FULL PLANS-FENCE MUST BE ON PRIVATE PR
-PROPERTY OWNER RESPONSIBL
LINES
-FENCE SHALL NOT ENCLOSE OR
MAINTAINED UTILITIES
FOR DETERMINING PROPERTY OWNER/CONT ACTOR RESPONSIBLUOR LOCATI
ALL ON SITE U ILITIES. R OCATION/RE SION TO
2EVENT ACCESS TO ANY CITY UTILITIES MAY RE IRE A SEPERATE MIT.
unl IQC
FREE EXIT LOOP
SHADOW LOOP
22'-5"
BETWEEN POSTS4�///
o
- REVERSE LOOP
ENTRY SYSTEM
ENGINEERING DIVISION
APPROVED AS NOTED
JdJ Ul ass.r u 00/17/2020
VV
A GATE SITE
Al SCALE 3/32" = V-0"
APPROVED BY ppPLANNING
Jun 12 2020
1-40r 7y_11111r
i
i
16'-6"
BETWEEN POSTS
City Of Edmonds
Building Department
Work
Address
Owner
Approved Date
Building Official
Permit Number
RESUB
Jun 11 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER.
TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED.
JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: WIII PAGE: A 1
Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com
iN 10'
B
ENTRY SYSTEM
& KNOX BOX SEAM
CONTROL CABINET
OPERATOR /
cn
m
m
4'
4'-2"
o
m
r
——_
0
�
\
O
D`
to
O
w
�z
G° w
N w
w
m
\
O0
RESUB
Jun 11 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
A 22' GATE PLAN
A2 SCALE 3/16" = V-0"
FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER.
TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED.
JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: Will PAGE: A2
Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com
271" BETWEEN POSTS
CONTROL -
CABINET 3/4" SQ PICKETS r
(INSIDE)
1" X 2" CHANNEL i
in . Ai♦1f li
Z I
5
Z) w
O
Ln co
�00
LO
t j -I
(O
M
CONCRETE
FOOTING
/�30" SQ7/
A 22' GATE ELEVATION
A3 SCALE 3/8" = V-0"
5 1 /8"
GAP
OPERATOR INSIDE
DRIVEWAY
TYPED r COLUMN CAP
SPEARHEAD-)il L -
24" X 24" SQ
COLUMN
SPEARHEAD DETAIL
— MAGLOCK
TYPE D PYRAMID CAP
SPEARHEAD,
CARRIAGE LIGHT
(BY OTHERS)
24" x 24" COLUMN
TO BE FILLED WITH
CONCRETE FOR
STABILITY.
(BY OTHERS)
4" SQ POST
lI�IIIIIII_�I�I_I�
�
;
2" SQ FRAME
5/8" ANCHOR
RESUB
Jun 11 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER.
TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED.
,�U �]����
®m g m =f@ ® is m
JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: WIII PAGE: 3
Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com
RESUB
Jun 11 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
A 16' GATE PLAN
A4 SCALE 3/8" = V-0" FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER.
TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED.
JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: Will PAGE: /' 4
Automated Gates &Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077 www.aegates.com
24" x 24" COLUMN
TO BE FILLED WITH
CONCRETE FOR
STABILITY.
(BY OTHERS)
x
z
J
O
U
1/4"THK X
6"H X 4" W
STOP -` I
L J
CARRIAGE LIGHT
(BY OTHERS)
A 16' GATE ELEVATION
A5 SCALE 3/8" = V-0"
PYRAMID CAP
TYPE D
SPEARHEAD
5 1 /8"
GAP
16'-6" BETWEEN COLUMNS
3/4" SQ PICKETS
. A T 1
M
0
4" GAP 2" SQ FRAME--/
DRIVEWAY
-DROP BOLT INSIDE
1" X 2" CHANNEL
4" SQ POST
z
-
J
v
p
N
v
I �
J
5/8" ANCHOR
c)
CONCRETE FOOTING ° ° °
R SU B
30" SQ 1 1 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
FINISH: ALL STEEL PARTS TO BE SEMI -GLOSS BLACK POLYURETHANE OVER EPDXY PRIMER.
TOLERANCE: ALL "GAPS" TO BE ±1/2". ALL OTHER DIMENSIONS ±1/4" UNLESS NOTED.
==<N= 0gff1 �]� �t =D
®m m m ® Is m 19 1
JOB NAME: Wang Gate DATE: 1-15-20 REVISED: 5-15-20 DRAWN BY: WIII
Automated Gates & Equipment Co. 10847 E. Marginal Way So., Seattle, WA. 98168 PH 2O6-767-9080 FX 206-767-9077
PAGE: A5
www.aegates.com