Loading...
ROW Application 152 3rd AVE S�0.4 of EOA104A '1NC- 1890 PROJECT NAME: NOV 3 0 2020 DEVELOPMENT SERVICES COUNTER ROW PERMIT NO.: ENG. ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION CONTRACTOR: 1�-' Cy�s Mailing Address: p 0,7 State License #: City Business License #: �," ".tL, 4 G ;,k l CONTACT: J(ones &e)�— Vw Phone #: 4Z57_ S OS,_ 7 Z / (o ADDRESS OR INTERSECTION OF CONSTRUCTION: Fax #: N (4 Email #: Liability Insurance El Bonded ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: Commercial ❑ Subdivision 0 City Project 0 Traffic Control (Only) ❑ Multi -Family ❑ Single Family ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? fgpk� �; '85'W-01 FA Other ❑ Yes EX-1 No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : vS (5 210 10 LI WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO 0 Year: PAVEMENT CUT: ❑ Yes ® No If yes, indicate size of cut: x CONCRETE CUT: ❑ Yes R No If yes, indicate size of cut: x rRIGHT-OF-WAY AREA CLOSURE TOTAL DURATION (NUMBER OF MONTHS) idewalk 48 Hrs + 'y o LF X � � � LF � Z 2 (- SF - Alley 72 Hrs + LF X _---LF SF Parking 72 Hrs + .� LF X 17 S' LF 1 `F8g SF 1 APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the Nimit to rp valid. E SIGNATU DATE u Let Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Harborview Plaza 152 3rd Ave S. Edmonds, WA 98020 Work Plan for the City Start date: May 3, 2021 Contractor: Fike Industrial Construction, LLC Work authorized and contracted by the Harborview Plaza COA COA contact is James (Jim) Cook, the COA Secretary, and owner of condo unit A. Summary of work to be completed: • All stucco is to be cleaned and repainted • All existing Hardie Plank is to be removed and replaced with like material, Hardie Plank Color Plus • All existing metal and wood trim are to be repainted • The existing doors and surrounding metal framing are to be repainted • The existing garage metal gate is to be painted Level C Level A Level B East side of building: building front on 3rd Ave • Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding • Level B is Stucco which will be repainted • Level C is the elevator stack on the roof the Hardie Plank will be removed and replaced with similar Hardie Plank siding North side of building Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding Level B is a flat panel section covering the North side of the Main floor will be repainted. Level C is concrete that is not currently painted and will NOT be painted as part of this project South side of building: garage entrance on Dayton • Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding • Level B is Stucco which will be repainted 0 Level C is concrete that is currently painted and will be repainted as part of this project West side of the building facing the water • Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding • Level B is a flat panel section covering the West side of the Main floor that will be repainted. • Level C is concrete that is not currently painted and will NOT be painted as part of this project • Circles are the 4 chimney stacks with Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding Southwest corner of building viewed from Dayton St • Level A is flat panel covering the West side of the Main floor that will be repainted • Level B is concrete that is currently not painted and will NOT be painted • Level A is Hardie Plank siding which will be removed and replaced with similar Hardie Plank siding • Level B is a flat panel section covering the North side of the Main floor that will be repainted. Proposed lay down area for access, dum rs, and staging in red 0