Building Permit 2021Type: PLUMBING Subtype: RESIDENTIAL PLUMBING I Status: ISSUED
Parcel No: 00515200001200
Subdivision: 006022, 005152
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 1235 CORONADO PL EDMONDS,WA 98020
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PLUMBING - WATER SERVICE LINE REPLACEMENT
Applied: 2/7/2022
Issued: 2/7/2022
Final:
Expiration Date:8/6/2022
Issued by: JOK
I WA State Contractor L & I #: DIRTCC1836BT I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KATHERYN MYERS
2615 RUSSELL WAY, EVERETT
(425)512-9652
KATHERYN@DIRTCHEAPINC.COM
WA 98204
CONTACT
DIRT CHEAP INC
2615 RUSSELL WAY, EVERETT
(425)512-9652
KATHERYN@DIRTCHEAPINC.COM
WA 98204
CONTRACTOR
DIRT CHEAP INC
2615 RUSSELL WAY #3, EVERETT
(425)451-2496
Katheryn@dirtcheapinc.com
WA 98024
1235 CORONADO PL S,
OWNER
MICHAEL D HANSHEW
EDMONDS WA 98020
DESCRIPTION
11'BASE
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
2/7/22
R17999
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
2/7/22
R17999
PER PERMIT
WATER SERVICE LINE - REPAIR OR
001.000.322.10.000.00
$15.00
$15.00
2/7/22
R17999
REPLACEMENT
TOTALS: $105.00
$105.00
CONDITION TYPE
STATUS
NOTES
Printed: Monday, February 07, 2022 3:30:52 PM 1 of 2
PLUMBING
Permit
Adak
-
Pr
City of • • •
••� i 1 1 .1
www.edmondswa.gov
FL
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
Refer to City of Edmonds Water service line handout for approved pipe materials,
WATER SERVICE HANDOUT
INFORMATION
inspections and other requirements.
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
FOR
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it
WATER SERVICE SHUTOFF
INFORMATION
enters the building.
' •NS
- Schedule •nline
at: https://Inspection.MVBuildingPermit.co
COMPLETED RESULT
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
X-0 PLUMBING FINAL"
B-3 PLUMB ROUGH IN
Printed: Monday, February 07, 2022 3:30:52 PM 2 of 2