Loading...
Building Permit'S IDENTIAL BLDG Permit PERMIT NUM City of Edmonds wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: KEITH AINSLEY Status: ISSUED Subtype: DECK Site Address: 7429 N MEADOWDALE RD EDMONDS,WA 98026- Parcel No: 00513103000900 Applied: 5/1/2021 4546 Subdivision: 005131 Lot: 0 Issued: 5/26/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $5,220.00 Occupancy Type: Construction Type: Expiration Date: 12/26/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: AINSLEY- 261 SQ FT LOWER DECK EXPANSION WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KEITH AINSLEY 7429 N. MEADOWDALE ROAD, (206)999-2370 AINSLEYK5320@GMAIL.COM EDMONDS WA 98026 CONTACT KEITH AINSLEY 7429 N. MEADOWDALE ROAD, (206)999-2370 AinsleyK5320@GMail.com EDMONDS WA 98026 CONTRACTOR OWNER OWNER KEITH A & PAMELA L AINSLEY 7429 N MEADOWDALE RD, (206)999-2370 EDMONDS WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/6/21 R12183 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 1 $231.00 $231.00 5/26/21 R12564 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $196.35 $196.35 5/6/21 R12183 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 5/26/21 R12564 TOTALS: $473.85 $473.85 • in, • Ii CONDITION TYPE STATUS NOTES It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Printed: Wednesday, May 26, 2021 1:19:26 PM 1 of 2 MIDENTIAL BLDG PermitCity • • • • PERMITNUM 98020 1 1. 1 www.edmondswa.gov • As required by Ord 3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including site excavation, shoring, soil support for foundation, including piles, soil bearing capacity, sub drainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written dated reports on the progress of the construction and submit the report to the City on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechnical report and or approved plans or specs shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of FOR more than one week. In addition to the geotechnical monitoring special inspections ESLHA REPORTS INFORMATION based on the provisions of IBC Section 1704 are required when specified. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record. At the completion of final site grading and all permitted structures a final geo technical report prepared by the geotechnical engineer shall be submitted to the City. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. •&Z-. •P ip 11 i • •'- • COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR DATE B-3 UNDERFLR FRAMING B-4 FRAMING X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Wednesday, May 26, 2021 1:19:26 PM 2 of 2