Loading...
SI Final letter- ANCHORSFINAL LETTER REPORT Report Number: M7211194.0002 Service Date: 06/22/21 Report Date: 06/30/21 Client Gateway Construction Services Attn: Ashlee Solomon 5506 6th Ave S, Ste 210 Seattle, WA 98108 City of Edmonds Building Department 121 5th Ave. N Edmonds, WA 98020 MAYES lferracon 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project TR International 22815 102nd PI W Edmonds, WA Project No.: M7211194 Final Letter Permit No: BLD2021-0220 This is to advise you that registered special inspections have been completed for the project referenced above per our reports, copies of which have been sent to you. Special inspection was provided for: • Post -Installed Anchors. To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform to, the City -approved drawings or Engineer -approved changes. We trust this provides you with the information you require. Should you have any questions, please contact us at 425-742-9360. Services: Project management Mayes/Terracon Rep.: Barry Tuttle Reported to: Contractor: Report Distribution: (1) Gateway Construction Services, (1) Burgess Design Group, Meghan Solomon (Cox) White (1) City (1) City of Edmonds WA, Leif Bjorback (1) Gateway Construction Services, Reviewed By: Chris Perrigo — (1) Mayes Testing Engineers, Inc, (1) TR International Inc, Beth Tragus- Heath Defoor, PE Barry Tuttle Campbell Office Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusiveiy for fhe use of fhe client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.10 Page 1 of 1