Loading...
ENG2021-0448 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds www.cityofedmonds.gov Description: ZIPLY-RELOCATE FDH AS PART OF CIVIC CENTER PLAYFIELD PROJECT ISSUED: 01/06/2022 Address: 310 6TH AVE N EDMONDS WA 98020-3089 EXPIRES: 07/06/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434210000000 NAME TYPE NAME ADDRESS PHONE APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 CONTRACTOR PACIFIC CABLE CONSTRUCTION, INC. , EVERETT WA 98201-1255 (425)348-7735 OWNER CITY OF EDMONDS 700 MAIN ST, EDMONDS WA 98020 (425)771-0230 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 01 /06/2022 RELEASED BY DATE Printed: Thursday, January 06, 2022 2:40:46 PM 1 of 2 -KRWOF WAY EUC PERMIT ER City of • • • www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" Printed: Thursday, January 06, 2022 2:40:46 PM 2 of 2 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband arovider Zialy Fiber to Telecommunications and broadband provider Ziyly Fiber to relocate of FDH.9023 at :Il0 6th Ave N, Edmonds, WA 98020 from 10/18/2021 - 12/31/2021. the edmonds civic center playfeild property development with TOW request to move FDH due to pedestrian traffic at new staircase. New FDH location should be 7' west towards road and 3' south centered on future sidewalk joints. This will require a 10' split duct and new (2) 4" duct for new FDH placement and leave 2 stacked Quazrte 2x3HH at original location to protect original splice cases. This will require a shoulder closure on 6th Ave N. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: VZtelecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No X 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? X If yes, describe: New UG vault at old location to protect conduit integrity. 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility stem? If es: X Are the additions for the purpose of serving new commercial development? n a Are the additions for the purpose of serving a single-family residential subdivision? n/a Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the X project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: UXr V \1M � � \_J DATE: 11/16/2021 APPLICANT PRINTED NAME: APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY TELECOM PEDESTAL PROPOSED RELOCATION HANDRAIL, TYP. 5 L821 CONCRETE STAIRS - i - NORTH PLAZA L821 TERRACE 'v ZN TH L8 EXISTING T 2 1M9 PEDEST L CONCRETE TERRACE. i < - MIDDLE: ker)B r 1 _ CONCRE�L' SOUTH LA L822 mot- lttit- ----- °' _■■�IQ � ►�wwwwwwwwiww■Iriw�e ti irc*��www■r�r��lanww�■!�ww��w11•www■I �ttt��t �www■e�w�awwwwswwwwwr!�+wlw �_wwwwlw��■.awwww�w�vwwwrn_ ■�_ ■rrws■ww■�wwwle w�ww■..ra■ IIIIIII �ie�ir��wr.rrL,w�vlr���.lMr►..r+r.IlRili.�oslssm� ■ww■■=www■■w■■■■ ■r.�ct•wo ■wwa`>I ■w■ r,l■rw■�`, ■wCIIIIIIIIIIIIII=MEMO lti■�w ■www=w■s =i i;i r IL =0 ■wwwwu ■I�:IwG.w ■www wsa _ _ ■■M=a: Sam ■ww■�f;■I■a '� ■ar��s__ mesh ■www� ■■� w'seGiti' IS1 L■lilwwolu E=�wwsws■ i�i���� 101140i i �wsiw�nl '`'�•� ■■�■■■■■n�e■■w■i ww ww�■■A■■■�iierslwwwww■■aa■►��s www�iww■■w■■611■■I� ■nw■■I■■>t■rti■�ww■�Iws 'wwl�■wwnRwww■■i■■iawww►ltawwwww�l ww■o:w�lwwwl�■wwwww�lwwwwwww. aww_�I��� ���TTEil�I�E���l�L�!1•!l�T� f�i[tEQ�S 0 TREE IRATE - TYPE A, TYP. SILVA CELLS EXTENT, TYE�. (TREE AT PAiNG) RESTROOM' BUILDING, OWNER FURNISHED & INSTALLED a e CONCRETE TERRACE -SOUTH L828 '" " `T. - - - - - - _ _ - + — SE{HDE CAJJOP_`- =-SEE _ _ -WNG SENSOR -SEE -_-=---=ARCHITTURE- _-__====F9U9TNN DESIGI4=====_=_==i=_ L1J = -_-_-_ -T- L-=i2---- -- - L - - - -- -- Z APPROVED PROJECT =- ___F7 WHO: Henry Schroder, P.E.- Capital Projects Manager Mike Ha Kahan Engineering Division / City of Edmonds Ziply OSP Engineer - 121 51h Ave N / Edmonds, WA 98020 mike.hakahanC@ziply, 425-771-0220 x 1329 425-949-0230 Cell: 425-361-8825 / Fax: 425-672-5750 z I WHAT: Relocation of FDH5023' I WHERE: 310 6TH Ave N, Edmonds, WA 98020 y - P y WHEN: 10/18/2021-12/31/2021 flbe - WHY: Edmonds Civic Center Playfield property development with ROW request to move FDH due to pedestrian traffic at new staircase. New FDH location should be 7' west towards road and 3' south (centered on future sidewalk joints). Exchange: 51419 HOW: Trench 10' with split duct and new (2) 4" duct for new FDH placement and leave (2) stacked Quazite 2x3HH at original location to Project: 5509329 protect original splice cases. LEGEND CONCRETE PAVING TYPE 1 (1/1.810) CONCRETE PAVING TYPE 2 (I/L810) CONCRETE PAVING TYPE 2A CONCRETE PAVING TYPE 28 CONCRETE PAVING TYPE 2C CONCRETE PAVING TYPE 3 (1/1-810) DECOMPOSED GRANITE ON GRADE - PEDESTRIAN (7/1.812) BASE BID: ASPHALT PAVING - PEDESTRIAN (2/1-810) ALT Q2: RU88ER TRACK SURFACING (1/1.812) ® ASPHALT PAVING - VEHICULAR (3/1-810) LAWN AREA PLANTING AREA L.O.W. (OFFSET 5' FOR �+ MATCH LINE ---- PROPERTY LINE PROPOSED TREE + EXISTING TREE ENGINEERING DIVISION --------- APPROVED AS NOTED XXX CF j SILVA CELL EXTENTS 01 /05/2022 LIGHTING SCHEDULE SYMBOL NAME DETAIL ® I POLE LIGHT SEE SPECS FURNISHINGS SCHEDULE SYMBOL NAME DETAIL ®® TRASH/RECYCLING RECEPTACLES 3A840 ! 1 I t BIKE RACK 4A840 g DRINKING FOUNTAIN 2/1-840 UTILITIES SCHEDULE SYMBOL NAME DETAIL I[A E CATCH BASIN LID 14/C313, 16/C313 MANHOLE LID 5-6/C310 OCC CLEANOUT 4/C310 CEI ELECTRICAL PEDESTAL (CONVENIENCE POWER) 1/E700 QHB HOSE 018 11/1_840 CONCRETE FINISH SCHEDULE SITE ELEMENT FINISH CONCRETE PAVING, PEDESTRIAN TYPE I WATER BASED SURFACE RETARDANT - TYPE A WATER BASED SURFACE RETARDANT CONCRETE PAVING, PEDESTRIAN TYPE 2 - TYPE B CONCRETE PAVING, PEDESTRIAN TYPE 3 WATER BASED SURFACE RETARDANT - TYPE C CONCRETE PAVING, PEDESTRIAN TYPE 2A INTEGRAL COLOR, WATER BASED SURFACE RETARDANT - TYPE 0, MICA AGG. CONCRETE PAVING, PEDESTRIAN TYPE 28 INTEGRAL COLOR, WATER BASED SURFACE RETARDANT - TYPE D CONCRETE PAVING, PEDESTRIAN TYPE 2C INTEGRAL COLOR, WATER BASED SURFACE RETARDANT - TYPE E. MONOCHROME AGG. SEAT WALL riff 1, 2, k 3 INTEGRAL COLOR, ARCHITECTURAL CONCRETE, WATER BASED RETARDANT - TYPE B CONCRETE RETAINING WALL TYPE 1 2 ARCHITECTURAL CONCRETE, WATER BASED RETARDANT - TYPE 8 SCRAMBLE WALL ARCHITECTURAL CONCRETE, RUBBED FINISH ARCHITECTURAL CONCRETE, WATER BASED CONCRETE STAIRS RETARDANT - TYPE 8 ARCHITECTURAL CONCRETE, WATER BASED CONCRETE SEAT TERRACE RETARDANT - TYPE B _ CONCRETE CURB TYPE 1, 2, k 3; WATER BASED SURFACE RETARDANT FLUSH CURB - TYPE B PAGE 1 OF 1 N 0 2 5 1 0 SCALE 1" = 10'-0" J) E . OF ED.L/O 7�c 1890 CITY OF EDMONDS 700 MAN STREET EDMONDS, WA 98020 425771-0320 WALKERINIA, Y 121E 4F0 —VE. EVITE 141E E^. <ttE' W. E41E1 RECEIVED NOV 16 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CIVIC CENTER PLAYFIELD EDMONDS, WA wnEas�� osE � KEY PLAN P3282.04 ESE•' AMSMS Ie� - WAR BID SET aoaaTc, 03/12/2021 E� MATERIALS PLAN ENLARGEMENT L206 LEGEND: O SIGNALIZED INTERSECTION O CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS WARNING SIGN (WHERE REQUIRED) DIRECTION OF TRAFFIC NOT PAVEMENT MARKINGS) FLAGGER (AS NEEDED) M ENGINEERING DIVISION APPROVED AS NOTED %pal LVL,10,44z 01 /05/2022 vv SIGN LEGEND: ROAD SHOULDER WORK WORK AHEAD > < W20-1 W21-5 6TH AVE N (25 MPH) SPRA G UE S T (25 MPH) BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' PRIVATE DR WY. (25 MPH) SIDEWALK SHOULDER DRIVEWAY PHASE 1 7, -0 WORK DETAILS: O TELECOM PEDESTAL PROPOSED REL❑CATI❑N. SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS. SHOULDER (L/3) 200' 200'— /(DWORK AREA 117 W21-5N W20-1 An _SlDEWA­ 41 1 • SHOULDER SIDEWA K DRIVEWAY 6TH AVE N (25 MPH) ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, OAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) NOTE: MON. - FRI. = 7:00am TO 4:00pm CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' RECEIVED NOV 16 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. O ATCO COMMUNICATIONS SERVICES. LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 zilyfiber p Everett, WA 98206 0) U H M O N rn 00 w o rn L0 a Q of o_ (n V) Z o z o w w > Q z > c~c Q 0 M Y3 M o z 0 W W Q a a N LL LL Q 3 F- rn CV M 0 Q z n A w DATE: 11.15.2021 DESIGNED BY: S. UNGERECHT ATCO CONTACT: 206.516.9038 stephen.ungerecht@atcotelecom.com SCALE: SHEET- 1 40' 22 N0: 2 0F 2 ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) Sprague St Sprague St Sprague St Sprague St Sprague St o` Edmonds Health Clinic =r Sl Q a Fd m � z °�dSsr Civic Field S Sl SemaConnect s Charging Station m ti ® 2 South Count,. Fire Station Q ti h WORK AREA 2 D Z h Free 3 Hours Public Parking QEdmonds QMunicipal Court r 4i •310 6th Ave N, Edmonds, WA 98020 VICINITY MAP N RECEIVED NOV 16 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 41 O ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 zilyfiber p Everett, WA 98206 O O r M O 0) 00 Li.l O O D 0 0 o_ vi to O Z O z L LJ w > a z S > Cc Q H O O M ry W O U 3 U rn CV M O In n A w DATE: 11.15.2021 DESIGNED BY: S. UNGERECHT ATCO CONTACT: 206.516.9038 stephen.ungerecht0atcotelecom.com SCALE: SHEET: � OT TO 01 SCALE NO: 1 OF 2 From: Hakahan, Mike <mike.hakahan@ziply.com> Sent: Wednesday, December 22, 2021 3:12 PM To: Edmonds Engineering Permits Cc: Danielle Herrera Subject: RE: ENG2021-0448 310 6TH AVE N Categories: Blue category Hi Jeff, It's not a normal pedestal. It's an interfacing cabinet that we call a hub. They are designed for above ground access so technicians can make network changes. The below ground vault this cabinet sits on top of is what already contains a large cable splicing arrangement. Here's an example of what the cabinet looks like inside, as you can see it has a door: J F � Q Thank you, Mike HaKahan, Ziply OSP Engineer 425-949-0230 mike.hakahan@ziply.com From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Sent: Wednesday, December 22, 2021 5:55 PM To: Hakahan, Mike <mike.hakahan@ziply.com>; Edmonds Engineering Permits <EngineeringPermits@edmondswa.gov> Cc: Danielle Herrera <DANIELLE@PACCAB.COM> Subject: RE: ENG2021-0448 310 6TH AVE N Hi Mike, I understand that this came from the city but my question is that since you are moving the pedestal can it be placed in a handhold or a vault underground? City of Edmonds, Engineering Division Permitting EngineeringPermits@edmondswa.gov Jeff Whatmore, Engineering Technician (425) 771-0220 ext. 1339 CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS. Development services will continue to be provided by email or the web and by phone. Please visit www.edmondswa.gov for up-to-date information on City services. For engineering permit inquiries, please email: engineeringpermits edmondswa.gov For all other inquiries please email: devserv.admin(@edmondswa.gov. Web Map: www.maps.edmondswa.gov From: Hakahan, Mike <mike.hakahan@ziply.com> Sent: Tuesday, December 21, 2021 9:03 AM To: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Cc: Danielle Herrera <DANIELLE@PACCAB.COM> Subject: RE: ENG2021-0448 310 6TH AVE N Hi Jeff, If we are discussing the attached project 5509329, this came as a request from Henry Schroder who recommended the sidewalk relocation per his sketch below: TELECOM PEDESTAL PROPOSED RELOCATION HANDRAIL. TYP. CONCRETE STAIRS - NORTH PLAZA CONCRETE TERRACE - NORTh EXISTING PEDESTAL CONCRETE TERRACI - uIDDLF Thank you, Mike HaKahan, Ziply OSP Engineer 425-949-0230 mike.hakahan@ziply.com CONCRETE SEAT WALL - TYPE 1 From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Sent: Tuesday, December 21, 2021 10:05 AM To: Hakahan, Mike <mike.hakahan@ziply.com> Cc: Danielle Herrera <DANIELLE@PACCAB.COM> Subject: ENG2021-0448 310 6TH AVE N WARNING: External email. Please verify sender before opening attachments or clicking on links. Good morning Mike, I have reviewed your ROW permit application and have a few comments/questions. • The current proposal is to place a pedestal in the sidewalk. The location would be an obstacle for pedestrians. Can a handhold or a vault be installed inground instead of an aboveground pedestal? If this can not be achieved please explain why. Thank you, Hope you have a Happy Holidays! Jeff Whatmore I Engineering Tech City of Edmonds 121 5t" Ave N Edmonds WA 98026 425.771.0220 ext. 1339 I jeff.whatmore@edmondswa.�ov CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS. Development services will continue to be provided by email or the web and by phone. Please visit www.edmondswa.gov for up-to-date information on City services. For engineering permit inquiries, please email: engineeringpermits6d�edmondswa.gov For all other inquiries please email: devserv.admin(a)_edmondswa.gov. Web Map: www.maps.edmondswa.gov