Loading...
ENG2022-0042 ROW PERMITRIGHT OF WAY MINOR PERMIT PERMIT NUMBER City of Edmonds ..• • 1 11� www.cityofedmonds.gov• • Description: CRANE TO INSTALL CELLULAR EQUIPMENT UNDER BLD2021-1226 ISSUED: 02/10/2022 Address: 8505 BOWDOIN WAY - CELLULAR EDMONDS WA 98026-7325 EXPIRES: 08/09/2022 Permit Type: RIGHTOF WAY MINOR Permit Subtype: COMMERCIAL Parcel Number: 00373600501802 NAME TYPE NAME ADDRESS PHONE APPLICANT SCOT- BULLINGTON 333 RONLEE LANE NW, OLYMPIA WA 98502 (360)867-0198 CONTACT SNELL CRANE SERVICE INC 333 RONLEE LANE NW, OLYMPIA WA 98502 (360)867-0198 CONTRACTOR SNELL CRANE SERVICE INC 333 RON LEE LANE NW, OLYMPIA WA 98502 (360)867-0198 OWNER EDMONDS CITY OF 250 5TH AVENUE N, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 02/10/2022 RELEASED BY DATE Printed: Thursday, February 10, 2022 2:50:07 PM 1 of 2 WAY MINOR .UM PERMIT City of • • • Ave•:• • 1 1 1 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Restore landscape to like or better conditions. ENGINEERING OTHER Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. • INSPECTION TYPE DATE RESULT NOTES COMPLETE E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" Printed: Thursday, February 10, 2022 2:50:07 PM 2 of 2 Lti�y of ED%�O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. RESUB Feb 07 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name SE01626 Site Address or if no site address use Property Address at NW corner of project area: 8601 Bowdoin Way, Edmonds, WA 98026 Associated Permits: BLD PLN ENG • • • .• .• - Name of Company Franchise Ordinance No: Point of Contact Title Address City State Zip Phone Email Contractor and Authorized Agent of • note below) Name of Company Snell Crane Service • • • During Construction Primary Name Scott BUllington Agent Name Scott Title Dispatcher Title Disptacher Mobile 360.239.1217 Address333 Ronlee In NW Emailscott@snellcrane.com City Olympia State WA Zip98502 Secondary Name Andy Phone 360.239.1217 Title Manager Email scott@snellcrane.com Mobile 360.239.1257 City of Edmonds Business License No: Email andy@snellcrane.com State License No:601626799 56 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Stage mobile crane at North end of Summit Ln. Impact will not affect the turn into the tow buildings that use that road. We would barricade the whole area we are working in. Work will take two weeks starting 2/14/22 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: A telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. of Work to be CompletedNo Does the utility owner have existin overhead infrastructure in the area of work? 2. Will an equipment be added underground or above round (e.g. pedestals, vaults, etc.)? If es, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial develo ment? tX 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial develo ment to an existin under round common utili s stem? 5. Does the work involve proposed additions to an aboveground utility system? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of • to be Completed No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: '0,&-ctDATE: 2/2/2022 APPLICANT PRINTED NAME: Scott Bullington APPLICANT TITLE: Dispatcher NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE 7 00 a Applicant shall 1repair/replace all � damage to utilities or frontage improvements in City right-of-way per city standards that is caused or road closed occurs during the permitted project MI ahead o 0 it. I Y DO NOT BLOCK DRIVEWAY J f ENGINEERING DIVISION "7TED vie 02 TRAFFIC CONTROL REVIEW X. ONLY. SEE BLD2021-1226 FOR CELLULAR PERMIT. f Imagery ©2022 Google, Imagery ©2022 Maxar Technologies, U.S. Geological Survey, Map data ©2022 �. E I Feb 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT From: Scott Bullington <scott.bullington@snellcrane.com> Sent: Thursday, February 3, 2022 10:54 AM To: Edmonds Engineering Permits Subject: RE: RIGHT-OF-WAY Application Not Accepted ID#1085042 SE01626 Categories: Red category BLD2021-1226. Thanks for being patient. Work is scheduled to start for our ROW on 2/14/22 currently. From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Sent: Wednesday, February 2, 2022 4:30 PM To: Scott Bullington <scott.bullington@snellcrane.com> Subject: RE: RIGHT-OF-WAY Application Not Accepted ID#1085042 SE01626 Caution: External Email Hi Scott, Can you please confirm under which building permit number the work is being done? Thanks, Natalie City of Edmonds, Engineering Division Permitting EngineeringPermits@edmondswa.gov Natalie Griggs (she/her), Engineering Technician (425) 771-0220 ext. 1353 CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS. APPOINTMENTS MAY BE CONSIDERED FOR SPECIAL CIRCUMSTANCES. Development services will continue to be provided by email or the web and by phone. Please visit www.edmondswa.gov for up-to-date information on City services. For engineering permit inquiries, please email: engineeringpermits .edmondswa.gov For all other inquiries please email: devserv.admin(a).edmondswa.gov Web Map: www.maps.edmondswa.gov From: Scott Bullington <scott.bullington@snellcrane.com> Sent: Wednesday, February 2, 2022 2:21 PM To: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Subject: RE: RIGHT-OF-WAY Application Not Accepted ID#1085042 SE01626 Done From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Sent: Wednesday, February 2, 2022 1:58 PM To: Scott Bullington<scott.bullington@snellcrane.com>; Scott Bullington <scott.bullington@snellcrane.com> Subject: RIGHT-OF-WAY Application Not Accepted ID#1085042 SE01626 Caution: External Email Application ID: 1085042 Date Submitted: 2/1/2022 Applicant Name: Scott Bullington Project Name: SE01626 Reasons: Please fill out all three pages of the application and sign. Please reference the associated permit number on the first page of the application. To edit and resubmit this application, log into your account at https://epermit.mvbuildingpermit.com/Login.aspx, go to the Plan Review Dashboard and enter the Application ID in the Quick Search Field. Click on Edit and Resubmit to continue working on your application and resubmit. You may also delete the application if you choose to.