Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 01070900010600 Site Address: 505 5TH AVE S 106 EDMONDS,WA 98020-3459 Subdivision: 010709, 007945, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $5,500.00 Occupancy Type: Construction Type: Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: THE GREGORY CONDOMINIUMS -WINDOW REPLACEMENT Applied: 11/9/2021 Issued:1/10/2022 Final: Expiration Date:1/5/2023 Issued by: WAC I WA State Contractor L & I #: TATLEG1099MN I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRITTIN ELAEA 710 2ND AVE STE 400, SEATTLE (206)957-4725 BELAEA@AMENTOGROUP.COM WA 98104 CONTACT AMENTO GROUP 710 2ND AVE STE 400, SEATTLE (206)957-4725 belaea@amentogroup.com WA 98104 CONTRACTOR TATLEY-GRUND 1115 N 97TH ST, SEATTLE WA (206)985-3774 98103 THE GREGORY 2103 148TH ST SE, MILL CREEK OWNER CONDOMINIUM-EUGENE & WA 98012 KATHERINE AUER FEE •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/15/21 R15905 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 12/27/21 R16794 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $257.20 $257.20 12/27/21 R16794 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $218.62 $218.62 11/15/21 R15905 TOTALS: $540.82 $540.82 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, January 10, 2022 10:16:49 AM 1 of 2 •M MERCIAL BLDG Permit of Edmonds PERMIT NUM IF EdmondsCity 121 5th Ave N, 98020BLD2021-15�928 www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONS - Schedule Online at: https://Inspection.MVBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-3 BUILDING FINAL" Printed: Monday, January 10, 2022 10:16:49 AM 2 of 2