Loading...
APPLICANT RESPONSE TO BLD 4.20.20Michael A. George Architect P.S. mikeaia@yahoo.com yahoo.com (360) 568-1331 (360) 568-1930 Fax 922 First Street Snohomish, WA 9 8 2 9 0 April 20, 2020 City of Edmonds Building Division Subject: Plan Review Comments Plan Check: BLD2020-0224 Project Address: 1143 6`' Ave S. Madden Roof and Deck Addition This is a letter in response to items 1 and 2 of the Plan Review Comments dated 3/31/20 . 1. Existing smoke and carbon monoxide detectors are shown on sheets A2 and A3. The detectors are for both smoke and carbon monoxide. The new fixture location is shown at the existing Bedroom 2. All of the existing detectors, and the new one are inter connected. One goes off they all go off. 2. The new roofs will be vented at the new eaves with a continuous 1" air space to the new continuous ridge vents above. See sheet A4. There are no crawl space areas. Total new roof vented area: 404sf at 1/150 = 2.7sf Please let me know if you have additional questions Sincerely Michael A. George Architect mikeaiakyahoo.com 425-330-5505 4474 REGISTERED RCHITECT rA E OF �W114iaTOt7 WST COAST S TRUCTURALLY/ ENGINEERING, INC. 9540 Semiahmoo Parkway #137 Blaine, WA 98230 April 16, 2020 City of Edmonds Building Division Subject: Plan Review Comments Plan Check: BLD2020-0224 Project Address: 1143 61 Ave S. Madden Roof Addition and Deck WCSE Project No: W4468 This letter is in response to items 3-6 of the Plan Review Comments dated 3/31/20 for the above referenced subject. 3. A prefabricated metal railing will be used. The loading requirements have been added to the plans. 4. The size and material are now indicated on the plans. 5. Holdowns are now shown on the framing plan and detail. 6. A post to beam connection detail has been added. If there are any questions regarding the above or if we may be of further assistance, please contact this office. rSinandless PE, SE West Coast Structural Engineering Inc. 4-16-20