Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NU of Edmonds EdmondsCity 98020BLD2020-11218 wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: KAYLA NICHOLS Status: ISSUED Subtype: NEW SINGLE FAMILY Parcel No: 00619400400600 Site Address: 1055 7TH AVE S LOT 1 EDMONDS,WA 98020-4015 Applied: 10/21/2020 Subdivision: 006194 Lot: 0 Issued: 1/20/2021 Fire Sprinklers: Yes Lot Area: 7513 Zoning: RS-6 Final: Valuation: $410,926.56 Occupancy Type: R3 Construction Type: VB Expiration Date: 1/15/2022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: SELECT HOMES- NEW SFR P&M INCL *** LOT 1*** WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KAYLA NICHOLS 16531 13TH AVE W STE. A107, (425)742-6044 KAYLA.CLARK@OUTLOOK.COM LYNNWOOD WA 98037 CONTACT SELECT HOMES, INC. 16531 13TH AVE W STE. A107, (425)742-6044 kayla.clark@outlook.com LYNNWOOD WA 98037 CONTRACTOR SELECT HOMES INC 16531 13TH AVE W A 107, (425)742-6044 kayla.clark@outlook.com LYNNWOOD WA 98037 OWNER SELECT HOMES, INC. 16531 13TH AVE W SUITE A107, (425)742-6044 LYNNWOOD WA 98037 7PERMDESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # ASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 1/20/21 R9746 ITS 1- BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 1/20/21 R9746 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 1/20/21 R9746 PUMP - 1.75 BTU OR LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/20/21 R9746 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $225.00 $225.00 1/20/21 R9746 TRAP EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $30.00 $30.00 1/20/21 R9746 SYTEM ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $880.00 $880.00 1/20/21 R9746 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $90.00 $90.00 1/20/21 R9746 FURNACE OR FIREPLACE 001.000.322.10.000.00 $90.00 $90.00 1/20/21 R9746 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 1/20/21 R9746 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,966.00 $2,966.00 1/20/21 R9746 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $2,521.10 $2,521.10 10/27/20 R8314 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 1/20/21 R9746 Printed: Wednesday, January 20, 2021 11:34:14 AM 1 of 4 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $130.00 $130.00 1/20/21 R9746 FEE WATER HEATER - TANKLESS 001.000.322.10.000.00 $15.00 $15.00 1/20/21 R9746 TOTALS: $7,173.60 $7,173.60 CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS FOR arising directly or indirectly from the issuance for this permit. Issuance of this permit shall INFORMATION not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision.\r\r HOSE BIBBS O Hose Bibbs are required to have a permanently affixed anti -siphon device installed. ORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION Printed: Wednesday, January 20, 2021 11:34:14 AM 2 of 4 'SIDENTIAL BLDG Permit PERMIT NU of Edmonds EdmondsCity 98020D2020-11218 ww.edmondswa.gov• Installation, use and maintenance of equipment and components shall be per FOR MANUFACTURER SPECS manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These FOR MAXIMUM HEIGHT items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. FOR SEWER 10' SEPARATION INFORMATION FOR STORM COVENANT A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. FOR Type B or L vent connectors required on fuel burning appliances passing through VENT CONNECTORS INFORMATION unheated spaces. Installer shall provide the manufacturer installation, operating instructions, and a whole FOR WHOLE HOUSE FAN house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". • -. M Mill! • •- • i • •'- • COMPLETED SEQID INSPECTION TYPE INSPECTOR DATE A-1 BUILDING PRECON B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 EXTERIOR INSULATION B-3 GAS PIPING TEST B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-3 REFR LINE TEST B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE Printed: Wednesday, January 20, 2021 11:34:14 AM 3 of 4 RESIDENTIAL BLDG PermitCity NUMBERPERMIT • • • • Edmonds98020BLD2020-1128 www.edmondswa.gov E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-4 STRM STUB CONNECT E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-9 COMPOST AMEND X-2 ENGINEERING FINAL Printed: Wednesday, January 20, 2021 11:34:14 AM 4 of 4