Loading...
structural calcsWEST COAST STRUCTURAL" ' ENGINEERING. INC. Project Description: Project Location Project Number: Date: Design Criteria: 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, W A 98230 STRUCTURAL CALCULATIONS 6/4/2018 Madden Addition Edmonds, WA Michael George Architect 1024 First St. Snohomish, WA 98290 W 4468 June 4, 2018 Code: 2015 IBC / ASCE 7-10 Soil: Site Class "D" ( Assumed ) Wind: 110 mph Allowable Bearing: 2000 psf Exposure: B Passive Pressure: 300 pcf Kzt: 1.00 Active Pressure: 35 pcf (unrestrained) Seismic Zone: Design Category D 60 pcf (restrained) Friction: 0.35 Snow Load: 25 psf LL Roof: 15 psf DL Seismic Spectra: By Lat/Long Floor: 40 psf LL USGS Earthquake Hazards Program 10 psf DL Project: W4468 Sheet No: 1 6/4/2018 WEST � COAST STRUCTURALl--��I�`I ENGINEERING. INC. 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA 98230 This is a revision to a previous project done is 2011, WCSE project No: W3373. A new deck, wing walls and a roof over the deck and bedroom is proposed. The footprint of bedroom 2 remains. Partial Roof Framing Plan NTS Project: W4468 Sheet No: 2 6/4/2018 WEST COAST l STRUCTURAL`" I ENGINEERING, INC. 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, W A 98230 Beam: RB1 Uniform Loads Span: 7.5 ft start end (ft) Member: 4x8 DF#2 E psi 1.60E+06 inA4 111 A inA2 25.4 Results M allow = 2.99 (k-ft) M max = 2.53 (k-ft) R1 = 1.35 (k) R2 = 1.35 (k) v max = 80 (psi) Deflect. = 0.145 (in) = L 622 0 7.5 x = 3.75 (ft) M Qa x = 2.53 (k-ft) Vgx= 0 (k) l000 Loading Diagram: B1 Magnitude(plf) start end (plf) 360 360 Point Loads distance(ft) Magnitude(k) c 500 0 0 0 1 2 3 4 5 6 7 Beam: RB2 Uniform Loads Span: 10.5 ft start end (ft) Member: (2) 202 DF#2 E psi 1.60E+06 inA4 356 A in^2 33.8 Results M allow = 4.74 (k-ft) M max = 3.31 (k-ft) R1 = 1.26 (k) R2 = 1.26 (k) v max = 56 (psi) Deflect. = 0.115 (in) = L 1091 0 10.5 x = 5.25 (ft) M @a. x = 3.31 (k-ft) Vga x= 0 (k) 1 0.8 0.6 0.4 0 0.2 a Al Magnitude(plf) Point Loads Magnitude(k) start end (plf) distance ft 240 240 l000 Loading Diagram: B2 1 w os .a v 0.6 0 500 0.4 0 0.2 a 0 0 0 2 4 6 8 10 12 Project: W4468 Sheet No: 3 6/4/2018 WEST COAST STRUCTURAL — r ENGINEERING, INC. Beam: Span: 11.5 ft Member: 4x10 DF#2 E psi 1.60E+06 inA4 231 A inA2 32.4 Results RB3 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA98230 Uniform Loads start end (ft) 0 11.5 i x = 5.75 (ft) M @ x = 4.35 (k-ft)1 V 96� �oading Diagram: RB3 a 40 M allow = 4.49 (k-ft) m M max = 4.35 (k-ft) 2° R1 = 0.82 (k) o R2 = 0.82 (k) ° 2 v max = 38 (psi) Deflect. = 0.229 (in) = L 602 Magnitude(plf) Point Loads Magnitude(k) start end (plf) distance ft 20 20 1 5.75 1.4 E 1500 1000 a Soo 0 a 4 6 8 10 Beam: RB4, RB5 Uniform Loads Magnitude(plf) Point Loads Magnitude(k) Span: 12 ft start end (ft) start end (plf) distance(ft 0 12 0 320 Member: (2) 2x12 DF#2 E psi 1.60E+06 x = 6 (ft) inA4 356 M @ x = 2.88 (k-ft) A inA2 33.8 V @ x = 0.16 f k) Loading Di gram: RB4, RB5 1 Results a 800 1 0.8 M allow = 4.74 (k-ft) 600 0.6 J 400 0.4 0 M max = 2.96 (k-ft) 200 0.2 a R1 = 0.64 (k) o o R2 = 1.28 (k) 0 2 4 6 8 10 12 v max = 57 (psi) Deflect. = 0.132 (in) L 1094 Project: W4468 Sheet No: 4 6/4/2018 `VEST COAST h� STRUCTURAL E� ENGINEERING, INC. Beam: Span: 8 ft Member: 2x12 DF#2 E psi 1.60E+06 in^4 178 A inA2 16.9 Results M allow = 2.37 M max = 1.64 R1 = 0.53 R2 = 1.07 v max = 94 Deflect. = 0.065 = L 1477 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA 98230 Magnitude(plf) Point Loads Magnitude(k) start end (plf) distance ft 0 400 C E w 1000 Loading Di,igram: RB6 1 a 0.8 y .a (k-ft) 0.6 a soo (k-ft) 0.4 ° 0.2 a (k) ° 0 (k) 0 1 2 3 4 5 6 7 8 (psi) (in) RB6 Uniform Loads staff end (ft) ( 0 8 x = 4 (ft) M @a x = 1.6 (k-ft) Vgax=0.13(k) Beam: RB7 Uniform Load Span: 23 ft start end (ft) 0 23 Member: 5 1 /8" x 16 1 /2" 24F V4 GLB E psi 1.80E+06 x = 11.5 (ft) I in 4 1919 M @ x = 23.8 (k-ft) A inA2 84.6 V t7a x= 0 k Results loon Loading Diagram: RB7 M allow = 46.50 (k-ft) m soo M max = 23.80 (k-ft) 0 M R1 = 4.14 (k) ° R2 = 4.14 (k) 0 5 v max = 73 (psi) Deflect. = 0.658 (in) = L 420 s Magnitude(plf) Point Loads Magnitude(k) start end (plf) distance(ft) 360 360 —� l 0.8 n 0.6 0.4 c 0.2 a 0 10 15 20 Project: W4468 Sheet No: 5 6/4/2018 WEST Beam: BB8 Uniform Loads Mag Point Loads Magnitude(k) Span: S ft start end (f0 start end (p|f) di Member: 51/8"x9^24FV4 Epoi 1.80E+06 1in14 311 M Ain^2 481 V ~~ m un�� �� Results Long �� emo �_______� Ma||mw= 13.80 (k4t) � umm = � 0 zoo 2000 ��max ~ 6.75 (k41) D 1000 � R1 2.40 (k) » o R2= 2.40 (k) - ^ ^ ~ ° , o vmux~ 78 (psi) Deflect. = 0.064 (in) � L 1131 ` Beam: RB8 Uniform Loads Magnbude(oK) Pont Loads Magnitude(k) Span: 15.5 ft start end (M) start end (p|0 d Member: 5 1/8"x 10 1/2^24FV4GLB E psi 1.80E+06 x~ 7.75 (ft) | |n^4 494 h4@x= 8.61 (k'ft) /4 in2 53.8 V@ x = U (k) Results aoo �� Loading Diagram: z 400 u�u KAallow = 18.80 (k-h) M 0.6 = �� max = 6.61 (k'f� � zoo 0.4 � oa � R1 = 171 (k)o n� R2= 1.71 8O - - ' ~ ~ 12 ^° vmax = 47 (psi) Deflect. = 0.822 (|n) � L -----' 578 Project: VV4468 Sheet No: 6 6/4/2018 WEST COAST �= r STRUCTURAL L ENGINEERING. INC. 0 a u Deck Floor Framing Plan NTS 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA 98230 Beam: Deck Joists Uniform Loads Magnitude(plf) Point Loads Span: 7.5 ft start end (ft) start end (plf) distance(ft) 0 7.5 67 67 4.5 Member: 2x8 H F#2 E psi 1.30E+06 x = 3.75 (ft) inA4 47.6 M @ x = 0.7 (k-ft) A in^2 10.9 V @ x = 0.06 (k) Results M allow = 1.12 (k-ft) Z00 Loading Diagram: Deck Joists M max = 0.72 (k-tt) also R1 = 0.31 (k) 'am 100 R2 = 0.34 (k) so v max = 47 (psi) o Deflect. = 0.112 (in) 0 1 2 a 4 5 6 L 803 Magnitude(k) 0.15 I 200 150 100 o so d 0 Project: W4468 Sheet No: 7 6/4/2018 s J. WEST ` COAST �l r STRUCTURAL"---t �r ENGINEERING, INC. Beam: Span: 7.5 ft FB1 Member: 4x8 DF#2 E psi 1.60E+06 inA4 111 A inA2 25.4 Results M allow = 2.99 (k-ft) M max = 2.79 (k-ft) R1 = 0.77 (k) R2 = 1.03 (k) v max = 61 (psi) Deflect. = .0.132 (in) = L 679 Beam: Span: 6.1 ft Member: 48 DF#2 E psi 1.60E+06 inA4 111 A inA2 25.4 Results FB2 M allow = 2.99 (k-ft) M max = 3.94 (k-ft) R1 = 1.59 (k) R2 = 1.49 (k) v max = 94 (psi) Deflect. = 0.125 (in) = L 587 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, W A 98230 Uniform Loads Magnitude(plf) Point Loads start end (ft) start end (plf) distance(ft) 0 75 j 67 4.5 x = 3.75 (ft) M @ x = 2.42 (k-ft) t V 9 x = 0.52 (k) 200 Loading Diagram: FB1 a 150 m 100 0 so 0 0 1 2 3 4 5 6 Uniform Loads Magnitude(plf) Point Loads start end (ft) start end (plf) distance(ft) 0 6.1 160 160 2.9 x = 3.05 (ft) M x = 3.79 (k-ft) E Vx= -1 (k) no good - supplement 4x8 with 1-3/4x7-1/4 LVL Magnitude(k) 1.3 f r 1500 1000 soo o 7 Magnitude(k) 2.1 Project: W4468 Sheet No: 8 6/4/2018 WEST 1 COAST S T R LICTU R�AL�-17r��LJ .ENGINEERING. INC. 9540 Semiahmoo Parkway (425) 347-8998 #137 wese.net Blaine, WA 98230 Beam: FB2 Uniform Loads Span: 6.1 ft start end (ft) I Member: 1 3/4" x 7 1/4" LVL & 4x8 4 E psi 1.90E+06 x = 3.05 (ft) 1 inA4 160 M @ x = 3.79 (k-ft)' A inA2 12.7 V @ x = -1 (k) Results M allow = 6.50 (k-ft) . Loading Diagram: FB2 M max = 3.94 (k-ft) 400 300 R1 = 1.59 (k) '0 200 0 R2 = 1.49 (k) 100 _ v max = 188 (psi) 0 I �.••.••......_, Deflect. = 0.073 (in) 0 1 2 = L 1005 Ledger & Wood Screw Spacing O.w Magnitude(plf) Point Loads start end (plf) distance(ft) 160 160 j 2.9 i 3 4 5 Ledger's Value Specifications Ledger Type: P.T. 2x8 HF #2 Magnitude(k) 1 2.1 [ I L__ 2500 2000 7 1500 a 000 0 500 a 0 6 M (ALLOWED) = 1..12 k-ft. E = 1.24E+06 psi 1= 47.6 inA4 A = 10.9 inA2 Maximum size opening (OW) : 3.0 ft. Maximum distance between ledoer and next support beam ( d) 7.5 ft. W = (1/2)( d) * 50 = 0.188 klf M (MAX) = 0.2 k-ft. A ai-) = 0.006 in. _ V (MAX) = 39 psi. 6193 Using ANSUAFR.PA NDS specification (Table 11L). Side member thickness = 1-1/2". With #12 wood screw into Hem -Fir, Wood design values (Z) for single shear (two members) connections Shear Force = 188 lbs. Z (perp.) = 128 lbs. / wood screw Secure wood screw into house rim joist or Required wood screw spacing for ledger ( B.S. = 8 in. o.c. into house wall studs to attach ledger to house. Foundation and primary lateral force resisting system remain and are not significantly affected. These were with the previous project. The footprint and profile remains the same with the only difference in that the roof over the deck projects a bit more. This leads to less than 5% difference in the lateral forces on the building and is not significant. Project: W4468 Sheet No: 9 6/4/2018