Loading...
ENG2022-0043 SIDE SEWER PERMITEWER PERMIT City of Edmonds 121 5th Ave N, Edmonds WA 98020' KEING2022-001431 . -. •. Description: SPOT REPAIR WITH A CLEAN OUT AND LINER TO THE PROPERTY LINE ISSUED: 02/04/2022 Address: 9216 217TH ST SW EDMONDS WA 98020-3942 EXPIRES: 05/05/2022 Permit Subtype: PARTIAL LINE Permit Type: SEWER Parcel Number: 00612900200700 REPLACEMENT CONTACTSIL NAME TYPE NAME ADDRESS PHONE APPLICANT DAVID PAUSER 2706 143RD ST SE, MILL CREEK WA 98012 (206)566-3528 CONTACT ALL CITY SEWER REPAIR, LLC 2706 143RD ST SE , MILL CREEK WA 98012-5014 (206)566-3528 CONTRACTOR ALL CITY SEWER REPAIR LLC 4730 UNIVERSITY WAY NE, SEATTLE WA 98105 (206)566-3528 OWNER WORKENEH GEBERTADIK 1 9216 217TH ST SW, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 SIDE SEWER PERMIT - PARTIAL REPLACEMENT $110.00 $110.00 gill REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION ..,7TED RELEASED BY— 12/04/2022 DATE Printed: Friday, February 04, 2022 2:20:12 PM 1 of 2 SEWER PERMIT City of Edmonds Ave N, Edmonds WA •:• •ENG2022-0043 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Handout E71 for SEWER ASBUILT requirements. PLEASE REFER TO STANDARD DETAILS SS-200, SS-201 AND, SS-202. STANDARD DETAILS CAN BE FOUND ON THE CITY OF EDMONDS WEBSITE. SDR35 WITH GASKETED FITTINGS IS REQUIRED FOR ALL SEWER REPAIRS. FOR ANY REPAIRS WHERE THERE IS MORE THAN ONE STICK OF PIPE, A PRESSURE SEWER REQUIREMENTS TEST IS REQUIRED. WHERE LINING OR PIPE BURSTING WATER AND TV TEST IS REQUIRED. IF THE 4-6 TRANSITION IS ENCOUNTERED, A 6" CLEANOUT IS REQUIRED AT THE PROPERTY LINE. THE 6" CLEANOUT SHALL HAVE A 12" CAST IRON LAMPHOLE COVER WITH 1/2 HEX BOLTS, GRIPPER TWIST PLUG, AND A 24" CONCRETE COLLAR. AN AS BUILT IS REQUIRED PRIOR TO FINAL OF THE PERMIT. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. WATER AND SEWER Maintain 10' of separation between the sanitary side sewer and the water service line. SEPARATION INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE E-2 SIDE SEWER X-2 ENGINEERING FINAL" E-2 TV AND WATER TEST Printed: Friday, February 04, 2022 2:20:12 PM 2 of 2 CITY OF EDMONDS M BuildingPermit.com Utilities Application #1087385 - Side sewer Repair with liner Applicant First Name Last Name Company Name David Pauser All City Sewer Repair Number Street Apartment or Suite Number E-mail Address 2706 143rd st SE allcitysewerrepairllc@gmail.com City State Zip Phone Number Extension Mill Creek WA 98012 (206)566-3528 Contractor Company Name ALL CITY SEWER REPAIR LLC Number Street Apartment or Suite Number 4730 UNIVERSITY WAY NE Ste-104 City State Zip Phone Number Extension SEATTLE WA 98105 (206)566-3528 State License Number License Expiration Date UBI # E-mail Address ALLCICS790KD 5/11/2023 5D47.1151 iP allcitysewerrepairllc@gmail.com Project Location Number Street Floor Number Suite or Room Number 9216 217TH ST SW City Zip Code County Parcel Number EDMONDS 98020 00612900200700 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Workeneh Gebertadik Hehn Number Street Apartment or Suite Number 9216 217TH ST SW City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 2/4/2022 Submitted By: David Pauser Page 1 of 2 CITY OF EDMONDS M BuildingPermit.com Utilities Application #1087385 - Side sewer Repair with liner Project Contact Company Name: All City Sewer Repair Name: David Pauser Email: allcitysewerrepairllc@gmail.com Address: 2706 143rd st SE Phone #: (206)566-3528 Mill Creek WA 98012 Project Type Activity Type Scope of Work Single Family Residential Utility Modification Side Sewer Repair Only Project Name: Side sewer Repair with liner Description of Work: Installing a two way clean out, trenching and lining with scrim liner to city property Project Details Project Information Repair Page 2 of 2