ENG2021-0511 ROW PERMITOF WAY EUC PERMIT
PERMITNUMBER,
City of Edmonds
EdmondsRIGHT
98020 1 1Li
www.cityofedmonds.gov
Description: PSE-INSTALL GAS SERVICE FOR RYKER YOUNG SP ISSUED: 01/07/2022
Address: 20118 83RD AVE W EDMONDS WA 98026
EXPIRES: 07/07/2022
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00431200000404
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
OWNER REAL PROPERTY FUNDING GRP LLC 7500 ROOSEVELT WAY NE, SEATTLE WA 98115 (206)523-0300
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00
•
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
01 /07/2022
RELEASED BY
DATE
Printed: Friday, January 07, 2022 3:02:39 PM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
•:• •ENG2021-0511
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
•
INSPECTION TYPE
DATE RESULT
NOTES
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
Printed: Friday, January 07, 2022 3:02:39 PM 2 of 2
ENG2021-0511
of E°M041.� RECEIVED
RIGHT OF WAY CONSTRUCTION DEC 10 2021
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
/'Vc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 106383073
Site Address or if no site address use Property Address at NW corner of project area: 20118 83rd AVE W
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
State WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ixSingle family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
From main on 83rd AVE W - Install approx. 17 0 o - scat svc u Ex -in
PSE provided trench work area is approx 14' W to 25' W c/1 of 83rd AVE W & 460' S c/1 of 200th ST SW
(1) 3x2 paving cut (1) 3x3 Grass cut anticipated
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
2-3 Days
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power Ex gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Susan Sidick DATE: 12/09/2021
APPLICANT PRINTED NAME: Susan Sidick
APPLICANT TITLE: SR Permi+ CnArialict
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Job #:
Date:
Jurisdiction:
ROW Permit:
Est. Start Date:
Est. Duration:
Puget Sound Energy Gas Pre -Inspect Form
106383073
12/8/21 Address: 20118 83rd AVE W
Edmonds City / Zip: Edmonds, 98026
Yes Customer: Micah Humann 509-995-8822
2/7/21 PM / Inspector: Ariella Emlen 804-944-7012
2 Days (16 Hours)
RECEIVED
DEC 10 2021
CITY OF EDMONDS
— DEVELOPMENT
SERVICES DEPARTMENT
Job Description
Project Scope: From 2" STW main on 83rd AVE W
- Install approx. 170' of 1-1/8" PE scat svc (16' Stub / 154' Ext) in PSE provided
New Construction:
Yes
trench and set A425 meter out left for 20114 and
an A425 meter out left for 20118 using customer
provided conduit.
Construction Method
SCHEDULE ALL INSPECTIONS
THROUGH MYBUILDINGPERMIT.COM
All Scat/Trenchless
PLAT Map: 162.069
Gas main in soft surface,
Z
work pit may go into hard
IV
N
surface driveway
200th ST SW
efosoil
PL
C L
PL
PL
\ I
y
I I I
Ingress Driveway
77d*
I I I
............... 1.
.............................
LU
a�...............
................� I
...........a
Q
....................
............
...............
co....
......................._�.
I 00
CD
..
0�...........................
N
I
3
..............I.... I :
..............I....
CL...............:...
PL
o
3 ^
..............�..
Applicant shall repair/replace all
=`
PL.......................s................s...
€ CL
PL
damage to utilities or frontage
improvements in City right-of-way
...............
••••••-
per city standards that is caused or
€ €
60p� ROW
occurs during the permitted project.
..................................p...............p.........
.................................................:................:................:................:.................................>................>......
ENGINEERING DIVISION
"DTED
OWNER/CONTRACTOR IS RESPONSIBLE
FOR
EROSION CONTROL AND DRAINAGE
_
p(�6_ L4_v 11/06/2022
Work
Location
Size of Cut
Surface Type
14'
West
of CL
83rd AVE W
&
460'
South
of CL
200th ST SW
TX 2'
A
25'
West
of CL
83rd AVE W
&
460'
South
of CL
200th ST SW
TX 3'
GRS
of CL
&
of CL
of CL
&
of CL
of CL
&
of CL
Service Information
Street Information
Job Type
Diameter:
1-1/8" PE
Flaggers #:
Arterial:
No
New Residential Svc
EFV:
1-1/8" - 2600 - 9999144
Police #:
TCP:
Yes
Tie -In Fitting
Meter:
A425
A425
Speed Limit:
20
No Parks #:
Steel
- 1" Sery x 1/8" PE Outlet (MOP) - 125
9997039
Meter Loc:
03 - OL
Trolley Lines:
No
Mtr Hoods #:
Del Press:
6" W.C.
Traffic Signal:
Bus Stop:
No
SNO
YRD - Snohomish
Bollards:
2.5" #
4" #
ADA Ramps #:
0
Route #'s:
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
TEMPORARY TRAFFIC CONTROL PLAN
0' 35' 70'
PRINT ON
11X17" SHEETS ONLY
�)1141dvoo
3HVM 'a
..
Dv3HV p
avoa o
W3-4 o
9
D
I
I
m 03SO10
m M/S
I
3
O I
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY &
DRIVEWAY CLOSURE I I
3
O
SM CLOSED
OTHER SIDE
#20114 #20114 &
I
I
I
I
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall
not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m
8. Work area will be 14' and 25' WCL of 83rd Ave W &
460' SCL of 200th ST SW.
9. If used, place NO -PARK signs 72 hours in
advance of the day that the work is to be done.
110
I
J10
�IQ
I
PUGET
SOUND
ENERGY
I
I
I
I
I
I
I 30
I �
I
I
I
I
I
3
I 0
� I I
I ;
o
I '
I
I ,
a
200TH ST SW
ENGINEERING DIVISION
DTED
i (�WU " 11 /06/2022
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
FLAGGERS SHALL STOP PEDESTRIANS TO
TRAFFIC AND ASSIST BE DIRECTED TO
PEDESTRIANS CROSS
CROSS AT
NEAREST
INTERSECTIONS
0
o Q
W3-4
ONELANE O
o. ROAD j
AHEAD
ROAD
WORK oN
AHEAD 3:
---------------------------
-- 2i121V�PL-SW-----------
I
SIGN SPACING
MPH"XII
60/65
1000,
45/55
500,
35/40
350'
30
200'
25
100'
Designer:
Jason Bisenius
425-424-7316
jason.bisenius@pse.com
RECEIVED
DEC 10 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
CHANNELIZATION
DEVICE SPACING
MPH
TAPER
TANGENT
55/70
40
80
35/45
30
60
25/30
20
40
Project Address:
20114 & 20118 83RD AVE W, EDMONDS, WA 98026.
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Ep. 09/30/2023
LEGEND
®
28" TRAFFIC CONE
®
WORK PIT
TRAFFIC FLOW
FLAGGER
WORK VEHICLE/
FLASHING LIGHTS
SIGN LOCATION
RIGHT OF WAY
Row
REV
12/07/2021 0
Job #
106383073
1 OF 1
20102199PE
4
5/8" PE
1994
20035
5/8" PE
1993
20111
5/8" MPE
1999
20115
No electric grid information available
S 160068, Q 162069
12-03-2021
The information on the attachetl maps is subject to change without notice. Puget Sound Energy makes no warranty. expressed or implied concerning
the sui}ability of this information for any purpose. Recipien}agrees to not disclose this confidential information to any o}her person or entity.
unless authorized in writing by Puget Sound Energy. This map is not to be used for tletermining the actual location of any PSE facilities (call 811)."
6 3/4"
20114
457'S
20124
Scale 1:450
Lat\Long=47.8165,-122.3458
3
u 457'S
14'W B 460'S
54'S,10'W
272'N
9
0
M
10
01
LO
N ('M
04 LO
20101
5/8" PE
1990
5/8" MPE
1996
20111
201
OD400.
PUGET SOUND ENERGY