ENG2021-0448 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
www.cityofedmonds.gov
Description: ZIPLY-RELOCATE FDH AS PART OF CIVIC CENTER PLAYFIELD PROJECT
ISSUED: 01/06/2022
Address: 310 6TH AVE N EDMONDS WA 98020-3089
EXPIRES: 07/06/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434210000000
NAME TYPE NAME ADDRESS PHONE
APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
CONTRACTOR PACIFIC CABLE CONSTRUCTION, INC. , EVERETT WA 98201-1255 (425)348-7735
OWNER CITY OF EDMONDS 700 MAIN ST, EDMONDS WA 98020 (425)771-0230
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00
•
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
01 /06/2022
RELEASED BY
DATE
Printed: Thursday, January 06, 2022 2:40:46 PM 1 of 2
-KRWOF WAY EUC PERMIT
ER
City of • • •
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
Printed: Thursday, January 06, 2022 2:40:46 PM 2 of 2
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband arovider Zialy Fiber to
Telecommunications and broadband provider Ziyly Fiber to relocate of FDH.9023 at :Il0 6th Ave N, Edmonds, WA 98020 from
10/18/2021 - 12/31/2021.
the edmonds civic center playfeild property development with TOW request to move FDH due to
pedestrian traffic at new staircase. New FDH location should be 7' west towards road and 3' south
centered on future sidewalk joints. This will require a 10' split duct and new (2) 4" duct for new FDH
placement and leave 2 stacked Quazrte 2x3HH at original location to protect original splice cases.
This will require a shoulder closure on 6th Ave N.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
VZtelecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
X
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe: New UG vault at old location to protect conduit integrity.
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
n a
Are the additions for the purpose of serving a single-family residential subdivision?
n/a
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
X
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: UXr V \1M � � \_J DATE: 11/16/2021
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
TELECOM
PEDESTAL
PROPOSED
RELOCATION
HANDRAIL, TYP. 5
L821
CONCRETE
STAIRS - i -
NORTH PLAZA L821
TERRACE 'v ZN TH L8
EXISTING T 2 1M9
PEDEST L
CONCRETE TERRACE. i <
- MIDDLE: ker)B r
1 _
CONCRE�L'
SOUTH LA L822 mot-
lttit- ----- °' _■■�IQ � ►�wwwwwwwwiww■Iriw�e
ti irc*��www■r�r��lanww�■!�ww��w11•www■I
�ttt��t �www■e�w�awwwwswwwwwr!�+wlw
�_wwwwlw��■.awwww�w�vwwwrn_
■�_ ■rrws■ww■�wwwle w�ww■..ra■
IIIIIII �ie�ir��wr.rrL,w�vlr���.lMr►..r+r.IlRili.�oslssm�
■ww■■=www■■w■■■■ ■r.�ct•wo
■wwa`>I ■w■ r,l■rw■�`,
■wCIIIIIIIIIIIIII=MEMO lti■�w
■www=w■s =i i;i r IL
=0
■wwwwu ■I�:IwG.w
■www wsa _ _ ■■M=a:
Sam
■ww■�f;■I■a '� ■ar��s__
mesh
■www� ■■� w'seGiti'
IS1
L■lilwwolu
E=�wwsws■ i�i����
101140i i
�wsiw�nl '`'�•� ■■�■■■■■n�e■■w■i
ww ww�■■A■■■�iierslwwwww■■aa■►��s
www�iww■■w■■611■■I� ■nw■■I■■>t■rti■�ww■�Iws
'wwl�■wwnRwww■■i■■iawww►ltawwwww�l
ww■o:w�lwwwl�■wwwww�lwwwwwww.
aww_�I��� ���TTEil�I�E���l�L�!1•!l�T�
f�i[tEQ�S
0
TREE IRATE -
TYPE A, TYP.
SILVA CELLS EXTENT,
TYE�. (TREE AT
PAiNG)
RESTROOM' BUILDING,
OWNER FURNISHED &
INSTALLED
a
e
CONCRETE
TERRACE -SOUTH L828 '" " `T. - - - - - -
_ _ - + —
SE{HDE CAJJOP_`- =-SEE _ _ -WNG SENSOR -SEE
-_-=---=ARCHITTURE- _-__====F9U9TNN DESIGI4=====_=_==i=_
L1J = -_-_-_ -T-
L-=i2---- -- - L - - - -- --
Z APPROVED PROJECT =- ___F7
WHO: Henry Schroder, P.E.-
Capital Projects Manager Mike Ha Kahan
Engineering Division / City of Edmonds Ziply OSP Engineer -
121 51h Ave N / Edmonds, WA 98020 mike.hakahanC@ziply,
425-771-0220 x 1329 425-949-0230
Cell: 425-361-8825 / Fax: 425-672-5750 z I
WHAT: Relocation of FDH5023' I
WHERE: 310 6TH Ave N, Edmonds, WA 98020
y - P y
WHEN: 10/18/2021-12/31/2021 flbe -
WHY: Edmonds Civic Center Playfield property development with ROW
request to move FDH due to pedestrian traffic at new staircase. New FDH
location should be 7' west towards road and 3' south (centered on future
sidewalk joints). Exchange: 51419
HOW: Trench 10' with split duct and new (2) 4" duct for new FDH
placement and leave (2) stacked Quazite 2x3HH at original location to Project: 5509329
protect original splice cases.
LEGEND
CONCRETE PAVING TYPE 1 (1/1.810)
CONCRETE PAVING TYPE 2 (I/L810)
CONCRETE PAVING TYPE 2A
CONCRETE PAVING TYPE 28
CONCRETE PAVING TYPE 2C
CONCRETE PAVING TYPE 3 (1/1-810)
DECOMPOSED GRANITE ON GRADE - PEDESTRIAN (7/1.812)
BASE BID: ASPHALT PAVING - PEDESTRIAN (2/1-810)
ALT Q2: RU88ER TRACK SURFACING (1/1.812)
®
ASPHALT PAVING - VEHICULAR (3/1-810)
LAWN AREA
PLANTING AREA
L.O.W. (OFFSET 5' FOR
�+ MATCH LINE
---- PROPERTY LINE
PROPOSED TREE
+ EXISTING TREE
ENGINEERING DIVISION
---------
APPROVED AS NOTED
XXX CF j SILVA CELL EXTENTS
01 /05/2022
LIGHTING SCHEDULE
SYMBOL NAME
DETAIL
® I POLE LIGHT
SEE SPECS
FURNISHINGS SCHEDULE
SYMBOL NAME DETAIL
®®
TRASH/RECYCLING RECEPTACLES
3A840
! 1 I t
BIKE RACK
4A840
g
DRINKING FOUNTAIN
2/1-840
UTILITIES SCHEDULE
SYMBOL NAME DETAIL
I[A E
CATCH BASIN LID
14/C313, 16/C313
MANHOLE LID
5-6/C310
OCC
CLEANOUT
4/C310
CEI
ELECTRICAL PEDESTAL
(CONVENIENCE POWER)
1/E700
QHB
HOSE 018
11/1_840
CONCRETE FINISH SCHEDULE
SITE ELEMENT FINISH
CONCRETE PAVING, PEDESTRIAN TYPE I
WATER BASED SURFACE RETARDANT
- TYPE A
WATER BASED SURFACE RETARDANT
CONCRETE PAVING, PEDESTRIAN TYPE 2
- TYPE B
CONCRETE PAVING, PEDESTRIAN TYPE 3
WATER BASED SURFACE RETARDANT
- TYPE C
CONCRETE PAVING, PEDESTRIAN TYPE 2A
INTEGRAL COLOR, WATER BASED SURFACE
RETARDANT - TYPE 0, MICA AGG.
CONCRETE PAVING, PEDESTRIAN TYPE 28
INTEGRAL COLOR, WATER BASED SURFACE
RETARDANT - TYPE D
CONCRETE PAVING, PEDESTRIAN TYPE 2C
INTEGRAL COLOR, WATER BASED SURFACE
RETARDANT - TYPE E. MONOCHROME AGG.
SEAT WALL riff 1, 2, k 3
INTEGRAL COLOR, ARCHITECTURAL CONCRETE,
WATER BASED RETARDANT - TYPE B
CONCRETE RETAINING WALL TYPE 1 2
ARCHITECTURAL CONCRETE, WATER BASED
RETARDANT - TYPE 8
SCRAMBLE WALL
ARCHITECTURAL CONCRETE, RUBBED FINISH
ARCHITECTURAL CONCRETE, WATER BASED
CONCRETE STAIRS
RETARDANT - TYPE 8
ARCHITECTURAL CONCRETE, WATER BASED
CONCRETE SEAT TERRACE
RETARDANT - TYPE B _
CONCRETE CURB TYPE 1, 2, k 3;
WATER BASED SURFACE RETARDANT
FLUSH CURB
- TYPE B
PAGE 1 OF 1
N
0 2 5 1 0 SCALE 1" = 10'-0" J)
E .
OF ED.L/O
7�c 1890
CITY OF EDMONDS
700 MAN STREET
EDMONDS, WA 98020
425771-0320
WALKERINIA, Y
121E 4F0 —VE. EVITE 141E
E^. <ttE' W. E41E1
RECEIVED
NOV 16 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
CIVIC CENTER
PLAYFIELD
EDMONDS, WA
wnEas��
osE �
KEY PLAN
P3282.04
ESE•' AMSMS Ie� - WAR
BID SET
aoaaTc,
03/12/2021
E�
MATERIALS
PLAN
ENLARGEMENT
L206
LEGEND:
O
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
WARNING SIGN
(WHERE REQUIRED)
DIRECTION OF TRAFFIC
NOT PAVEMENT MARKINGS)
FLAGGER
(AS NEEDED)
M
ENGINEERING DIVISION
APPROVED AS NOTED
%pal LVL,10,44z 01 /05/2022
vv
SIGN LEGEND:
ROAD SHOULDER
WORK WORK
AHEAD
> <
W20-1 W21-5
6TH AVE N
(25 MPH)
SPRA G UE S T
(25 MPH)
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
PRIVATE DR WY.
(25 MPH)
SIDEWALK
SHOULDER
DRIVEWAY
PHASE 1 7, -0
WORK DETAILS:
O TELECOM PEDESTAL PROPOSED
REL❑CATI❑N.
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS.
SHOULDER (L/3) 200' 200'—
/(DWORK
AREA
117 W21-5N W20-1
An _SlDEWA
41 1
• SHOULDER
SIDEWA K DRIVEWAY
6TH AVE N
(25 MPH)
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
OAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25 30
35
40
45
50
55
60
65
70
8
40 40
60
90
120
130
150
160
170
190
10
40 60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
RECEIVED
NOV 16 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
zilyfiber
p
Everett, WA 98206
0) U H
M O N
rn 00 w
o rn
L0 a Q
of
o_
(n V)
Z
o z
o w
w >
Q
z
> c~c
Q
0
M
Y3
M o
z
0
W W Q
a a
N
LL
LL
Q
3
F-
rn
CV
M
0
Q
z
n
A
w
DATE: 11.15.2021
DESIGNED BY: S. UNGERECHT
ATCO CONTACT: 206.516.9038
stephen.ungerecht@atcotelecom.com
SCALE: SHEET-
1 40' 22
N0: 2 0F 2
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
Sprague St Sprague St Sprague St Sprague St Sprague St
o`
Edmonds Health Clinic =r
Sl Q a
Fd m
� z
°�dSsr Civic Field
S Sl
SemaConnect s
Charging Station m
ti ® 2
South Count,.
Fire Station
Q
ti
h
WORK AREA
2 D
Z
h
Free 3 Hours
Public Parking
QEdmonds
QMunicipal Court
r
4i
•310 6th Ave N,
Edmonds, WA 98020
VICINITY MAP
N
RECEIVED
NOV 16 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
41 O
ATCO COMMUNICATIONS SERVICES, LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCS# 012911
zilyfiber
p
Everett, WA 98206
O O r
M O
0) 00 Li.l
O O D
0 0
o_
vi to
O
Z
O z
L LJ
w >
a
z
S
> Cc
Q
H
O
O
M
ry
W
O
U
3
U
rn
CV
M
O
In
n
A
w
DATE:
11.15.2021
DESIGNED BY:
S. UNGERECHT
ATCO CONTACT: 206.516.9038
stephen.ungerecht0atcotelecom.com
SCALE:
SHEET:
� OT TO
01
SCALE
NO: 1 OF 2
From: Hakahan, Mike <mike.hakahan@ziply.com>
Sent: Wednesday, December 22, 2021 3:12 PM
To: Edmonds Engineering Permits
Cc: Danielle Herrera
Subject: RE: ENG2021-0448 310 6TH AVE N
Categories: Blue category
Hi Jeff,
It's not a normal pedestal. It's an interfacing cabinet that we call a hub. They are designed for above
ground access so technicians can make network changes. The below ground vault this cabinet sits on
top of is what already contains a large cable splicing arrangement. Here's an example of what the
cabinet looks like inside, as you can see it has a door:
J
F � Q
Thank you,
Mike HaKahan, Ziply OSP Engineer
425-949-0230 mike.hakahan@ziply.com
From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov>
Sent: Wednesday, December 22, 2021 5:55 PM
To: Hakahan, Mike <mike.hakahan@ziply.com>; Edmonds Engineering Permits
<EngineeringPermits@edmondswa.gov>
Cc: Danielle Herrera <DANIELLE@PACCAB.COM>
Subject: RE: ENG2021-0448 310 6TH AVE N
Hi Mike,
I understand that this came from the city but my question is that since you are moving the pedestal can
it be placed in a handhold or a vault underground?
City of Edmonds, Engineering Division Permitting
EngineeringPermits@edmondswa.gov
Jeff Whatmore, Engineering Technician
(425) 771-0220 ext. 1339
CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS.
Development services will continue to be provided by email or the web and by phone.
Please visit www.edmondswa.gov for up-to-date information on City services.
For engineering permit inquiries, please email: engineeringpermits edmondswa.gov
For all other inquiries please email: devserv.admin(@edmondswa.gov.
Web Map: www.maps.edmondswa.gov
From: Hakahan, Mike <mike.hakahan@ziply.com>
Sent: Tuesday, December 21, 2021 9:03 AM
To: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov>
Cc: Danielle Herrera <DANIELLE@PACCAB.COM>
Subject: RE: ENG2021-0448 310 6TH AVE N
Hi Jeff,
If we are discussing the attached project 5509329, this came as a request from Henry Schroder who
recommended the sidewalk relocation per his sketch below:
TELECOM
PEDESTAL
PROPOSED
RELOCATION
HANDRAIL. TYP.
CONCRETE
STAIRS -
NORTH PLAZA
CONCRETE
TERRACE - NORTh
EXISTING
PEDESTAL
CONCRETE TERRACI
- uIDDLF
Thank you,
Mike HaKahan, Ziply OSP Engineer
425-949-0230 mike.hakahan@ziply.com
CONCRETE SEAT
WALL - TYPE 1
From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov>
Sent: Tuesday, December 21, 2021 10:05 AM
To: Hakahan, Mike <mike.hakahan@ziply.com>
Cc: Danielle Herrera <DANIELLE@PACCAB.COM>
Subject: ENG2021-0448 310 6TH AVE N
WARNING: External email. Please verify sender before opening attachments or
clicking on links.
Good morning Mike,
I have reviewed your ROW permit application and have a few comments/questions.
• The current proposal is to place a pedestal in the sidewalk. The location would be an obstacle
for pedestrians. Can a handhold or a vault be installed inground instead of an aboveground
pedestal? If this can not be achieved please explain why.
Thank you, Hope you have a Happy Holidays!
Jeff Whatmore I Engineering Tech
City of Edmonds
121 5t" Ave N Edmonds WA 98026
425.771.0220 ext. 1339 I jeff.whatmore@edmondswa.�ov
CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS.
Development services will continue to be provided by email or the web and by phone.
Please visit www.edmondswa.gov for up-to-date information on City services.
For engineering permit inquiries, please email: engineeringpermits6d�edmondswa.gov
For all other inquiries please email: devserv.admin(a)_edmondswa.gov.
Web Map: www.maps.edmondswa.gov