Building Permit 2020Permit
PERMIT NU
City of Edmonds
EdmondsFENCE
•:• •BLD2020-03415
iL
www.edmondswa.gov • •
Type: FENCE
Owner/ Business: LI YAN & WANG SHENGPEI/WANG ZIFU
Status: ISSUED
Subtype: RESIDENTIAL FENCE
Parcel No: 00594400002500 Site Address: 8711 TALBOT RD EDMONDS,WA 98026-5049
Applied: 4/20/2020
Subdivision: 005944
Lot: 0
Issued: 6/17/2020
Fire Sprinklers: Lot
Area: Zoning: RS-20
Final:
Valuation: $0.00 Occupancy Type: Construction Type:
Expiration Date: 12/19/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: WAC
Scope of Work: WANG-FENCE AND GATE
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS PHONE
EMAIL
LI YAN & WANG
8711 TALBOT RD, EDMONDS WA
APPLICANT
SHENGPEI/WANG ZIFU 98026-5049
AUTOMATED GATE
AND 10847 E. MARGINAL WAY 5
CONTRACTOR
EQUIPMENT CO.
SEATTLE WA98168
LI YAN & WANG
8711 TALBOT RD, EDMONDS WA
OWNER
SHENGPEI/WANG ZIFU 98026-5049
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/28/20
R4985
PER PERMIT
FENCE - SUB RES BLDG PERMIT FEE
001.000.322.10.000.00
$35.00
$35.00
4/28/20
R4985
FENCE - SUB RES ENG INSP FEE
001.000.341.82.000.00
$35.00
$35.00
4/28/20
R4985
FENCE - SUB RES ENG REVIEW FEE
001.000.341.82.000.00
$30.00
$30.00
4/28/20
R4985
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
4/28/20
R4985
TOTALS: $146.50 $146.50
CONDITIONS
CONDITION TYPE
STATUS NOTES
Printed: Wednesday, June 17, 2020 9:15:31 AM 1 of 2
FENCE Permit
PERMIT NUM -
City of • • •
1 1 1
•:i0&
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
ALL BUILDING PERMITS
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from
construction sites/activities must comply with the noise limits of Chapter 5.30, unless a
variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a
project or final occupancy approval must be granted by the Building Official prior to use
or occupancy of the building or structure. Check the job card for all required City
inspections including final project approval and final occupancy inspections.
Work approved under this permit may or may not qualify as an essential or allowed
activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the
FOR
Citys website for up-to-date information related to development activities during COVID-
COVID-19 NOTICE
INFORMATION
19. Issuance of this permit does not certify that construction is allowed to immediately
occur, and inspections may or may not be granted accordingly. Construction activities and
all required inspections will resume when the Order has been lifted.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS - Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
X-2 ENGINEERING FINAL"
E-4 FENCE LOCATION
Printed: Wednesday, June 17, 2020 9:15:31 AM 2 of 2