Loading...
Building Permit 2021Type: DEMO Subtype: RES SECONDARY DEMO I Status: ISSUED Parcel No: 00434208501600 Site Address: 315 8TH AVE N EDMONDS,WA 98020-3412 Applied: 1/25/2022 Subdivision: SP S-8-80, 004342 Lot: 0 Issued: 2/2/2022 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 8/2/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: DUNN-DEMO, INTERIOR AND COVERED PATIO, PSCAA# 202200374 I WA State Contractor L & I #: FAIRBCC183C2 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MAGGIE HANNA 15224 SUNWOOD BLVD 121, (661)202-9743 MAGGIE.WAKEDESIGN@GMAIL.COM TUKWILA WA 98188 CONTACT MAGGIE HANNA 15224 SUNWOOD BLVD 121, (661)202-9743 maggie.wakedesign@gmail.com TUKWILA WA 98188 FAIRBANK CONSTRUCTION 220 MADISON AVENUE SOUTH, mark.housmyer@fairbankconstructio CONTRACTOR (206)842-9217 CO INC BAINBRIDGE ISLAND WA 98110 n.com 315 8TH AVE N, EDMONDS WA OWNER SUSAN E DUNN 98020 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/27/22 R17682 PER PERMIT DEMO - INTERIOR OR SECONDARY 001.000.322.10.000.00 $150.00 $150.00 1/27/22 R17682 STRUCTURE RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 1/27/22 R17682 TOTALS: $196.50 $196.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, February 02, 2022 2:16:26 PM 1 of 2 DEMO Permit City of Edmonds PERMIT NUM www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS FOR property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONS - Schedule Online at: https://Inspection.MVBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-3 BUILDING FINAL" Printed: Wednesday, February 02, 2022 2:16:26 PM 2 of 2