Loading...
APPROVED ENG TESC+7.21.2020_12.22.07_PM1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN COTY OF EDMONDS PUBLIC WORKS DEPARTMENT FILTER FABRIC FENCE TIL-TR TDON SYSTEMS APPROVED BY: R. ENGLISH REVISION DATE JANUARY 2018 STANDARD DETAIL ER-900 IN DE FULL WIDTH GRESS/EGRESS THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT—OF—WAY. ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. SURFACE WATER — ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. MAINTENANCE — THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT—OF—WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT—OF—WAY MUST BE REMOVED IMMEDIATELY. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS* < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 `St. IB13- *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN REVISION DATE COTY OF EDMONDS LSTAEUZED CONSTRNCTDON JANUARY 2018 ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL PROVED BY: R. ENGLISH E R e 9 01 D D ° ° o ° 1> p D AD A D e D D D ° A D e ° DD eo D D A D D D A A D e p d CITY OF EDMONDS `St. IB9- e � A 1 ' e D D e p SOON '\YI,� e A j' A D p D A D D ° D A D ° P °' WATER METER A � D e p t>o ° pA D D i p D A D ° A A C3 ° i D 1) D A/�' p A D BOX D / D __ i DA i eD EXISTING \ -_ _---\- STRUCTURE 1,630 SF IL_ LE S CSC/SOIL PLAN 1"= 20' PUBLIC WORKS DEPARTMENT a .r -I& 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE—THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. =[tER-902 TEMPORARY SEDIMENT TRAP FOR CATCH BASINS APPROVED BY: R. ENGLISH e A A D e D ° D D e p A C D VIEWDR D A D ° ° D D ° D e e p D e D ° e A p A e D D e � D D e D ° D D p CA o 0 0 A D A D A A ° A D p D e D D 1> D o A e � � ° D A ; D' o D D D A 1> I I °p p 2 I A ❑ I I p o A ° -- r -----� IC t� I I D r1A ADDITION 15'4" x 13'-0" EXISTING-------- --- - D TO ADU 3 0'-0" x 2 0'-0' EXISTING GARAGE 30'-0" x 20'-0' DO NOT SCALE - VERIFY ALL DIMENSIONS WTH ARCHITECTURAL SHEETS PRIOR TO CONSTRUCTION NOTES I FILTER FENCE PER CITY STANDARD DETAIL ER-900 2 EXISTING DRIVEWAY WILL BE UTILIZED A5 THE CONSTRUCTION ENTRANCE. FILTER SOCKS WILL BE ADDED TO ANY CATCH BASINS DOWNSTREAM FROM 3 CONSTRUCTION SITE. DETAIL ER-902. 125FT APROX. DOWN THE ROAD. FILTER SOCK TO BE INSTALLED 4 STOCK PILE 15 TO BE COVERED WITHIN 24 HOUR5. rj ALL DISTURBED AREAS TO BE COMP05T AMENDED PER 2014 5WMMWW BMP T.5. 1 3 INSTALL AND MAINTAIN ALL TE5C MEASURES ACCORDING TO APPROVED PLANS, CITY OF 6 EDMOND5 STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. ATELIER PROJECT JONATHAN CASTILLO ADDRESS 7216 SOUNDVIEW DR EDMONDS, WA 98026 DATE 20-0/ -20 KA_C_Q1 STANDARD CSC/SOIL PLAN