAY, BOTHELL OWNER KRISTINA WA 98011 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 2020 TRANSPORTATION IMPACT 112.502.345.86.000.00 $2,115.51 $2,115.51 12/16/20 R9102 FEE CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/16/20 R9102 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 12/16/20 R9102 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $330.00 $330.00 12/16/20 R9102 PARK IMPACT - APPEAL FEE 001.000.345.83.000.00 $200.00 $200.00 12/16/20 R9102 PARK IMPACT - DEFERRAL FEE 001.000.322.10.000.00 $50.00 $50.00 12/16/20 R9102 PARK IMPACT FEE - COM ADMIN 001.000.322.10.000.00 $100.00 $100.00 12/16/20 R9102 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $2,020.00 $2,020.00 12/16/20 R9102 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $1,717.00 $1,717.00 6/15/20 R5788 TOTALS: $6,597.51 $6,597.51 7 CONDITION TYPE STATUS NOTES Printed: Wednesday, December 16, 2020 11:27:01 AM 1 of 3 • Permit PERMIT NUM City of Edmonds JIL-. •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FIRE EXTINGUISHERS FOR Provide 2A lOBC portable fire extinguishers at locations noted on approved plans. NFORMATION FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-0215. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. Premise Isolation Required with Reduced Pressure Backflow Assembly in hot box at PREMISE ISOLATION WITH HOT FOR meter. Verify meter or backflow assembly type and specifications with City of Edmonds BOX INFORMATION Water Department. INSPECTIONS• - •nline at: https://Inspection.MyBuildingPermit.co COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE G-0 PRE-T ROUGH IN B-4 DRYWALL FASTENING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" X-1 FIRE FINAL A-1 BUILDING PRECON Printed: Wednesday, December 16, 2020 11:27:01 AM 2 of 3 COMMERCIAL BLDG Permit PERMIT NUMBER City of Edmonds �j 121 5th Ave N, Edmonds WA 98020 BLD2020-0569 www.edmondswa.gov 425.771.0220 & g / ' .: -- E-4 RPBA AND HOTBOX ...• - X-2 ENGINEERING FINAL -- - : -- Printed: Wednesday, December 16, 2020 11:27:01 AM 3 of 3