Building Permit'S IDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
wwm
www.edmondswa.gov
Type: RESIDENTIAL BLDG
Owner/ Business: KEITH AINSLEY
Status: ISSUED
Subtype: DECK
Site Address: 7429 N MEADOWDALE RD EDMONDS,WA 98026-
Parcel No: 00513103000900
Applied: 5/1/2021
4546
Subdivision: 005131
Lot: 0
Issued: 5/26/2021
Fire Sprinklers:
Lot Area: Zoning:
Final:
Valuation: $5,220.00
Occupancy Type: Construction Type:
Expiration Date: 12/26/2021
Code Edition: 0
No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: AINSLEY- 261 SQ FT LOWER DECK EXPANSION
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KEITH AINSLEY
7429 N. MEADOWDALE ROAD,
(206)999-2370
AINSLEYK5320@GMAIL.COM
EDMONDS WA 98026
CONTACT
KEITH AINSLEY
7429 N. MEADOWDALE ROAD,
(206)999-2370
AinsleyK5320@GMail.com
EDMONDS WA 98026
CONTRACTOR
OWNER
OWNER
KEITH A & PAMELA L AINSLEY
7429 N MEADOWDALE RD,
(206)999-2370
EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/6/21
R12183
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
1 $231.00
$231.00
5/26/21
R12564
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$196.35
$196.35
5/6/21
R12183
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
5/26/21
R12564
TOTALS: $473.85 $473.85
• in, • Ii
CONDITION TYPE
STATUS
NOTES
It is the owner's responsibility to repair/replace all
damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Printed: Wednesday, May 26, 2021 1:19:26 PM 1 of 2
MIDENTIAL BLDG PermitCity
• • • • PERMITNUM
98020 1 1. 1
www.edmondswa.gov •
As required by Ord 3632 the geotechnical engineer of record shall monitor this site during
construction for compliance with the recommendations in the geotechnical report
including site excavation, shoring, soil support for foundation, including piles, soil bearing
capacity, sub drainage installation, soil compactions, and other geotechnical aspects of
the construction. Specific recommendations contained in the approved geotechnical
report must be implemented by the owner. The geotechnical engineer shall make
written dated reports on the progress of the construction and submit the report to the
City on a weekly basis until all site grading, drainage, foundation and associated ground
work is complete. Omissions or deviations from the approved geotechnical report and or
approved plans or specs shall be highlighted and immediately submitted in a separate
letter to the City for review. The City shall be advised in writing of work stoppages of
FOR
more than one week. In addition to the geotechnical monitoring special inspections
ESLHA REPORTS
INFORMATION
based on the provisions of IBC Section 1704 are required when specified. Other special
inspections may also be required by the geotechnical engineer, architect, or structural
engineer of record. At the completion of final site grading and all permitted structures a
final geo technical report prepared by the geotechnical engineer shall be submitted to
the City. This report shall contain a statement that, based upon his/her professional
opinion, site observations, and testing during the monitoring of the construction, the
completed development substantially complies with the recommendations in the
geotechnical report and with all geotechnical related requirements. Any deviations or
omissions in the report, plans, or specifications that occurred during construction shall be
addressed separately. Occupancy, final approval, or release of the bond for the project
shall not be granted until the report has been reviewed and accepted by the Building
Official.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
•&Z-.
•P ip 11
i • •'- •
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
DATE
B-3 UNDERFLR FRAMING
B-4 FRAMING
X-3 BUILDING FINAL"
A-1 BUILDING PRECON
Printed: Wednesday, May 26, 2021 1:19:26 PM 2 of 2