APPROVED PLN_BLD BLD2020-1307+Pictures and Plan+11.17.2020_12.47.37_PMHarborview Plaza 152 3rd Ave S. Edmonds, WA 98020 Work Plan for the City
Start date: May 3, 2021
Contractor: Fike Industrial Construction, LLC
Work authorized and contracted by the Harborview Plaza COA
COA contact is James (Jim) Cook, the COA Secretary, and owner of condo unit A.
City Of Edmonds
Building Department
-------------------------------
Work SIDING REPLACEMENT
Address-----------5-2-3-RDAVE--S- ---
--------------------------
Owner HARBORVIEW CONDOMINIUMS
-------------------
Approved Date, 12/14/2020
'------------------
Summary of work to be completed: Building official -Doxo,rvK_ W. Xo95km
• All stucco is to be cleaned and repainted Permit Number BLD2020-1307
• All existing Hardie Plank is to be removed and replaced with like material, Hardie Plank Color Plus
• All existing metal and wood trim are to be repainted Approved by Fire
• The existing doors and surrounding metal framing are to be repainted , 2 d
• The existing garage metal gate is to be painted Fire alarm will need to remain in service,
any alterations to fire alarm will require
a separate permit.
Level C RECEIVED
Dec 03 2020
CITY OF EDMONDS
DEVELOPMENTSERVICES
UL - DEPARTMENT
APPROVED BY PLANNING
Dec 14 2020
Like for like siding replacement and
repainting.
f# { -- - ---------- --_----�
North side of building
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is a flat panel section covering the North side of the Main floor will be repainted.
• Level C is concrete that is not currently painted and will NOT be painted as part of this project
South side of building: garage entrance on Dayton
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is Stucco which will be repainted
• Level C is concrete that is currently painted and will be repainted as part of this project
West side of the building facing the water
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is a flat panel section covering the West side of the Main floor that will be repainted.
• Level C is concrete that is not currently painted and will NOT be painted as part of this project
• Circles are the 4 chimney stacks with Hardie Plank siding which will be removed and replaced with similar Hardie
Plank siding
Southwest corner of building viewed from Dayton St
• Level A is flat panel covering the West side of the Main floor that will be repainted
• Level B is concrete that is currently not painted and will NOT be painted
Northeast corner of building looking from 3rd Ave
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is a flat panel section covering the North side of the Main floor that will be repainted.
Proposed lay down area for access, dumpsters, and staging in red
..a++ice ►eau.