Loading...
FULL PLANS-FENCE MUST BE ON PRIVATE PR -PROPERTY OWNER RESPONSIBL LINES -FENCE SHALL NOT ENCLOSE OR MAINTAINED UTILITIES FOR DETERMINING PROPERTY OWNER/CONT ACTOR RESPONSIBLUOR LOCATI ALL ON SITE U ILITIES. R OCATION/RE SION TO 2EVENT ACCESS TO ANY CITY UTILITIES MAY RE IRE A SEPERATE MIT. unl IQC FREE EXIT LOOP SHADOW LOOP 22'-5" BETWEEN POSTS4�/// o - REVERSE LOOP ENTRY SYSTEM ENGINEERING DIVISION APPROVED AS NOTED JdJ Ul ass.r u 00/17/2020 VV A GATE SITE Al SCALE 3/32" = V-0" APPROVED BY ppPLANNING Jun 12 2020 1-40r 7y_11111r i i 16'-6" BETWEEN POSTS City Of Edmonds Building Department Work Address Owner Approved Date Building Official Permit Number RESUB Jun 11 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER. TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED. JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: WIII PAGE: A 1 Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com iN 10' B ENTRY SYSTEM & KNOX BOX SEAM CONTROL CABINET OPERATOR / cn m m 4' 4'-2" o m r ——_ 0 � \ O D` to O w �z G° w N w w m \ O0 RESUB Jun 11 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A 22' GATE PLAN A2 SCALE 3/16" = V-0" FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER. TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED. JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: Will PAGE: A2 Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com 271" BETWEEN POSTS CONTROL - CABINET 3/4" SQ PICKETS r (INSIDE) 1" X 2" CHANNEL i in . Ai♦1f li Z I 5 Z) w O Ln co �00 LO t j -I (O M CONCRETE FOOTING /�30" SQ7/ A 22' GATE ELEVATION A3 SCALE 3/8" = V-0" 5 1 /8" GAP OPERATOR INSIDE DRIVEWAY TYPED r COLUMN CAP SPEARHEAD-)il L - 24" X 24" SQ COLUMN SPEARHEAD DETAIL — MAGLOCK TYPE D PYRAMID CAP SPEARHEAD, CARRIAGE LIGHT (BY OTHERS) 24" x 24" COLUMN TO BE FILLED WITH CONCRETE FOR STABILITY. (BY OTHERS) 4" SQ POST lI�IIIIIII_�I�I_I� � ; 2" SQ FRAME 5/8" ANCHOR RESUB Jun 11 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER. TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED. ,�U �]���� ®m g m =f@ ® is m JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: WIII PAGE: 3 Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com RESUB Jun 11 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A 16' GATE PLAN A4 SCALE 3/8" = V-0" FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER. TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED. JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: Will PAGE: /' 4 Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com 24" x 24" COLUMN TO BE FILLED WITH CONCRETE FOR STABILITY. (BY OTHERS) x z J O U 1/4"THK X 6"H X 4" W STOP -` I L J CARRIAGE LIGHT (BY OTHERS) A 16' GATE ELEVATION A5 SCALE 3/8" = V-0" PYRAMID CAP TYPE D SPEARHEAD 5 1 /8" GAP 16'-6" BETWEEN COLUMNS 3/4" SQ PICKETS . A T 1 M 0 4" GAP 2" SQ FRAME--/ DRIVEWAY -DROP BOLT INSIDE 1" X 2" CHANNEL 4" SQ POST z - J v p N v I � J 5/8" ANCHOR c) CONCRETE FOOTING ° ° ° R SU B 30" SQ 1 1 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER. TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED. ==<N= 0gff1 �]� �t =D­ ®m m m ® Is m 19 1 JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: WIII Automated Gates & Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 PAGE: A5 www.aegates.com