Loading...
Building Permit 2020Permit PERMIT NU City of Edmonds EdmondsFENCE •:• •BLD2020-03415 iL www.edmondswa.gov • • Type: FENCE Owner/ Business: LI YAN & WANG SHENGPEI/WANG ZIFU Status: ISSUED Subtype: RESIDENTIAL FENCE Parcel No: 00594400002500 Site Address: 8711 TALBOT RD EDMONDS,WA 98026-5049 Applied: 4/20/2020 Subdivision: 005944 Lot: 0 Issued: 6/17/2020 Fire Sprinklers: Lot Area: Zoning: RS-20 Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 12/19/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: WANG-FENCE AND GATE WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL LI YAN & WANG 8711 TALBOT RD, EDMONDS WA APPLICANT SHENGPEI/WANG ZIFU 98026-5049 AUTOMATED GATE AND 10847 E. MARGINAL WAY 5 CONTRACTOR EQUIPMENT CO. SEATTLE WA98168 LI YAN & WANG 8711 TALBOT RD, EDMONDS WA OWNER SHENGPEI/WANG ZIFU 98026-5049 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/28/20 R4985 PER PERMIT FENCE - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $35.00 $35.00 4/28/20 R4985 FENCE - SUB RES ENG INSP FEE 001.000.341.82.000.00 $35.00 $35.00 4/28/20 R4985 FENCE - SUB RES ENG REVIEW FEE 001.000.341.82.000.00 $30.00 $30.00 4/28/20 R4985 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/28/20 R4985 TOTALS: $146.50 $146.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, June 17, 2020 9:15:31 AM 1 of 2 FENCE Permit PERMIT NUM - City of • • • 1 1 1 •:i0& www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Work approved under this permit may or may not qualify as an essential or allowed activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the FOR Citys website for up-to-date information related to development activities during COVID- COVID-19 NOTICE INFORMATION 19. Issuance of this permit does not certify that construction is allowed to immediately occur, and inspections may or may not be granted accordingly. Construction activities and all required inspections will resume when the Order has been lifted. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-2 ENGINEERING FINAL" E-4 FENCE LOCATION Printed: Wednesday, June 17, 2020 9:15:31 AM 2 of 2