Loading...
BLD2020-1221+City_Application+11.7.2020_4.35.03_PMBUILDING PERMIT APPLICATION Development Services Building Division 121 5th Ave N / Edmonds, WA 98020 425.771.0220 For handouts, submittal requirements go to: www.edmondswa.gov. To apply for permits, schedule inspections, or check application status go to: www.mvbuildingpermit.com JOB SITE INFORMATION/LOCATION: (Where the work is taking place) Job Site Address: 18105 Sunset Way, 98026 Parcel: 27041800203500 Lot /Unit/Suite #: Subdivision: BUSINESS OR PROPERTY OWNER: Name: Anthony & Sid Shapiro Mailing Address: 18105 Sunset Way City/State/Zip: Edmonds, WA 98026 Phone #: 425 778 5400 Email: tonys@adshapiro.com OWNER INSTALLATION: *If yes, read and sign* Will work be performed by the property owner? �✓ Yes No I own, reside in, or will reside in the completed structure. This installation is being made on property that I own which is not intended for sale, lease, rent, or exchange according to RCW 18.27.090. Owner Signature: APPLICANT / CONTACT INFORMATION: Name of Applicant: AD Shapiro Architects Mailing Address: PO BOX 0054 City/State/Zip: Edmonds, WA 98020-0054 Phone #: 425 778 5400 E-mail: tonys@adshapiro.com GENERAL CONTRACTOR: (If different from applicant) General Contractor: Mailing Address:_ City/State/Zip: Phone #: E-mail: STATE UBI #: CITY OF EDMONDS BUSINESS LICENSE #: WA STATE CONTRACTOR L & I #: (CCB) & EXPIRATION DATE: Office Use Only TYPE OF PERMIT (Provide Details on Page 2) ✓ Accessory Structure/ Addition Detached Garage Demolition Mechanical New Single Family/Duplex Plumbing Fire Sprinkler ❑ Remodel New Commercial/Mixed Use Re -Roof ❑ Signs ❑ Tank ❑ Tenant Improvement ❑ Other Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the work indicated on this application. Valuation: PROPOSED NEW SQUARE FOOTAGE FORTH IS APPLICATION Basement scl ft: Finished❑ Unfinished ❑ 1st Floor, scl ft: 0 2nd Floor, soft: 0 Garage/Carport:, scl ft: 0 Deck/Covered Porch/Patio: 0 # of NEW Bedrooms: 0 # of NEW Bathrooms: 0 PROJECT Modify existing finished basement, (except for GWB on two furred walls), and combine with existing bedroom and bathroom to create an ADU with existing exterior door to the backyard walkway. See attached scope of work I certify that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: Anthony D. Shapiro Signature: Date 11/06/20 GENERAL COMMERCIAL DATA Occupancy Group(s): Occupant Load(s): Type(s) of Construction: Fire Sprinklers: Yes El No� WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSEC forms. DEFERRED SUBMITTALS: All commercial building permits that will require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet EQUIPMENTMECHANICAL • BTUs Gas / Elec / Other Qty A/C Unit /Compressor Air Handler/VAV Boiler Dryer Duct Exhaust Fans Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provide eleva- tions if a Commercial Bldg) Other: COUNTSPLUMBING FIXTURE piped) Qty Qty Clothes Washer 1 Tub/ Showers Dishwasher 1 Backflow Device (RPBA, DCDA, AVB) Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Bibs Water Heater - Tankless? Y or N Hydronic Heat Water Service Line Sinks 1 Other: Toilets Other: GAS/FUEL CONNECTION COUNTS (New, Relocated or re piped) BTUs Qty BTUs Qty A/C Unit Outdoor BBQ/ Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert Other: Furnace Other: COUNTSMEDICAL GAS, AIR VACUUM Relocated or re piped) Qty Qty Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical - Surgical Vacuum Other: DEMOLITION Type of structure to be demolished: Square footage of structure to be demolished: AHERA Survey done? Y❑/ N❑ PSCAA Case #: Critical Areas Determination: Study Required ❑ Conditional Waiver ❑ Waiver❑ Fill in Place ❑ Fill Material: Removal ❑ Size of Tank (Gallons) Critical Areas Determination: Study Required Conditional Waiver Waiver .D Grading: Cut_ cubic yards Fill cubic yards Cut / Fill in Critical Area: Yes ❑ No ❑ GENERAL PROVISIONS APPLICATIONS: Applications are valid for a maximum of 1 year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed with Washington State Department of Labor & Industries and have a current City of Edmonds Business License. architects pS 18105 Sunset Way, PO Box 0054, Edmonds, WA 98020-0054 425.778.5400 November 06, 2020 Building Department City Edmonds Edmonds, WA 98020 Subject: Shapiro Residence ADU Scope of work Address: 18105 Sunset Way, Edmonds, WA 98026 ADU Scope of work for Building Permit: Existing four bedroom basement to be modified to accommodate accessory dwelling unit: Installation of venting for: a. Ventilation of small laundry closet, housing a stacked washer dryer will be tied to existing bathroom venting serving the two lower floor bathrooms. b. Range oven. C. Dryer Vent Modification to existing drainage plumbing initially configured for media room: a. extend hot/cold plumbing into washer dryer closet b. extend hot water line to dishwasher location C. (Kitchen sink to utilize existing hot cold water and drainage system installed for media room during initial construction of house). Electrical modifications: a. Provide circuits for new kitchen area. b. existing circuits serving old media area will be utilized for the living and dining room. C. Add new candle lights for laundry kitchen and dining area. d. existing sub panel to have partial separation of existing circuits to be relocated into basement area still attached to the house. existing subpanel to stay in this location to serve as the new panel for the ADU. Existing in floor heating, with separate zoning for ADU will not be modified. Existing bedroom to be utilized as bedroom for ADU, no modifications necessary. Existing bathroom to be utilized for ADU, no modifications necessary. New window installed in South wall for living area of ADU. this change necessitated saw cutting of existing concrete wall and installation of new windows.