Loading...
Building PermitType: FENCE Subtype: RESIDENTIAL FENCE I Status: ISSUED Parcel No: 00619401001002 Subdivision: 006194 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Scope of Work: BARELA- FENCE Site Address: 1109 B AVE S EDMONDS,WA 98020 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 WA State Contractor L & I #: Applied: 12/21/2021 Issued: 1/7/2022 Final: Expiration Date: 7/6/2022 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT ALONZO BARELA 1109 B AVE SOUTH, EDMONDS (206)718-9254 ALONZOBARELA@HOTMAIL.COM WA 98020 CONTACT ALONZO BARELA 1109 B AVE SOUTH, EDMONDS (206)718-9254 alonzobarela@hotmail.com WA 98020 CONTRACTOR CONTRACTOR UNKNOWN OWNER ALONZO BARELA 1109 B AVE SOUTH, EDMONDS (206)718-9254 WA 98020 MIL AL FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/21/21 R16755 PER PERMIT FENCE - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $35.00 $35.00 12/21/21 R16755 FENCE - SUB RES ENG INSP FEE 001.000.341.82.000.00 $35.00 $35.00 12/21/21 R16755 FENCE - SUB RES ENG REVIEW FEE 001.000.341.82.000.00 $30.00 $30.00 12/21/21 R16755 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 12/21/21 R16755 TOTALS: $146.50 $146.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, January 07, 2022 3:21:23 PM 1 of 2 Permit City of Edmonds PERMIT NUM EdmondsFENCE 98020 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. INSPECTIONSSchedule •https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-2 ENGINEERING FINAL" E-4 FENCE Printed: Friday, January 07, 2022 3:21:23 PM 2 of 2