Loading...
ENG2022-0003 ROW PERMITOF WAY EUC PERMIT PERMIT NUMBER City of Edmonds AveRIGHT 9801 111 www.cityofedmonds.gov Description: PSE-INSTALL NEW GAS SERVICE W/ PAVEMENT CUTS ISSUED: 01/25/2022 Address: 8051 184TH ST SW EDMONDS WA 98026 EXPIRES: 07/25/2022 it Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27041800103800 W NAME TYPE NAME ADDRESS PHONE APPLICANT SUSAN SIDICK 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 CONTACT PUGET SOUND ENERGY- CORROSION 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 DEPARTMENT CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 OWNER GREGORY & OKA MIDORI HOY 2630 77TH AVE SE A515, MERCER ISLAND WA 98040 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 01 /25/2022 RELEASED BY DATE Printed: Tuesday, January 25, 2022 12:01:43 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. L 11111 0 INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 RESTOR LIMITS Printed: Tuesday, January 25, 2022 12:01:43 PM 2 of 2 ENG2022-0003 of EpM04O� /'V.isa° SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right-of-Wgy permit Handout E6�. RECEIVED Jan 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General • Project Name 1o6376o16 Site Address or if no site address use Property Address at NW corner of project area: 8051184th ST SW Associated Permits: BLD PLN ENG X Owner and Entity Holding Franchise (if applicable) Name of Company PSE/Infrasource Franchise Ordinance No: Point of Contact Susan Sid ick Title SR Permit Specialist Address 1660 Park lane city Burlington State WA Zip 98233 Phone 425-457-6353 Email susan.sidickapse.com Contractor and Authorized Agent of Owner Name of Company (see note below) Contractor Contacts During Construction Primary Name PSE/Infrasource Susan Sidick Agent Name PSE/Infrasource Title SR Permit Specialist Title SR Permit Specialist Mobile 425-457-6353 Address 1660 Park lane Email susan.sidick@pse.com City Burlington State WA Zip 98233 Secondary Name Phone 425-457-6353 Title SR Permit Specialist Email susan.sidick@pse.com Mobile City of Edmonds Business License No: Email State License No: INFRASL871 C2 [N Contractor verifies it is currently bonded d( Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑SSingle family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) From 2" STW main run new complete 1-1/4 PE service also C&C existing 5/8 PE at main. work area is approx 277W y./l of Roth AVE. W & 72' S to act' N c.111 of 194th ST SW (i) 6x6 paving rot & (1) 2x5 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF I x I LF SF 2 days SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power Exgas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No x 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existingunderground common utilitystem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the x project is proposed: 6a. Does your project involve wires/cables/lines? If yes: x How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: x How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: x How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Susan Sidick DATE: 01/03/22 APPLICANT PRINTED NAME: Susan Sidick APPLICANT TITLE: SR Permit Specialist NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 RECEIVED Jan 03 2022 \ CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CITY OF EDMONDS Right -of -Way Application #1071004-106376016 MyBuildingPermit.com Applicant First Name Last Name Company Name Susan Sidick Puget Sound Energy- Corrosion Department Number Street Apartment or Suite Number E-mail Address 1660 Park Lane susan.sidick@pse.com City State Zip Phone Number Extension Burlington WA 98233 4254576353 Contractor Company Name PUGET SOUND ENERGY INC Number Street Apartment or Suite Number 1660 Park lane City State Zip Phone Number Extension Burlington WA 98292 425-457-6353 State License Number License Expiration Date UBI # E-mail Address PUGETSE033DD 3/28/2023 17gn 1 nns.si susan.sidick@pse.com Project Location Number Street Floor Number Suite or Room Number 8051 184TH ST SW City Zip Code County Parcel Number EDMONDS 98026 27041800103800 Associated Building Permit Number Tenant Name 106376016 Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Gregory & Oka Midori Hoy Number Street Apartment or Suite Number 2630 77TH AVE SE A515 City State Zip MERCER ISLAND WA 98040 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 1/3/2022 Submitted By: Susan Sidick Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1071004-106376016 Project Contact Company Name: Puget Sound Energy- Corrosion Department Name: Susan Sidick Email: susan.sidick@pse.com Address: 1660 Park Lane Phone #: 4254576353 Burlington WA 98233 Project Type Activity Type Franchise Utility Franchise Utility Work Project Name: 106376016 Description of Work: 8051 184 ST SW Project Details Project Information Job Number 106376016 Scope of Work Disturbance of Surface Page 2 of 2 r / MyBuildingPermitxom Jurisdiction: Edmonds Project Name: 106376016 RECEIVED Application ID: 1071004 Jan 03 2022 Supplemental Name: Authorization and Acknowledgment - Right of Way CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Please Note: Contractors working in the Right of Way shall be Licensed and Bonded. All provisions of laws and ordinances governing this type of work will be complied with. I certify under penalty of perjury that the information provided on this application is true and correct and, further that I am authorized by the owner of the above premises to perform the work for which the permit application is made. I further agree to hold harmless the City of Edmonds as to any claim (including costs, expenses, and attorney's fees incurred in investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the City of Edmonds, but only where such claim arises out of the reliance of the City, including its officers and employees, upon the accuracy of the information supplied to the City as part of this application. I hereby authorize the City representatives to inspect my property Monday -Friday between the hours of 8:00 a.m. and 5:00 p.m. during this permit application process for verification of site conditions. I certify, under the penalty of perjury under the laws of the State of Washington, that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on behalf of the owner of the subject property. Yes, I authorize. Electronic documents submitted to the City of Edmonds for plan review and permit issuance must be provided in a format that does not prevent the City from making code comments on the documents during review or from making the documents ready for permit issuance. Documents submitted in any manner that prevents the City from completing the review and permit issuance process, including but not limited to submitting documents that are locked, may result in additional review time, permitting delays, and/or cancellation of the permit application if the problem is not resolved by the applicant in a timely manner. Please refer to chapter 18.43 RCW, chapter 18.210 RCW, chapter 196-23 WAC and chapter 196-33 WAC for Washington State laws governing electronic documents. An interpretative guideline from the Board of Registration for Professional Engineers and Land Surveyors can be found at http://www.dol.wa.gov/business/engineerslandsurveyors/docs/eDocsinterpretiveGuideline.pdf. These laws and requirements are subject to change and the submitting parties are responsible for keeping apprised of any such changes. Please acknowledge that you understand these requirements and have verified the electronic documents being submitted meet the City of Edmonds submittal requirements by checking the box below. If you have questions, contact the Engineering Division at engineeringpermits@edmondswa.gov or 425-771 -0220. Yes, I acknowledge. The City of Edmonds makes permit applications available to the public in an effort to make its processes as transparent as possible. By signing or initialing this document, I acknowledge that any and all information submitted as part of this application, is public information. I further acknowledge and agree that this permit application, and any and all documents related thereto, may be disclosed by the City of Edmonds to the public without redaction. Please provide electronic signature below: Susan Sidick r 0 Jurisdiction: Edmonds Project Name: 106376016 Application ID: 1071004 RECEIVED Jan 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Supplemental Name: Right of Way Construction Terms and Conditions MyBuildingPermitxom Will Right of Way construction necessitate the closure of the right of way for a duration over 72 hours? Yes, section(s) of the right of way will need to be closed during construction. See specific information below. Right of Way Closures- Please provide the area sf of the portion of right of way that will be closed over 72 hours and the length of the closure (number of months) below. Sidewalk Area (sf) of Closure Sidewalk Duration of Closure (months) Alley Area (sf) of Closure Alley Duration of Closure (months) Parkiing Strip Area (sf) of Closure 24 Parking Strip Duration of Closure (months) 2 days Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Right of Way Terms and Conditions: Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer or their respective designee. Every flagger must be trained as required by WAC 296-1 55-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer or their respective designee. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to Edmonds Community Development Code 1 8.00; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. Owner/Applicant Signature Susan Sidick Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. C Card Exp. gregory.ha (425)424-E LEGEND ® 28" TRAFFIC CONE ® WORK PIT C* TRAFFIC FLOW FLAGGER WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY ROW SIGN SPACING MPH "x" 60/65 1000, 45/55 500' 35/40 350' 30 200' 25 100' CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 TEMPORARY TRAFFIC CONTROL PLAN MINIMUM TAPER LENGTH=L (FT.) POSTED SPEED (MPH) 70 65 60 55 50 45 40 35 30 25 20 LANE WIDTH - - - 550500 475 270 205 150 105 70 10 - - 660 605550 495 295 225 165 115 75 11 840 780 720 660600 540 320 245 180 125 80 12 WOS L= 2 60 PUGET SOUND ENERGY JOB# 106376016 8051 184th St SW, Edmonds 04/07/2021 eduard.volianskyi@pse.com Sheet 1 of 2 1N311U iNd34 S301AN3S 1N3INdM3A34 SONOWO3 dO I.lIO zz0z so uer C13AI303H Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m 8. If used, place NO -PARK signs 72 hours in advance of the day that the work is to be done. Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@ (425)424-6425 LEGEND ® 28" TRAFFIC CONE ® WORK PIT C* TRAFFIC FLOW FLAGGER WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY ROW SN Q I10 � 4 oo —-- - — - — - — - — - SIGN SPACING MPH "X" 60/65 1000, 45/55 500' 35/40 350' 30 200' 25 100' CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 TEMPORARY TRAFFIC CONTROL PLAN RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE W3-4 USE MAXIM M AVAILABLE SP E FOR SIGNS OZM L-0ZM w 6-0ZM IN fin �¢ X' L. X' J , x' oa A80M MINIMUM TAPER LENGTH=L (FT.) POSTED SPEED (MPH) 70 65 60 55 50 45 40 35 30 25 20 LANE WIDTH - - - 550500 475 270 205 150 105 70 10 - - 660 605550 495 295 225 165 115 75 11 840 780 720 660600 540 320 245 180 125 80 12 PUGET SOUND ENERGY JOB# 106376016 8051 184th St SW, Edmonds 04/07/2021 eduard.volianskyi@pse.com Sheet 2 of 2 10!10 dl4 U ca 1N3NiHVd30 S301A213S 1N31AdM3A30 SONOW03 JO A113 ZZOZ co uer C13AI303H I ROAD WORK N I AHEAD Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. i10 2. All sidewalks, driveways, exits and egresses Q shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m W,S 2 unless otherwise specified. All work for arterials L= and major roadways will be from 9 a.m. to 3 p.m 60 8. If used, place NO -PARK signs 72 hours in advance of the day that the work is to be done. Job #: Date: Jurisdiction: ROW Permit: Est. Start Date: Est. Duration: Puget Sound Energy Gas Pre -Inspect Form 106376016 12/6/21 Address: 8051 184TH ST SW EDMONDS City / Zip: Edmonds, 98026 Yes Customer: RYAN LARSEN 2/7/22 PM / Inspector: Keith Zornes 425-418-7070 1-112 Days (12 hours) RECEIVED Jan 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Job Description / ROW Scope of Work Project Scope: From 2" STW main run new complete 1-1/4 PE service to SFH 8051 (21' scat stub with 259' plat ext) set 630 meter OR @ New Construction: Yes 2 PSI. Also run 1-1/4 twin service (20' all scat) re -hang 250 meter in same location for 8041, and C&C existing 5/8 PE at main. SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM ROAD OVERLAYED IN 2017 - CUT FEES SHALL APPLY. ENGINEERING DIVISION " "7TED Construction Method MINIMUM T-CUT AND 20' GRIND/OVERLAY REQUIRED. — OW 11 /21 /2022 PLAT Map: 160.069 N 18 ----------------VERIFY CLEAR BORE 18335 CROSSINGS FOR ALL CITY UTILITIES. STORM MAIN ON 184TH. MAINTAIN 3' HORIZONTAL SEPARATION FROM WATER, 8041 SEWER, STORM ON PRIVATE PROPERTY. 18325 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. UNKNOWN ' 80( i OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE ..................................... S ... ---- ............................ SW I --— — — -- 2" STW IP 12' S - 68CO37 no storm drains/fire hydrants Work Location Size of Cut Surface Type 277' WEST of CL 80TH AVE W & 12' SOUTH of CL 184TH st sw 6 X 6 X na A 277' WEST of CL 80TH AVE W & 9' NORTH of CL 184TH st sw 2 X 5 X na A of CL & of CL of CL & of CL of CL & of CL Service Information Street Information Job Type Diameter: 1-1/4" PE Flaggers #: 0 Arterial: No New Residential Svc EFV: 1-1/4" - 2600 - 9996744 Police #: 0 TCP: Tie -In Fitting Meter: A630 A250 Speed Limit: 0 No Parks #: 0 Steel - 2" x 2" - Style H17501 - MOP (1440) 7800711 Meter Loc: 03 - OL Trolley Lines: No Mtr Hoods #: 0 Del Press: 2 PSI Traffic Signal: I Bus Stop: No SNO YRD - Snohomish Bollards: 2.5" # 4" # I ADA Ramps #:1 0 1 Route #'s: From: Sidick, Susan <Susan.Sidick@pse.com> Sent: Tuesday, January 11, 2022 10:49 AM To: Edmonds Engineering Permits Subject: FW: ENG2022-0003-8051 184 ST SW Categories: Green category, Red category See comments below ................................................ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. My main comment is that there will be cut fees and a grind and overlay required since the road was overlayed in 2017. Please confirm PSE will want to proceed with this application for gas service. (yes, proceed. The original PM at no point in the process identified the street being within the moratorium period and had not informed the customer of the extraordinary cost involved. It has been 10 months since this process started so we had adequate time to verify this. PSE will cover the cost of the additional fees and the grind and overlay). I believe my other comments just pertained to utility separation on site between water, sewer, and storm; we require at least 3' horizontal separation on private property. Is the developer putting in conduit in the easement and private property? If not, I will red line on the plans that this separation is required. (The customer has supplied the conduit from the north edge of the right of way to the meter location. PSE will only be inserting the service in the conduit.) From: Sidick, Susan <Susan.Sidick@pse.com> Sent: Tuesday, January 11, 2022 9:57 AM To: Zornes, Keith <keith.zornes@pse.com> Subject: FW: ENG2022-0003-8051 184 ST SW Importance: High Hi Keith please answer the questions below and send back to me Thanks This is for 106376016 8051 184 ST SW From: Griggs, Natalie <Natalie.Griggs@edmondswa.gov> Sent: Tuesday, January 11, 2022 9:42 AM To: Sidick, Susan <Susan.Sidick@pse.com> Cc: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Subject: Re: ENG2022-0003-8051 184 ST SW CAUTION - EXTERNAL EMAIL Phishing? Click the PhishAlarm "Report Phish" button. Hi Sue, My main comment is that there will be cut fees and a grind and overlay required since the road was overlayed in 2017. Please confirm PSE will want to proceed with this application for gas service. I believe my other comments just pertained to utility separation on site between water, sewer, and storm; we require at least 3' horizontal separation on private property. Is the developer putting in conduit in the easement and private property? If not, I will red line on the plans that this separation is required. I am working intermittently the next two days, so please respond to this email and reply to engineeringpermits@edmondswa.gov (also copied on this email). Thanks, Natalie Griggs On Jan 11, 2022, at 6:29 AM, Sidick, Susan <Susan.Sidick@pse.com> wrote: Hi Natalie in the portal this should Jurisdication Comment correction letter but Im not finding the issue? Susan Sidick 1660 Park Lane Burlington Wa 98233 425-457-6353 SR Permit Specialist