Loading...
2019-0705 Schwarz4 OF EDP O �sr. 1 ggo DATE: TO: FROM: RE: Citv of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 September 30, 2019 Cedric Ruter Donovan Akan, Plans Examiner Plan Check: BLD2019-0705 Project Address: 18606 Sound view Place Scope: Replace and add two (2) decks and one (1) new storage area Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: S2.0 S2.1: S2.2 S3.0: S3.1: 1. Sheets S2.0, S2.1, S2.2, S3.0 and S3.lrequire clarifications/corrections. 2. The foundation for the remaining deck is not clearly identified on the plans. Provide details/ calculations for the foundation for the deck. 3. The second storage appears to still be part of the scope of work for this project. Please correct/clarify/omit this structure if it is still part of the scope of work to be done. 4. The foundation for the proposed deck appears to be still part of the proposed storage foundation. Is the same foundation that is/was being used for the new storage area still being used for the deck that is still to remain? Clarify/correct the foundation to the deck that is to remain as part of this project. Provide corrections/details for the foundation to be constructed for portion of the deck that is affected with the omission of the storage for this project. 5. Please omit the storage from this sheet if it is no longer part of the scope of work for this project. 6. Detail bug 3/S3.1 and 4/S3.1 shows that this is still a component of the omitted structure of this project. Clarify/correct or omit this please. 7. Detail 7 shows that there is a wall being constructed/attached to the foundation. If this foundation is part of the design please correct the detail so that it reflects the work that is being done. 8. Details 3 and 4? Please remove theses from the plans if is no longer part of the scope of work. 9. Detail 8 is called out on sheet 2.0. Please provide the detail that is missing on this sheet. 10. Detail 11. To meet section 1607.8.1.1 and 1607.8.1.2 of the 2015 IBC. Identify this on the plans so that the proposed lattice screen meets the intent of the code. Summary: As noted in comments above the removal/omission of the second storage has affected the deck that appears to be still part of the scope of work for this project. Please have the Engineer of record and Architect of record make the corrections to the plans so that it is clear as to the foundation, beams, connection points, bearing points are addressed. Upon review of the resubmitted documents, additional comments may be generated. If you have any questions please contact me. Sincerely, Donovan Akan Page 2 of 2