Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 00451900100401 Site Address: 23632 HIGHWAY 99 SUITE I EDMONDS,WA 98026- 9211 Subdivision: 004519, LLA LL-2001-101 Lot: 0 Fire Sprinklers: Yes Lot Area: Zoning: Valuation: $5,000.00 Occupancy Type: B Construction Type: VB Code Edition: 2018 No. Stories: 1 # of Dwelling Units: 0 Scope of Work: CITY OF EDMONDS-UPTOWN CITY HALL-TI WA State Contractor L & I #: Applied: 12/17/2021 Issued:1/13/2022 Final: Expiration Date: 1/13/2023 Issued by: WAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT THOM SULLIVAN 7110 210 ST. SW, EDMONDS WA (425)760-3334 THOM.SULLIVAN@EDMONDSWA.GO 98026 V 7110 210 ST. SW, EDMONDS WA CONTACT CITY OF EDMONDS (425)760-3334 thom.sullivan@edmondswa.gov 98026 CONTRACTOR CITY OF EDMONDS-FACILITIES , CITY OF EDMONDS-FW WA- PO BOX 2539, SAN ANTONIO TX OWNER AURORA MARKETPLACE LLC 78299 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/28/21 R16820 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 1/12/22 R17260 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $240.40 $240.40 1/12/22 R17260 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $204.34 $204.34 12/28/21 R16820 TOTALS: $509.74 $509.74 CONDITION TYPE 7 STATUS NOTES Printed: Thursday, January 13, 2022 7:03:26 AM 1 of 3 •M MERCIAL BLDG Permit of Edmonds PERMIT NUM IF EdmondsCity 121 5th Ave N, 98020BLD2021-17�911 www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE X-1 FIRE FINAL" X-3 BUILDING FINAL" A-1 BUILDING PRECON B-4 FRAMING Printed: Thursday, January 13, 2022 7:03:26 AM 2 of 3 Printed: Thursday, January 13, 2022 7:03:26 AM 3 of 3