ROW Application 152 3rd AVE S�0.4 of EOA104A
'1NC- 1890
PROJECT NAME:
NOV 3 0 2020
DEVELOPMENT SERVICES
COUNTER
ROW PERMIT NO.: ENG.
ISSUE DATE:
RIGHT-OF-WAY CONSTRUCTION
PERMIT APPLICATION
CONTRACTOR: 1�-' Cy�s
Mailing Address: p 0,7
State License #:
City Business License #: �," ".tL,
4 G ;,k l
CONTACT: J(ones &e)�—
Vw
Phone #: 4Z57_ S OS,_ 7 Z / (o
ADDRESS OR INTERSECTION OF CONSTRUCTION:
Fax #: N (4
Email #:
Liability Insurance El Bonded
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT:
Commercial ❑ Subdivision 0 City Project 0 Traffic Control (Only)
❑ Multi -Family ❑ Single Family
❑ EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket permit?
ANY ASSOCIATED PERMITS?
fgpk� �; '85'W-01
FA Other
❑ Yes EX-1 No
BLD# ENG#
DESCRIPTION OF PROPOSED WORK (Be Specific) :
vS
(5
210
10 LI
WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO 0 Year:
PAVEMENT CUT: ❑ Yes ® No If yes, indicate size of cut: x
CONCRETE CUT: ❑ Yes R No If yes, indicate size of cut: x
rRIGHT-OF-WAY
AREA
CLOSURE
TOTAL
DURATION
(NUMBER OF MONTHS)
idewalk 48 Hrs + 'y o LF
X
� � � LF
� Z 2 (- SF
-
Alley 72 Hrs + LF
X
_---LF
SF
Parking 72 Hrs + .� LF
X
17 S' LF
1 `F8g SF
1
APPLICANT TO READ AND SIGN
*Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
*Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday - NO EXCEPTIONS.
Indemnity: The Applicant has signed an application which states he/she hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this permit.
I have read the above statements and understand the permit requirements and acknowledge that I must
follow all requirements in order for the Nimit to rp valid.
E
SIGNATU DATE u Let
Contractor or Agent
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
Harborview Plaza 152 3rd Ave S. Edmonds, WA 98020 Work Plan for the City
Start date: May 3, 2021
Contractor: Fike Industrial Construction, LLC
Work authorized and contracted by the Harborview Plaza COA
COA contact is James (Jim) Cook, the COA Secretary, and owner of condo unit A.
Summary of work to be completed:
• All stucco is to be cleaned and repainted
• All existing Hardie Plank is to be removed and replaced with like material, Hardie Plank Color Plus
• All existing metal and wood trim are to be repainted
• The existing doors and surrounding metal framing are to be repainted
• The existing garage metal gate is to be painted
Level C
Level A
Level B
East side of building: building front on 3rd Ave
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is Stucco which will be repainted
• Level C is the elevator stack on the roof the Hardie Plank will be removed and replaced with similar Hardie Plank
siding
North side of building
Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
Level B is a flat panel section covering the North side of the Main floor will be repainted.
Level C is concrete that is not currently painted and will NOT be painted as part of this project
South side of building: garage entrance on Dayton
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is Stucco which will be repainted
0 Level C is concrete that is currently painted and will be repainted as part of this project
West side of the building facing the water
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is a flat panel section covering the West side of the Main floor that will be repainted.
• Level C is concrete that is not currently painted and will NOT be painted as part of this project
• Circles are the 4 chimney stacks with Hardie Plank siding which will be removed and replaced with similar Hardie
Plank siding
Southwest corner of building viewed from Dayton St
• Level A is flat panel covering the West side of the Main floor that will be repainted
• Level B is concrete that is currently not painted and will NOT be painted
• Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding
• Level B is a flat panel section covering the North side of the Main floor that will be repainted.
Proposed lay down area for access, dum
rs, and staging in red
0