Loading...
ENG2021-0528 ROW PERMITOF WAY EUC PERMIT PERMIT NUMBER City of Edmonds EdmondsRIGHT 121 IL 98020 1 1 www.cityofedmonds.gov Description: PUD REPLACING EQUIPMENT ON POLE FOR T-MOBILE ISSUED: 01/24/2022 Address: 9726 EDMONDS WAY EDMONDS WA 98020-5940 EXPIRES: 07/24/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434500000100 NAME TYPE NAME ADDRESS PHONE APPLICANT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER BERSCHAUER WALTER & DIANNE 19934 NW HOOD POINT RD, SEABECK WA 98380 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $0.00 RIGHT OF WAY STANDARD - WIRELESS PERMIT FEE $330.00 $330.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 01 /24/2022 :»•>/F9:1H ]1 DATE Printed: Monday, January 24, 2022 2:04:09 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • Edmonds•:• •ENG2021-0528 31 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. L 11111 0 INSPECTION TYPE DATE RESULT NOTES COMPLETE E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" A-1 JOB START Printed: Monday, January 24, 2022 2:04:09 PM 2 of 2 WO# 100088972 ofE°M0tio� RECEIVED RIGHT OF WAY CONSTRUCTION DEC 22 2021 PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS is') Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name T-Mobile Edmonds Way Modification 2022 Site Address or if no site address use Property Address at NW corner of project area: 9720 Edmonds Way Edmonds, WA Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Snohomish County PLID No.1 Franchise Ordinance No: N/A Point of Contact Aziz Haq Title Transmission Engineer Address P.O. Box 1107 City Everett State WA zip 98206 Phone 425-783-5251 Email Jointuse@snopud.com Contractor and Authorized Agent of Owner Name of Company Same info as above (see note below) Contractor Contacts During Construction Primary Name Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 9 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ix Traffic Control Only (no associated development) R Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Work will consists of replacing all pole mounted cell site equipment on the pole top. This work will require two large bucket trucks to be setup in the right of way to lift material and land it on the pole. A lane closure shall be required in order to accommodate the trucks. A double lane closure may end up being necessary depending on whether or not a crane is deemed necessary and if local customers will let us utilize their parking lot(s). Ideal work hours would be 8AM to 5PM to utilize daylight. The project shall take roughly 5 to 7 days to complete depending on work hours and weather conditions. We will do our best to work with landlords to utilize parking lots and minimize impacts in the right of way. No tree trimming needed. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable �a power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes X No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility stem? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the X project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. _ APPLICANT SIGNATURE: APPLICANT PRINTED NAME: AZIZ HAQ APPLICANT TITLE: ENGINEER NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 12/21 /21 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM LANE CLOSURE ON A MULTI -LANE ROAD Q (V J N NORTH (OPTIONAL) SIGN SPACING = X FREEWAYS & EXPRESSWAYS 55-70 MPH 1500'± RURAL HIGHWAYS 60-65 MPH 800'± RURAL ROADS 45-55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS 25-30 MPH 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. NOTIFY WSDOT 48 TO 72 HOURS PRIOR TO START OF WORK. CONTACT BONIE NAU AT 206-440-4471. WORK HOURS - OFF PEAK ONLY M-F 9 AM TO 3.30 PM NO FEDERAL HOLIDAYS SCHEDULE TRAFFIC CONTROL INSPECTION FOR ALL DAYS ON SITE LIGHTED ARROW BOARD REQUIRED x W1-4L i (V J x RIGHT i LANE W20-5R CLOSED x AHEAD ROAD i WORK AHEAD W20-1 MINIMUM LANE CLOSURE TAPER LENGTH = L (FEET) LANE WIDTH POSTED SPEED (MPH) (FEET) 25 30 35 40 45 1 50 55 60 65 70 10 105 150 205 270 450 500 550 - - - 11 115 165 225 295 495 550 605 660 - - 12 125 180 245 320 540 600 660 720 780 840 ENGINEERING DIVISION ...,7TED p( I (j_2V 11 /21 /2022 REVIEWED FOR TRAFFIC CONTROL ONLY. SEE WIRELESS ROW PERMIT ENG2021-0140 TABLE 1 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE RECEIVED DEC 22 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50-70 40 80 35-45 30 60 25-30 20 40 GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES (OPTIONAL). 3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK. 5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1 FOR SPACING DISTANCES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE INTERSECTIONS AND/OR DRIVEWAYS. BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 1 25 1 30 1 35 40 45 1 50 1 55 60 1 65 1 70 LENGTH (FEET)l 155 1 200 1 250 305 360 1 425 1 495 570 1 645 1 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 LBS. HOST VEHICLE WEIGHT > 22,000 LBS. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPHI > 55 MPH 100' 1 123' 1 172' 74' 1 100' 1 150' LEGEND CHANNELIZING DEVICE PORTABLE SIGN AND SUPPORT WORK VEHICLE WITH FLASHING LIGHT WORK AREA DOUBLE LANE W20-1 R Wo AHEAD CENTER X W20-5MOD LANE CLOSED AHEAD X N J (OPTIONAL) (OPTIONAL) = (OPTIONAL) CLOSURE ON MULTI -LANE ROAD SIGN SPACING = X FREEWAYS & EXPRESSWAYS 55-70 MPH 1500'± RURAL HIGHWAYS 60-65 MPH 800'± RURAL ROADS 45-55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS 25-30 MPH 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. o— )_ I — * W4-2L cD ZCL o W .. a� LIGHTED ARROW BOARD REQUIRED I V4-2L RECEIVED RIGHT TWO LANE DEC 22 2021 CLOSED W20-501 AHEAD ROAD CITY OF EDMONDS WORK v20-1 DEVELOPMENT AHEAD SERVICES DEPARTMENT GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES (OPTIONAL). 3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK. 5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1 FOR SPACING DISTANCES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE INTERSECTIONS AND/OR DRIVEWAYS. BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 1 25 1 30 1 35 40 45 50 55 60 65 70 LENGTH (FEET)l 155 1 200 1 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 LBS. HOST VEHICLE WEIGHT > 22,000 LBS. < 45 MPH 45-55 MPHI > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100' 1 123' 1 172' 74' 1 100' 1 150' TABLE 1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50-70 40 80 35-45 30 60 25-30 20 40 • CHANNELIZING DEVICE i PORTABLE SIGN AND SUPPORT �® WORK VEHICLE WITH FLASHING LIGHT WORK AREA MINIMUM LANE CLOSURE TAPER LENGTH = L (FEET) LANE WIDTH POSTED SPEED (MPH) (FEET) 25 30 35 40 451 50 55 60 65 70 10 105 150 205 270 450 500 550 - - - 11 115 165 225 295 495 550 605 660 - - 12 125 180 245 320 540 600 660 720 780 840 T-MOBILE EDMONDS WAY - SE01632A EF:DaoMD 1818 Rev.4/19 CONSTRUCTION OPERATIONS AND ENGINEERING REQUEST TO FROM DATE KEITH ELLSION AZIZ HAQ 425-319-4209 12/21/21 ADDRESS/LOCATION/POLE NUMBER 9720 EDMONDS WAY EDMONDS, WA // 36(27-3)NE // PLI: 157911 MAP NO. ORDER NO. OPERATION NO. 474-G1 100088972 30 ACTION• PLEASE ASSIST T-MOBILE WITH THE MODIFICATION OF THEIR ANTENNA SITE MOD INCLUDES REPLACING ALL POLE MOUNTED EQUIPMENT AND INSTALLING NEW CABLING ANTENNA TIP HEIGHT: 74.5' AGL COORDINATE WITH KEITH ELWELL - 425-753-3458 EQUIPMENT WEIGHTS ON T-MOBILE DRAWING A-3: - AHLOA RADIO:84 LBS. - AHFIG RADIO: 80 LBS. - AEHC ANTENNA: 108 LBS. 231 265034 - OCTO ANTENNA: 125 LBS. �7 7 A-48905 C-1544 75-400949 801 E-52393 ___--------- 231 EDMONDSWY ENGINEERING DIVISION "'7TED E'o 11-11-1 00 - 1 i 1 /21 /2022 o6_ FU40 FU40 _6 REVIEWED FOR TRAFFIC CONTROL ONLY. SEE WIRELESS 2005 P 157911 -45130 ROW PERMIT ENG2021-0140 SW 12-4329 FU40 SL-112 268745 L 112086 H 2 57159 E 52378 SL-111803-H RECEIVED 11-11-11/02 790-M DEC 22 2021 14 0 231 1 9802-M 2 9720-M w 1� 9 6-M9726 CITY OF EDMONDS DEVELOPMENT N SL-1 50-454705 SERVICES DEPARTMENT 37-13454 50 454707 NORTH 2O94 E Old 06`/5-454372 4 For de -energizing customer service for Customer work CUSTOMER CREW HOURS When completed, coil the PUD at 425-783-1000 Customer Signature or (1-877-783-1000) ask Dote for Energy Control Dispatch ACTIONOR OTHER ACTIONREQUIRED APPROVED BY COMPLETED BY DATE Distribution: White -Department Responsible For Work -Return To Originator When Completed Blue-GIS, 03, After Work Completion Canary -Department Responsible For Work -File Copy Pink -Originator