Loading...
Engineering Permit Form_1OF WAY PERMIT PERMIT NUMBER City of Edmonds EdmondsRIGHT •:• • 1 1 www.cityofedmonds.gov• • Description: RIGHT OF WAY FOR NEW SFR 131 SKYLINE ISSUED: 01/27/2022 Address: 131 SKYLINE DR EDMONDS WA 98020 EXPIRES: 01/22/2023 rmit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00423000005300 i NAME TYPE NAME ADDRESS PHONE APPLICANT JOHN RIENTJES 13518 120TH AVE NE, KIRKLAND WA 98034 (425)864-3049 CONTACT JOHN RIENTJES 13518 120TH AVE NE, KIRKLAND WA 98034 (425)864-3049 CONTRACTOR D L SIGLER CONSTRUCTION 22027 NE 13TH PL, SAMMAMISH WA 98074- (425)269-0820 OWNER SUE EASTMAN\GERALD E KING 8433 SE 62ND ST, MERCER ISLAND WA 98040 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $1,100.00 $1,100.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW DATE Printed: Thursday, January 27, 2022 1:29:18 PM 1 of 2 KIRRMF WAY PERMIT City of Edmonds •:• •ENG2021-053 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. ROW COMPACTION TEST Right of way compaction tests are required per City standards. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE Adi A-1 TESC AND MOBILIZE E-7 CONCRETE SIDEWALK E-7 CURB GUTTER E-7 DWY APPROACH E-7 PAVEMENT COMPACTION TEST REPORT E-7 PVMT SUBGRADE E-7 RESTOR LIMITS E-7 SEWER LATERAL E-7 STORM CB E-7 STORM MAIN E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" Printed: Thursday, January 27, 2022 1:29:18 PM 2 of 2