APPROVED ENG RESUB 3-Applicant_Response and Plan• Fike will provide ground man to direct pedestrian traffic around construction to existing cross walks that will remain ope on the corer of Dayton and 3rd
• Working hours are from 7:30-6pm Monday through Friday, we may work Saturdays if delayed by weather.
• Sidewalk will be fully open during non working hours Permitted Saturday work hours 10 AM
• Presure washing using domestic water only no detergents to 6 PM. OWNER/CONTRACTOR IS RESPONSIBLE FOR
• Storm drains will be fitted w/ silt socks No work Sundays or Federal Holidays. EROSION CONTROL AND DRAINAGE
• Street trees will not be effected we are working from man lifts
• Manlifts will be parked in the "red" parking lanes overnight w/ their booms down Applicant shall repair/replace all
• Fike will utalize a dump trailer for waste that will only be onsite during working hours damage to utilities or frontage
: West Elevation: 30d OS109l21 09?17;'21 improvements in City right-of-way
East Elevation South Elevation per city standards that is caused or
Remove & Remove & Remove & 30d 06128121 08106/21
Replace Hardie 20d 05l17121 O6l11121 Replace Hardie Replace Hardie occurs during the permitted project.
Siding 2nd fir siding 2nd Hr Siding 2nd fir
East Elevation:
IWest Elevation: 30d 08149121 09117121
South Elevation:
CleanJRe-seal & 30d 06128f21 08/06/21
CleanlRe-seal & 30d 05l17121 O6l25121
cleanlre-seal &
Paint 1st & 2nd 0
Paint 1st 2nd flr
paint 1st & 2nd ffr
Dayton St.
ENGINEERING DIVISION
3rd Ave S. IP,
Lane 30d 00109121 09;17r'21
Sidewalk Closure_ 30d 06r28121 08/06121
APPROVED AS NOTED
Sidewalk Closure: 30d 05117/21 06/25121
g
M-F 7 30 am-6 pm
M-F 7:30 am- 6 pm
Closure_ Dayton
st.- to include ALL
Parking Lane
,ofn�P 06/01/2021
Parking Lane
parking stall in
Closure Dayton
��°
Closure: 3rd Ave
front of Harbor
to include ALL
parkin stalls in
g
S_ to include ALL 30d 05/17/21 06/25121
parking stalls in
View Plaza {2) &
30d 06r28f21 08/06121
front of Harbor
front of Harbor
French Quarter
View Plaza (2)
View Plaza (4-5
condominiums
AN
FrenchQuacter
`
0
■ r.'A
Project to be staged in phases on 3rd Ave S and Dayton St
such that closures only occur on one street at a time.
Manlifts left in parking spaces overnight (with booms down)
shall be at least 50' from the corner.
Fencing not permitted in right-of-way.
Additional time for closure of City right-of-way shall require
ravialn/ and nnnrnval from thin Fnninaarinn HPnnrtmant
Additional disruption fees shall apply for closure beyond what
is included on approved phasing plan.
�� All Signs & Spacing to conform to the MUTCD & The City Edmonds of Traffic Control Manual
TrAc Control Plan R9-9
Indust 1 �+l i r� l F, SCLOSED IDEWALK
Jobs itoAddress: 152 3rd Ave S L 7 T39
Contact: Brett Fike (907) 982-0544
Email: bfikel fikeindustrialcanstructicn_com '
Work Hours: Sam to Bpm (M-F)
Working Days:
Type of Work: Removing & Replacing Siding & Paint
WHEN DAYTON SIDEWALK IS
CLOSED, "SIDEWALK CLOSED AHEAD
CROSS HERE" SIGN REQUIRED AT NE
CORNER 2ND AND DAYTON
R9-11ai:Rj
&6EHLLKCLMtB �
CR999 "EPf
Sidewalk
3rd Ave S
SCHEDULE ALL NOTED INSPECTIONS.
SCHEDULE TRAFFIC CONTROL INSPECTION AT
START OF WORK.
SCHEDULE SIDEWALK AND/OR PARKING OPEN
INSPECTIONS WHEN RE -OPEN EACH SIDE.
'Signs. detnoes and spoccg shall conform lothe MLITOD
'Coordinate,YacilftA driveaayloadzonle access
'Maintain 11' vehicle lane YMMs
Priority access gall be provided to emergency vehicles
'Notify metro of bus murolslop impacts
NOT TO SCALE
'Sign spacing may be reduced to fit road condnans
`PLAN NOT TO SCALE
r� r
&AN&W
FLAOr,0/!¢ 4 EQUIPMENT
R7-T39
R9-9
..
r47-T39
SIDEWALK
—_
CLOSED
R9-11a(L)
yoexuxtu eeo
cYlo55 Nerve
R7-T39--'- R7-T39
A
9
Legend
Cane
R7-T39 R7-T39
MI R9-11 a(L)
EHI R9-11 a(R)
CED R9-9
01 Sign Stand
www.invarion.com
>N
`Fencing around the parking spaces
vrill not be permitted
R7-T39
R9-9
SIDEWALK
CLOSED
REMOVE CONES AND SIDEWALK CLOSED SIGNS WHEN OPENING
SIDEWALK AT NIGHT OR ON WEEKENDS.
Awn �:tisaurxln[ats nnllAi s: s5 y N
Ala lcx.YL�lYw'Y�lGhvi rW IIM
WGi1�lY YiWiMAdRC15 �M � � ]� �L�
I'i YLA+P4+�+IG�OIl\RP�4 �S+"+rJWI�
� NOOM!-.L 5�l►AIUL�i[Im�RSTf+J 40 -
[plYM� 4
q�ldih1�54M YGAm[lhn uWrrlGGlC RI Ix IxA 1�F'lOp+'��+�•-
�wr*�ro�an
WHEN 3RD AVE S SIDEWALK IS CLOSED, "SIDEWALK CLOSED AHEAD
CROSS HERE" SIGN REQUIRED AT NW CORNER 3RD AND JAMES ST
K5 efaGllla 5 Wx1
TCSxrc 1a2.lw i1T;pFWI!CA
f4orVrcrtsl6cpsgrnall.mm 4
2G&a71-0934 �Y•�J
aw.: 201P2621
TGP PG _7_OF
RIGHT-OF-WAY Plan review comments were provided on April 30, 2021 and were discussed in a meeting May 4, 2021. The comments provided below are based
on the current submittal received May 6, 2021.
RESUB
1) Will there be Saturday work? If so, please revise the plans to include Saturdays and Saturday construction hours. May 19 2021
a. Monday through Friday 7 AM to 6 PM, Saturday 10 AM to 6 PM, no work Sunday or Federal Holidays. CITY OF EDMONDS
• We are not planning to work Saturdays however if the schedule slips due to weather, we need to revisit. DEVELOPMENT SERVICES
DEPARTMENT
• There will be NO work on Sundays or Federal Holidays.
2) Per discussions with the applicant and the contractor, the sidewalk and parking on 3rd Ave needed to be closed to complete the work on the north side of the
building; however, the plans do not show any work on the north side. Please revise the plans to include the north side phase of the project as applicable.
Show proposed closure area(s) and duration estimates for this phase of the project.
• The north side is on hold if/when it is determined to be added to the contract, we will submit a plan.
• If we do the north property, it will only affect the parking closure on 3rd
3) The contractor previously indicated that the Dayton St side of the project would only be closed for 30 days, but the plans show 30-day closure of sidewalk
and parking for the south elevation phase, and then 30-day closure of parking for the west elevation phase. Please clarify if the intention is to utilize all
marked parking stalls on Dayton for all 60 days or if this can be minimized, please revise the plans accordingly.
• Dayton parking stalls will be closed from 6/28-8/6 for construction on the south elevation
• Dayton parking stalls will be closed from 8/9-9/17 for construction on the west elevation
• Effectively 60 days for the 2 phases
• The plan is correct as it is by elevation
4) If the manlifts are intended to be left in the parking stalls overnight, please confirm that
they will be placed in the parking stalls and the lifts will be brought down so as not to
create a sight -distance issue.
• Yes, the lifts will be parked w/ the booms down
5) Please show signage and channelization devices that will be used on the plans or on a separate traffic control plan.
a. A -frame signs or similar maybe used to note "NO PARKING' for permitted workdays.
all PARKING
FROM
7O
TOW -AWE 8� AREA
a.
1. When construction vehicles are not in the parking stalls, "NO PARKING" signs can be placed at the face of curb. These signs shall not encroach into
the pedestrian travel area within the sidewalk.
b. Please add a note to the plans that fencing around the parking spaces will not be permitted.
6) Please provide a revised estimate of sidewalk and parking closure so disruption fees can be calculated, including lineal feet of the sidewalk and parking
(separately) and duration for each phase.
a. From the proposal on the latest submittal, the disruption fees would amount to approximately $3-2;5.5 -for parking closure and far sidewalk
closure (totalThese fees are approximate and will be revised following updated information provided by the applicant/contractor that include
the phased approach. Please note, these fees do not include any closure of sidewalk or parking that may be needed for working on the north side of the
building. 7'
1. 3rd Ave S. Sidewalk Closure: M-F 7:30 am- 6 pm 5/17-6/25 (60 days) 120' x`5� = bee sq ft 840 SF
i. Intermittently closed —20' section at a time due to overhead work on the lift reaching from the parking stalls. We will have crew on the
ground directing pedestrian traffic around the work area, it is never really closed. 8.5'
2. Parking Lane Closure: 3rd Ave S: to include ALL parking stalls in front of Harbor View Plaza (4-5) 5/17-6/25 (60 days) 75'xX= 60'0 sq ft 637.5 SF
3. Dayton St. Sidewalk Closure: M-F 7:30 am-6 pm 6/28-8/6 (30 days) 120'x 5 ='M sq ft 840 SF
i. Intermittently closed —20' section at a time due to overhead work on the lift reaching from the parking stalls. We will have crew on the
ground directing pedestrian traffic around the work area, it is never really closed.
4. Parking Lane Closure: Dayton St. to include ALL parking stalls in front of Harbor View Plaza (2) & French Quarter Condominiums (3) 6/28-8/6 (30
days) (27'x & = 2=f6 sq ft) & (45'x`& = e6e•sq ft) _ 517\6 sq ft total 8.5' wide parking total - 612 SF
S. Parking Lane Closure: Dayton St.: to include ALL parking stall in front of Harbor View Plaza (2) & French Quarter condominiums (3) 8/9-9/17
(30days) (27'xX = 216 sq ft) & (45'x & = 360 sq ft) = 5-�6 sq ft total
8.5' 8.5' total - 612 SF
'Disruption fees calculated based on ROW
conditions at Dayton St and 3rd Ave S --
7-foot sidewalks & 8.5-wide parking spaces.
Disruption fees for sidewalk and parking
closure = $26,304.13.