Loading...
ENG2020-0337 ROW PERMITRIGHITF WAY PERMIT ER City of • • • Ave121 5th 9801 1 1 C www.cityofedmonds.gov Description: GEOTECH BORING AT 3 LOCATIONS FOR CITY WATERLINE REPLACEMENT ISSUED: 09/04/2020 Address: 121 5TH AVE EDMONDS WA 98020 EXPIRES: 03/03/2021 Permit Type: RIGHT OF WAY Permit Subtype: CITY Parcel Number: 00434400100300 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT CITY OF EDMONDS 7 121 FIFTH AVE N, EDMONDS WA98020 CONTRACTOR HWA Geosciences 21312 30th Dr SE, Bothell WA 98021 (425)774-0106 OWNER EDMONDS CITY OF 250 5TH AVENUE N, EDMONDS WA98020 SUBCONTRAC ENVIRONMENTAL DRILLING INC 10918 159TH AVE SE, SNOHOMISH WA 98290 (360)568-2045 TOR FEE INFORMATION REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. 7- INSPECTION SCHEDULING- WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. NGriggs RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 9/4/2020 DATE Printed: Friday, September 04, 2020 1:14:44 PM 1 of 2 RIGHITF WAY PERMIT City of • • • •:• •ENG2020-0337 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or DAMAGE TO FRONTAGE frontage improvements in city right of way per city standards that is caused by or occurs during the IMPROVEMENTS permitted project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQUIRED Maintain erosion & sediment control per city standards. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from HOLD HARMLESS any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. UNDERGROUND UTILITY Call for locates of underground utilities prior to any excavation. LOCATES • INSPECTION TYPE DATE RESULT NOTES COMPLETE Printed: Friday, September 04, 2020 1:14:44 PM 2 of 2 of E c''tlo jNC. 1890 ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION Edmonds Phase 11 & 12 PROJECT NAME: Waterline Replacement CONTACT: Mike De Lilla CONTRACTOR: Environmental Drilling Inc. Phone #: 425-771-0220 Mailing Address: 10918 159th Ave SE, Snohomish, Fax #: W o 98990 State License #: ENVIRD1093M6 Email #: mike.delilla@edmondswa.gov City Business License #: NR-026378 ❑ Liability Insurance ❑ Bonded 20816 74th Ave W, 18521 ADDRESS OR INTERSECTION OF CONSTRUCTION: 73rd Ave W, 18017 69th PI W ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision X City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit9 ANY ASSOCIATED PERMITS? ❑ Other ❑ Yes ❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : HWA GeoSciences Inc. and their sub -contractor, Environmental Drilling Inc. will be drilling three bore holes for geotechnical exploration associated with the Edmonds Phase 11 & 12 Waterline Replacement Project. Boring will be done in the right-of-way specifically in the street at all three locations as shown in attached documents Figure 2A-2C. Associated traffic control will also be provided. WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YES I I NO I X Year: PAVEMENT CUT: Xyes ❑ No If yes, indicate size of cut: 2ft x 2ft CONCRETE CUT: ❑ Yes XNO If yes, indicate size of cut: x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF 0 Alley 72 Hrs + LF X LF SF 0 Parking 72 Hrs + LF X LF SF 0 APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE DATE Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Uo, GEOSCIENCES INC. DBE/MWBE August 31, 2020 HWA Project No. 2020-009-21 Blueline 25 Central Way, Suite 400 Kirkland, Washington 98033 Attn: Deanna L. Martin, P.E. Subject: Work Plan for Geotechnical Explorations 74th Ave W, 180th St SW, Olympia View Dr Phase 11&12 Waterline Replacement Project Edmonds, Washington Dear Ms. Martin, HWA GeoSciences Inc. (HWA) is planning to drill three boreholes at various locations in support of the Phase 11 & 12 Waterline Replacement project. Borehole drillings will be performed along 74th Ave W, 180th St SW, Olympia View Dr. Locations of the boring sites are shown on the Vicinity Map, Figure 1. All drilling work will be performed within the City of Edmonds right of way. We have generated this narrative to convey the specifics of our proposed geotechnical exploration plan to the City for approval and right of way use permit. Traffic control plans, developed using WSDOT Work Zone Traffic Control Guidelines, are also included in this work plan. SCOPE OF WORK We understand that the City of Edmonds (City) is planning to replace segments of water pipelines at various locations within the city as part of its Phase 11 & 12 Waterline Replacement Projects. Eight sites have been identified for waterline replacement. In addition to the waterline replacement, there are also three interties that need to be upgraded. The upgrade will involve placement of large meter vaults and will require geotechnical boring at each site. The sites requiring geotechnical boring are: • Intertie IT02 - on 74th Ave W near intersection with 2081h St. SW • Intertie IT03 — on Olympic View Drive approximately 170 feet west of intersection with 73rd Ave W • Intertie IT04 — on 180th St SW near intersection with Olympic View Drive Exploration work will consist of drilling one borehole to minimum depths of 15 feet at each intertie site to assess the subsurface soil and ground water conditions. The borings will be 21312 30th Dr. SE, STE.11o, Bothell, WA 98021 1 425.774.0106 1 hwageo.com Aug 31, 2020 HWA Project No. 2020-009-21 conducted on the asphalt pavement. Borehole location and proposed traffic control plans for the three sites are shown on Figures 2A through 2C. All work will be conducted within the City of Edmonds Right of Way. The proposed boring locations may be adjusted in the field to be at least 4 feet away from underground utilities. DRILLING PROCEDURE The geotechnical borings will be advanced by Environmental Drilling Inc. of Sammamish, Washington sub -contracted to HWA, using a truck mounted drill rig. The borings will be advanced into the ground using the hollow -stem auger drilling technique. Standard Penetration Test (SPT) sampling will be performed in the boreholes at desired intervals. Representative portions of soil samples obtained by SPT will be sealed in plastic bags. These soil samples will be then returned to our Bothell, Washington, laboratory for further examination and testing. Soil cuttings ftom the borings will be placed in steel drums and transported off site for disposal. A geotechnical engineer or a geologist from HWA will log each exploration and record all pertinent information including sample depths, stratigraphy, soil engineering characteristics, and ground water occurrence at the time of drilling. Conducting the drilling operation will typically require an approximate work area of 12 feet by 40 feet and a staging area of 10 feet by 40 feet RESTORATION After drilling is completed to the final depth at each location, the borehole will be abandoned using bentonite chips in accordance with Washington State Department of Ecology requirements, and any cuttings at the surface will be drummed and hauled off -site. The roadway surface will be patched with Aquaphalt 6.0 water activated cold patch. DURATION OF WORK HWA proposes to conduct the drilling exploration work between the hours of 9:00 AM to 5:00 PM. Assuming the tentative work hours are approved, we expect that the drilling work will take one workday. HWA will schedule the drilling work within two weeks of obtaining the permit and from approval of this exploration. TRAFFIC CONTROL PLANS Traffic control plan for the proposed explorations was developed using the MOT Work Zone Traffic Control Guidelines M54-22.05 (2014) and in accordance with FHWA MUTCD (2009). The roadway at the 74' Ave W and 180th St SW sites has two lanes and is a low speed area. The completion of the borings at these two locations will require a shoulder closure. We propose to implement the WDOT shoulder closure -low speed standard plan, as presented on Figure 2A and Figure 2C. Pedestrian access along the sidewalk with be maintained and no flaggers are anticipated. The roadway at the 180th St SW location has three lanes with a center turn lane. The completion of the boring at this location will require partial closure of the west bound lane with channelizing 2 HWA GeoSciences Inc. Aug 31, 2020 HWA Project No. 2020-009-21 devices used to divert west bound traffic through the center turn lane. Two-way traffic will be open throughout the drilling operation. We propose to implement a standard traffic control plan 2 lane roadway with center turn lane closed, as shown in Figure 2B Pedestrian access along the sidewalk will be rerouted to the opposite side of the roadway. No flaggers are anticipated. Notes attached to the traffic control figures provide details pertaining to the site -specific features of this project. Figures 2A through 2C show the perimeter of the proposed work and staging area for each borehole. All signage will be placed prior to entering the roadway. Spotters will be present while the drill rig moves from the staging area to the exploration site to prevent interference with pedestrians. Cones will be placed around the drill rig and work area at exploration sites to keep pedestrians a safe distance away from the work zone. If you have any questions, or require additional services, please contact the undersigned at your convenience. Sincerely, HWA GEOSCIENCES INC. Dila Saidin, PhD. `PE Senior Geotechnical Engineer Attachments: Figure 1 Vicinity Map Figure 2A-2C Proposed Boring Locations Figure 3 WSDOT Standard Plan, shoulder closure — low speed HWA GeoSciences Inc. 1776tt St-S"Al •.:. Project Site on 180" St SW Interfie .i Project Site on I . Olympia View Dr >/ QIntertie #3 • ' rn j, 0 h S W a - comb CD, 1 = lap Co i ona �'96tti-St•SW, Z Iwo 'Gaspers- ay'u _ 6LA 1 .� 00 df _Dayton ..t E +xProject> r 1 1 •• r i Ih _r am r, ` y, fr - .' '► • , r ♦ _ � � �� • . �L ow Co T ♦ • /' 208th St S.W Legend 0 Location of Temporary Traffic Control Signage Approximate Limits of Staging Area Approximate Limits of Work Area B11—� Approximate Location and Designation of the Proposed Geotechnical Boring Not to Scale N 0 0 §R` Aye Ai2v � CHANNELIZATION DEVICE SPACING feet M�11 TAPER TANGENT J'*'40 JO in BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED W14) 25 30 1 35 1 40 1 45 1 SC 1 55 6C 65 70 LENGTH (1-1) 155 200 250 3:6 360 425 4% 57C 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9.900 TO 22.000 km HOST VEHICLE WEIGHT + 22 003 15.. • 45 MPH 45-56 MPH 45 MPH 4165 hIPH > 55 MPH 150• 12Y 172' 74 107 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REOUIRED ti sA,: •. y w IL N0"I'1sS L I I WA will submit utility locates prior to drilling 2. Boring locations may be adjusted to ensure a minimum of 4 feet from all utility markings 3. All signs placed on the sidewalk will be positioned to ' ,1 ensure accessible width remains for pedestrians. 4. Traffic safety cones will be used as channelizing devices for all tapers. 5. Sign spacing will be adjusted to road limitations. 6. Hours of work: 9:OOAM — 5:OOPM. 7. Boring will be performed on asphalt pavement. 8. Protective vehicle will be utilized in the Work Area .� during operations. SIGN SPACING=X (1) RURAL ROADS 6 URBAN ARTERIALS 35140 MPH 350 a RURAL ROADS, URBAN ARTERIALS, 251 30 MPH 2C0 s (2) RBAN STREETS 25 MPH OR LESS 1CO s (2) (1) A_L SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. GEOSCIENCES INC. MINIMUM SHOULDER TAPER LENGTH = L13 (feet) SHOULDER Posted Speed (mph) AIDTH (1090 25 3C 35 40 45 50 55 W 65 70 g 40 40 6C 90 _ _ _ _ _ 0 40 60 90 00 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THFN 6 2A PROJECT NO. 2020-009-21 0 4 - :_A •I L 7r� � qb _ a � � _ [ECLOSCDNC ROAD �, , i CLOSED AHEAD WORK AHEAD 1( I s ;e Legend CHANNELI ING,1 DEVICE SPACING feet TAPFR TANGENT 3�;40 30 0 Location of Temporary Traffic Control Signagc Channelizing Devices Approximate Limits of Staging Area Approximate Limits of Work Area 4n TT . Approximate Location and Designation of — JL- the Proposed Geotechnical Boring Not to Scale N BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED WK 25 M 35 1 40 45 5C 1 55 1 BC 65 70 LENGTH (Leal) 155 2C0 250 3C6 360 425 4% 57C Bey 130 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9.900 TO 22.000 fry. HOST VEHICLE WEIGHT + 22 003 Ib% 45 MPH 45d6 MPH 45 MPH 4165 AIPH > 55 MPH 12Y 172' 74 107 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REOUIRED SIGN SPACING=X (1) RURAL ROADS 6 URBAN ARTERIALS 35 J 40 MPH 350 s RESICENTIAL 6 BUSINESS DISTRICTS 25 130 N.i'H 200 s (2) URBAN STREETS 25 MPH OR LESS 100 s (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. GEOSCIENCES INC. 44M MINIMUM SHOULDER TAPER LENGTH = L13 (feet) SHOULDER AIDTH (1090 Posted Speed (mph) 25 L 30 35 1 40 1 45 1 50 1 55 80 65 70 g• 40 t0 6C DO 0 40 60 90 Op USE A 3 DEVICES TAPER FOR SHOULDERS LESS THFN 6 2B PROJECT NO. 2020-009-21 �R•C`� a' Legend 0 Location of Temporary Traffic Control Signage Approximate Limits of Staging Area Approximate Limits of Work Area n TT . Approximate Location and Designation of s-- the Proposed Geotechnical Boring Not to Scale N I V 4- 0 all CHANNELIZATION DEVICE SPACING feet 4f�11 TAPER TANGENT 3a40 30 BUFFER DATA LONGITUDINAL BUFFER SPACE = 8 SPEED W14) 25 30 1 35 1 40 1 45 1 SC 55 6C 65 70 LE14GTH (1-1) 155 200 250 306 360 425 495 57C 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22.000 km HOST VEHICLE WEIGHT + 22 003 15.. . 45 MPH 45d6 MPH 5 45 MPH 4165 hIPH > 55 MPH 100' 12Y 172' P 74 100' 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REOUIRED SIGN SPACING=X (1) RURAL ROADS 6 URBAN ARTERIALS 35140 MPH 350 a RURAL ROADS, URBAN ARTERIALS,rgIC 251 30 MPH 2C0 s (2) RBAN STREETS 25 MPH OR LESS 1C0 s (2) (1) A-L SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. GEOSCIENCES INC. NOTES 1. HWA will submit utility locates prior to drilling 2. Boring locations may be adjusted to ensure a minimum of 4 feet from all utility markings 3. All signs placed on the sidewalk will be positioned to ensure accessible width remains for pedestrians. 4. Traffic safety cones will be used as channelizing devices for all tapers. 5. Sign spacing will be adjusted to road limitations. 6. Hours of work: 9:OOAM — 5:OOPM. 7. Only one boring location will be traffic controlled at on time. 8. Borings will be performed on asphalt pavement. 9. Protective vehicle will be utilized in the Work Area during operations. MINIMUM SHOULDER TAPER LENGTH = L13 (feet) SHOULDER AIDTH (1090 Posted Speed (mph) 25 3C 35 40 45 50 55 W 65 70 g 40 40 6C 90 0 40 60 90 00 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THFN 6 TRAFFIC CONTROL PLAN — IT04 2 C EDMONDS PHASE 11 V 2 PROJECT NO. 2020-009-21 WATERLINE REPLACEMENT PROJECT SIGN SPACING = X (1) R.,RAL ROADS 6 WWII ARTE94ALS )S )40 MPH W& R„RAl RODS. LitM\ A4TTRKS. ,-5 i )D MPH XCL M RESIDENTIAL ♦ B.uhLSS DISTRICTS Lq6" STR)ETS 75, UP01 OR LESS 100i (T)ALL SPACING NAY OF ADJUSTED TO AOCOMWOOATE INTERSECTIONS AND DWVCA9IYS. (2: THIS SPACING FAAv BE REDUCED IN L.RLN AREAS TO FIT �, �4nrolr CCNDMONS. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. LEGEND N TEMPORARv SrN LOCATION O C-IANNEUZIAG DEVICES ® PROTLCTIVE VLIICLL n FF Pip er MINIMUM SHOULDER TAPER LENGTH = U7 (feet) SHOULDER Poet" Speed (mph) 4,1 a 60 - r 40 00 w 90 1,5E A ) DEVICES TAPER FOR SN0ULrE45 :ESS -1.E\ tK OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 15 40 4', 50 S5 60 6S 7C LENGTH (se0 -55 1 200 1 250 1 305 I MO I 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEIIICLE V%E GHT 9.900 TO 22.000 tat HOST VEHICLE WEIGHT > 22.000 Ib& < 45 MPH 45-65 MPH - 55 %IPH < 45 MPH 45-65 MPH > 55 MPH 100' 123' 172 74' 10C ISO PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED a a O 0 � � T tItIDRK AREA ° o X R l/1 It R ( f0' �e ROAD WORK AHEAD 441 SHOULDER �WORK \V/ N'21.5 SHOULDER CLOSURE -LOW SPEED (40 MPH OR LESS) NOT TO SCALE YA . UM S;wM 140 Vni w L«,(.TC.%~ FFOAP PROJ,NO. CHANNELIZATION DEVICE SPACING (feet VI^1 IAI'l4 IANGI NI )spec x r ;vN I m t ENGINEERING DIVISION APPROVED AS NOTED NGriggs 09/04/2020 NOTES 1. DEVICE SPACING FOR THE 30ANSTREAM TAPER SMALL BE 2_';F T). 7. All SIGNS ARF BLACK ON ORANGE. w MAW '%Y:shlnp'on State Dcpa1rr'c-i: of Tra^.po-L:tlon FIGURE 3 Tc5 TRAFFIC CONTROL PLAN