ENG2022-0041 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
Er",
-0041
www.cityofedmonds.gov
Description: PSE REPAIR GAS LEAK IN PAVEMENT ISSUED: 02/14/2022
Address: 7403 228TH ST SW EDMONDS WA 98026-8473
EXPIRES: 08/13/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27042900307700
iiii I 11-14111 a
NAME TYPE NAME ADDRESS PHONE
APPLICANT SUSAN SIDICK 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
CONTACT PUGET SOUND ENERGY- CORROSION 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
DEPARTMENT
CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
OWNER BRIAN & REBECCA WILLIS 7403 228TH ST SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
ENGINEERING INSPECTION FEE
$110.00 $110.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE
$330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
02/14/2022
RELEASED BY
DATE
Printed: Monday, February 14, 2022 8:29:40 AM 1 of 2
WAY EUC PERMIT
PERMITNUMBER,
City of Edmonds
Ave-KRWOF
•:• •ENG2022-001411
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL"
E-7 RESTOR LIMITS
Printed: Monday, February 14, 2022 8:29:40 AM 2 of 2
ofEOMoz
RECEIVED
RIGHT OF WAY CONSTRUCTION FEB 04 2022
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
p pp DEVELOPMENT
'Vci s')3 Requirements outlined in Right -of -Way permit Handout E6�. SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 892061172
Site Address or if no site address use Property Address at NW corner of project area: 7403 228 ST SW
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
State WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑Xommercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Repair gas leak at approx 15' N c/1 of 228th ST SW & 161' E c/1 of 74th PL W (1) 4x5 paving
_cut anticipated
RIGHT-OF-WAY
AREA
TOTAL
DURATION
CLOSURE
(Number of Months)
72 hours +
LF
x
LF
SF
—Sidewalk
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
- 2 DAYS
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power degas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existingunderground common utilitystem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
X
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Susan Sidick DATE: 02/03/22
APPLICANT PRINTED NAME: Susan Sidick
APPLICANT TITLE: SR Permit Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Job #: 892061172
PRE -INSPECTION REPORT 1111,
Date Received: 12/09/2021
Jurisdiction: Edmonds
Right of Way Permit? 21 YES ❑ NO
First Poss Start: 15D
First Poss Comp: 151)
Address: 7403 228th St SW
City / Zip: Edmonds, 98026
Cust Name:
Customer Email:
PM / Insp: Jennifer Bergman
Job Description / Scope of Work:
ILeak Repair
Est. Job Duration: 8 hrs
NEW CONST:
❑ YES 0 NO
Repair leak @ tie-in to 7403. Possible old stub.
IFS / PSE Dig
LEAK #N0130312
Service Work — No Stub Ftg: Ext Ftg: Tot Svc Ftg:
0'
Main Ext Work — No
PLAT MAP# 165 070 FIELD INSPECT-M.I.W.ON: BY:
t
11 II
N
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COA
RECEIVED
FEB 04 2022
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
a 7403
11TO
per city standards that is caused or
d
occurs during the permitted project.
S CITY OF EDMONDS
$
DEVELOPMENT
M
ti6"
SERVICES DEPARTMENT
p existinq 5/8" MPEI service
CUTS
0
o IN ROADWAY AND/OR
ENGINEERING DIVISION
u SIDEWALK SHALL REQUIRE
APPROVED AS NOTED
o ADDITIONAL INSPECTIONS
o AND FEES
^lQ/I (,�l�.iX,u...,,4p 02/10/2022
�
p VV area of leak reoair
2" STW IP cias main - 15' N C/L - 109036132-2007
0 0 0 0 0 0 0 0 0 0 0
t0
0 0 0 0 0 0 0 0 0
----------axistirw_water_-0JN-Cl---------
----------------- - - - - --
existing sewer - 4' S C/L
--------------------------------------------
228th St SW
--------------------------------------------
existina storm drain - 7' S C/L
Work Location
Size of Cut
Surface Type
15' N of CL 228th St SW & 161' E of CL 74th PI W
4 x 5
asphalt
of CL & of CL
of CL & of CL
❑✓ FLAGGERS #: 2 25 MPH ❑ TROLLEY LINES ❑ BUS STOP #: ❑ METER HOODS #:
❑ OFFICERS M SPEED LIMIT ❑ TRAFFIC ❑ ARTERIAL ❑✓ NO PARKS M 5
WORK TYPES
P i P
e S i z e EFV'S
Meters Qty. Pressure
Misc Meter Stuff
❑
❑
❑ COMMERCIAL ❑STUB ❑POTHOLE
1/2"
❑ 775
5/8
250 ❑ 6"wc
❑ Templ Bar Size:
❑ EXTENSION ❑MAIN MAINT.
❑✓ RESIDENTIAL
❑ COMPLETE
❑
❑✓
❑ 1800
3/4"
11/8" ❑ 2600
_
❑ 425 ❑ 2#
❑ Bollards 2.5" M
❑ MULTI -FAMILY ❑SERV MAINT.
❑ TWIN
❑
11/4" 10,000
_
❑ 630 ❑ � 5q
❑Bollards 4" #:
ALTER COMM SVC ❑VALVE MAINT.
❑NEW CONST. ❑
❑
❑
2"
4�� ❑ N/A
_ -
Fuel Line Permit
❑
❑ ALTER RESID. SVC ❑✓ LEAK REPAIR
❑
6„
❑ 1000
Fuel Line Length:
❑ CUT & CAP ❑ SERVICE REPL. ❑CP WORK
❑
8"
Mtr Loc: 8
Fuel Line Diameter:
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
V0Il03dSNI HIV 3�nI03HOS
� 4H3HV v
o �aoM
avow 13,13
-----------------------
TEMPORARY TRAFFIC CONTROL PLAN
J
CL #7403
----------------- -- -
_ -200' 200'
- --- _ — _
r b �
r �-200t1 200 i
W20-1
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Edmond standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 15' NCL of 228th St SW &
161' ECL of 74th PI W
7A
LEGEND
®
28" TRAFFIC CONE
®
WORK PIT
TRAFFIC FLOW
FLAGGER
WORK VEHICLE/
FLASHING LIGHTS
SIGN LOCATION
RIGHT OF WAY
ROW
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
SIGN SPACING
MPH
"XI.
60/65
1000,
45/55
500'
35/40
350'
30
200,
25
1 on,
W3-4
b-OZM
b L'OZM 0V3HV
p NaOM 4 i CL ¢¢¢ 6'OZM
avow I p Z o Y o
19,19 o o w
------------------------ k --- 4--
---------------------
228TH ST SW
Y��,E
PLACE SIGNS
BOTH SIDES OF
WORK AREA
CHANNELIZATION
DEVICE SPACING
MPH
TAPER
TANGENT
55/70
40
80
35/45
30
60
25/30
1 20
1 40
ZZOZ/o 4/ZO
4310N SV G3IAOcJdd!V
RECEIVED
FEB 04 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Puget Sound Energy REV
.S g Traffic Control Supervisor:
PUGET Gregory Harwood 01 /05/2022 0
SOUND Kali-Jamal Collins Card No.012238
ENERGY 425-424-6425 Card Ex .pham od@p3 Job #
gregory.phamood@pse.com
Kali-Jamal.Collins@pse.com (425)424-6425 892061172
Project Address: I
7403 228th St SW, Edmonds, WA Page 1 OF 1
RECEIVED
FEB 04 2022
CITY OF EDMONDS M BuildingPermit.com
CITY OF EDMONDS
Right -of -Way Application #1086769 - 892061172-7403 228 ST SW SERVI ESLOPMENT DEPARTMENT
Applicant
First Name Last Name Company Name
Susan Sidick Puget Sound Energy- Corrosion Department
Number Street Apartment or Suite Number E-mail Address
1660 Park Lane susan.sidick@pse.com
City State Zip Phone Number Extension
Burlington WA 98233 4254576353
Contractor
Company Name
PUGET SOUND ENERGY INC
Number Street Apartment or Suite Number
1660 Park Lane
City State Zip Phone Number Extension
Burlington WA 98233 (206) 716-2641
State License Number License Expiration Date UBI # E-mail Address
PUGETSE033DD 3/28/2023 17gD1nns i susan.sidick@pse.com
Project Location
Number Street Floor Number Suite or Room Number
7403 228TH ST SW
City Zip Code County Parcel Number
EDMONDS 98026 27042900307700
Associated Building Permit Number Tenant Name
892061172
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Brian & Rebecca Willis
Number Street Apartment or Suite Number
7403 228TH ST SW
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 2/3/2022 Submitted By: Susan Sidick
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1086769 - 892061172-7403 228 ST SW
Project Contact
Company Name: Puget Sound Energy- Corrosion
Department
Name: Susan Sidick Email: susan.sidick@pse.com
Address: 1660 Park Lane Phone #: 4254576353
Burlington WA 98233
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 892061172-7403 228 ST SW
Description of Work: Repair gas leak at approx 15' N c/I of 228th ST SW & 161' E c/I of 74th PL W (1) 4x5
paving cut anticipated
Project Details
Project Information
Job Number
892061172
Page 2 of 2