Building Permit 2020'SIDENTIAL
BLDG Permit
PERMIT NUM
City of Edmonds
wWA.edmondswa.gov•
•
Type: RESIDENTIAL BLDG
Owner/ Business: KEITH & KIM KUBIE
Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 27031300301400 Site Address: 1427 9TH AVE N EDMONDS,WA 98020-2660
Applied: 1/9/2020
Subdivision: 005319, SP S-26-87
Lot: 0
Issued: 3/9/2020
Fire Sprinklers: No Lot
Area:
Zoning:
Final:
Valuation: $35,000.00 Occupancy Type: R3
Construction
Type: VB
Expiration Date: 3/9/2021
Code Edition: 2015 No. Stories: 2
# of Dwelling
Units: 1
Issued by: NED
Scope of Work: KUBIE-REMODEL
WA State Contractor L & I #: EXPRECC066LP
City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
ELIZABETH CLAY -CLAY DESIGN
2016 E GRAND AVE., EVERETT
ELIZABETH@CLAYDESIGNLLC.ONMICR
APPLICANT
LLC
WA 98201
OSOFT.COM
CONTRACTOR TBD
,
OWNER KEITH & KIM KUBIE
1427 9TH AVE N, EDMONDS WA
(425)418-6562
KEITH@KKUBIE.COM
98020-2660
ESCRIPTION
7BASEFEE
ACCOUNT
PAID
PAID DATE RECEIPT #
1 FOR MECHANICALPERMT
001.000.322.10.000.00
_ILAMOUNT
$50.00
$0.00
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$0.00
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$35.00
$0.00
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$105.00
$0.00
TRAP
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$30.00
$0.00
FURNACE OR FIREPLACE
001.000.322.10.000.00
$30.00
$0.00
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$0.00
PLAN REVIEW FEE RES
001.000.345.83.000.00
$510.00
$510.00
1/9/20
R1802
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$0.00
RESIDENTIAL VALUATION BASED
001.000.322.10.000.00
$600.00
$0.00
FEE
TOTALS:
$1,446.50
$510.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, March 09, 2020 4:27:16 PM 1 of 2
'bIDENTIAL BLDG PermitCity
PERMITNUM
• • • •
•:i 1 1 11
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.\r
\r\r\r\r
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
FOR
requests shall be established by Council and shall be paid upon submittal and are
ALL BUILDING PERMITS
INFORMATION
nonrefundable.\r\r\r\r\r
3 - SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of Chapter
5.30, unless a variance has been granted pursuant to ECC 5.30.120\r\r\r\r\r
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
INSPECTIONS
COMPLETED
RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-4 DRYWALL FASTENING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 BUILDING PRECON
Printed: Monday, March 09, 2020 4:27:16 PM 2 of 2