Loading...
Building Permit 2020'SIDENTIAL BLDG Permit PERMIT NUM City of Edmonds wWA.edmondswa.gov• • Type: RESIDENTIAL BLDG Owner/ Business: KEITH & KIM KUBIE Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 27031300301400 Site Address: 1427 9TH AVE N EDMONDS,WA 98020-2660 Applied: 1/9/2020 Subdivision: 005319, SP S-26-87 Lot: 0 Issued: 3/9/2020 Fire Sprinklers: No Lot Area: Zoning: Final: Valuation: $35,000.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 3/9/2021 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: KUBIE-REMODEL WA State Contractor L & I #: EXPRECC066LP City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL ELIZABETH CLAY -CLAY DESIGN 2016 E GRAND AVE., EVERETT ELIZABETH@CLAYDESIGNLLC.ONMICR APPLICANT LLC WA 98201 OSOFT.COM CONTRACTOR TBD , OWNER KEITH & KIM KUBIE 1427 9TH AVE N, EDMONDS WA (425)418-6562 KEITH@KKUBIE.COM 98020-2660 ESCRIPTION 7BASEFEE ACCOUNT PAID PAID DATE RECEIPT # 1 FOR MECHANICALPERMT 001.000.322.10.000.00 _ILAMOUNT $50.00 $0.00 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $0.00 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $35.00 $0.00 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $105.00 $0.00 TRAP FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $30.00 $0.00 FURNACE OR FIREPLACE 001.000.322.10.000.00 $30.00 $0.00 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $0.00 PLAN REVIEW FEE RES 001.000.345.83.000.00 $510.00 $510.00 1/9/20 R1802 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $0.00 RESIDENTIAL VALUATION BASED 001.000.322.10.000.00 $600.00 $0.00 FEE TOTALS: $1,446.50 $510.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, March 09, 2020 4:27:16 PM 1 of 2 'bIDENTIAL BLDG PermitCity PERMITNUM • • • • •:i 1 1 11 www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision.\r \r\r\r\r 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such FOR requests shall be established by Council and shall be paid upon submittal and are ALL BUILDING PERMITS INFORMATION nonrefundable.\r\r\r\r\r 3 - SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120\r\r\r\r\r 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-4 DRYWALL FASTENING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Monday, March 09, 2020 4:27:16 PM 2 of 2