APPROVED BOND QTY WORKSHEET PLN2021-0007Site Improvement Bond Quantity Worksheet
LIM King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name: Select Homes 81 st Ave W 2-Lot Short Plat
Location:
20323 81 st Ave W
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
20-019 Select 81 st Ave W SP - Bond Quantity Worksheet.xlsx
S15 Web date: 04/03/2015
RECEIVED
NOV 29 2021
For alternate formats, Call 206-296-6600. CITY OFEDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Date: 11 /29/2021
Project No.:
Activity No.:
PLN 2021-0007
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
PERFORMANCE BOND AMOUNT:
$75,508.50 x 120% = $90,610.20
INSPECTION FEES:
$75,508.50 x 3.3% = $2,491.78
FUTURE MAINTENANCE BOND AMOUNT:
$90,610.20 x 15% = $13,591.53
ENGINEERING DIVISION
APPROVED AS NOTED
2/16/2021
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11/29/2021
Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/2015
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
240
1
360
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
50
1
200
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
1
1
3200
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
1000
1
1000
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
10
1
1100
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see paqe 91
CB Protection/Inserts
$ 120.00
Each
7
1
840
Tree Protection Fencing
$ 800.00
11
1
800
Page 2 of 9
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
RECEIVED COLUMN:
NOV 29 2021
20-019 Select 81st Ave W SP - Bond QuantityWorksheet.xlsx CITY E PMONDS
DEVELOPMENT
SERVICES DEPARTMENT
$ 7,500.00
$ 2,250.00
$ 9,750.00
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11/29/2021
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
50
300.00
40
240.00
10
60.00
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$10,000.00
Acre
Excavation - bulk
GI - 5
$ 2.00
CY
50
100.00
40
80.00
10
20.00
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
400.00
320.00
RECEIVED
NOV 29 2021
80.00
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. CITY OF EDMONDS Version: 03/02/2015
20-019 Select 81st Ave W SP - Bond Quantity Worksheet.xlsx DEVELOPMENT Report Date: 11/29/2021
SERVICES DEPARTMENT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI -4
$ 35.00
SY
90
3,150.00
80
2,800.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
125
1,562.50
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
230
425.50
100
185.00
25
46.25
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
230
460.00
100
200.00
25
50.00
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
65
2,665.00
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk )
RI - 23
$ 3.00
SF
12
36.00
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
SUBTOTAL
8,299.00
385.00
RECEIVED
NOV 29 2021
2,896.25
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. CITY OF EDMONDS Version: 03/02/2015
20-019 Select 81st Ave W SP - Bond Quantity Worksheet.xlsx DEVELOPMENT Report Date: 11/29/2021
SERVICES DEPARTMENT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 S
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 S
RS - 6
$ 35.00
SY
90
3,150.00
36
1,260.00
HMA Road, 3", 9 1/2" Rock, Qty Over 250
RS - 7
$ 42.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1 ", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desig
RS - 15
Thickened Edge
RS - 17
$ 8.60
1 LF
1 231
197.801
841
722.40
Page 5 of 9
SUBTOTAL 3,347.80
1,982.40
RECEIVED
NOV 29 2021
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. CITY OF EDMONDS Version: 03/02/2015
20-019 Select 81st Ave W SP - Bond Quantity Worksheet.xlsx DEVELOPMENT Report Date: 11/29/2021
SERVICES DEPARTMENT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
$ 21.00
SY
Bollards - fixed
2
$
Each
Bollards - removable
ED-
3
240.74
$ .34
Each
a3OOO
(CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
1
1,500.00
2
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
3
450.00
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
1
170.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
88
880.00
Culvert, PVC, 6"
D - 19
$ 13.00
LF
8
104.00
10
130.00
120
1,560.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
13
299.00
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
Culvert, CMP, 36"
Culvert, CMP, 48"
D - 27
D - 28
D - 29
$ 78.00
$ 130.00
$ 190.00
LF
LF
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
NOV 29
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
403.00
1,630.00
6,060.00
ED
021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. Version: 03/02/2015
20-019 Select 81 st Ave W SP - Bond Quantity Worksheet.xlsx Report Date: 11 /29/2021
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
26
3380
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
1
1150
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
RECEIVED
NOV 29 2021
4530
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. CITY OF EDMONDS Version: 03/02/2015
20-019 Select 81 st Ave W SP - Bond Quantity Worksheet.xlsx DEVELOPMENT Report Date: 11 /29/2021
SERVICES DEPARTMENT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
5-ua.-n-T-7 Price
Quant. Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
1
15,000
Street Light Poles w/Luminaires
UP-2
Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Traffic Control
WI - 1
$ 1,000.00
Lump
1
1000
Water Service
WI - 2
$ 800.00
Ea.
2
1600
Sewer- 6" Cleanout
WI - 3
$ 200.00
Ea.
2
400
Sewer- 6" PVC
WI - 4
$ 28.00
LF
10
280
Sewer- 4" PVC
WI - 5
$ 25.00
LF
10
250.00
Mailbox Stand
WI - 6
$ 200.00
Ea.
1
200
Stormwater Channel Drain
WI - 7
$ 60.00
LF
12
720.00
French Drain
WI-8
$ 800.00
Lump
1
800.00
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
"KCC 27A authorizes only one bond reduction.
20-019 Select 81 st Ave W SP - Bond Quantity Worksheet.xlsx
18,480.00
1,770.00
30,929.80
4,317.40
15,336.25
9,278.94
1,295.22
4,600.88
40,208.74
5,612.62
19,937.13
B
C
D
RECEIVED
NOV 29 2021
Unit prices updated: 03/02/2015
CITY OF EDMONDS
Version: 03/02/2015
DEVELOPMENT
Report Date: 11/29/2021
SERVICES DEPARTMENT
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name:
PE Registration Number:
Firm Name: RAM Engineering, Inc.
Address: 16531 13th Ave W, Suite A108 Lynnwood WA 98037
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Rob Long, PE
36508
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Bend* Angetint (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
Date: 11 /29/2021
Tel. #: (425) 678-6960
Project No
FINANCIAL GUARANTEE REQUIREMENTS
PLN 2021-0007
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
(A) $ 9,750.0 SUBSTANTIAL COMPLETION ***
(B)
$
40,208.7
(C)
$
5,612.6
(D)
$
19,937.1
(A+B)
(T) $
Minimum is $2
Rob Long, PE
PERFORMANCE BOND AMOUNT:
$75,508.50 x 120% = $90,610.20
INSPECTION FEES:
$75,508.50 x 3.3% = $2,491.78
Tx0.30 $ '—'-5—
Minimum is $2000.
(B+C) x
0.25 = $ i i,454^FG'ti� z
Minimum is $2000.
Date: 11 /29/2021
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. RECEIVED
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to h: irA.c'l::,4^,+
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restorNOV 29 2021
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
CITY OF EDMONDS
DEVELOPMENT
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY SERVICES DEPARTMENT
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at.www.kin-qcounty.-goyli3ermits Version: 03/02/2015
20-019 Select 81st Ave W SP - Bond Quantity Worksheet.xlsx Report Date: 11/29/2021