Building Permit 2021Type: DEMO Subtype: RES SECONDARY DEMO I Status: ISSUED
Parcel No: 00434208501600 Site Address: 315 8TH AVE N EDMONDS,WA 98020-3412 Applied: 1/25/2022
Subdivision: SP S-8-80, 004342 Lot: 0 Issued: 2/2/2022
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 8/2/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC
Scope of Work: DUNN-DEMO, INTERIOR AND COVERED PATIO, PSCAA# 202200374
I WA State Contractor L & I #: FAIRBCC183C2 I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MAGGIE HANNA
15224 SUNWOOD BLVD 121,
(661)202-9743
MAGGIE.WAKEDESIGN@GMAIL.COM
TUKWILA WA 98188
CONTACT
MAGGIE HANNA
15224 SUNWOOD BLVD 121,
(661)202-9743
maggie.wakedesign@gmail.com
TUKWILA WA 98188
FAIRBANK CONSTRUCTION
220 MADISON AVENUE SOUTH,
mark.housmyer@fairbankconstructio
CONTRACTOR
(206)842-9217
CO INC
BAINBRIDGE ISLAND WA 98110
n.com
315 8TH AVE N, EDMONDS WA
OWNER
SUSAN E DUNN
98020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
1/27/22
R17682
PER PERMIT
DEMO - INTERIOR OR SECONDARY
001.000.322.10.000.00
$150.00
$150.00
1/27/22
R17682
STRUCTURE
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
1/27/22
R17682
TOTALS: $196.50
$196.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, February 02, 2022 2:16:26 PM 1 of 2
DEMO Permit
City of Edmonds PERMIT NUM
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONS - Schedule
Online
at: https://Inspection.MVBuildingPermit.com
COMPLETED
RESULT
SEQID
INSPECTION TYPE INSPECTOR
NOTES
DATE
X-3 BUILDING FINAL"
Printed: Wednesday, February 02, 2022 2:16:26 PM 2 of 2