Building Permit 2021Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED
Parcel No: 00463301500400 Site Address: 8717 240TH ST SW lot 4 EDMONDS,WA 98026-
9018
Subdivision: 008410, 004633, SP 635 (11-78) Lot: 0
Fire Sprinklers: Yes Lot Area: 13141 Zoning: IRS-8
Valuation: $380,886.66 Occupancy Type: R-3 Construction Type: VB
Code Edition: 2018 No. Stories: 2 # of Dwelling Units: 1
Scope of Work: ADAMANT HOMES- NEW SFR P&M INCL. LOT 4
Applied: 8/9/2021
Issued:2/14/2022
Final:
Expiration Date: 2/9/2023
Issued by: NED
I WA State Contractor L & I #: ADAMAH1792LG I
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE EMAIL
APPLICANT
LOREE QUADE
PO BOX 14790, MILL CREEK WA
(425)422-9637
LOREE@ADAMANTHOMES.COM
98082
CONTACT
ADAMANT HOMES INC
PO BOX 14790, MILL CREEK WA
(425)422-9637
loree@adamanthomes.com
98082
CONTRACTOR
ADAMANT HOMES INC
PO BOX 14790, MILL CREEK WA
(425)422-9637
LOREE@ADAMANTHOMES.COM
98082
OWNER
ADAMANT HOMES INC
14790, MILL CREEK WA 98082
(425)318-7687
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
2/14/22
R18099
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
2/14/22
R18099
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
2/14/22
R18099
PUMP - 1.75 BTU OR LESS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
2/14/22
R18099
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/12/21
R13905
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$240.00
$240.00
2/14/22
R18099
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$770.00
$770.00
2/14/22
R18099
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$75.00
$75.00
2/14/22
R18099
FURNACE OR FIREPLACE
001.000.322.10.000.00
$90.00
$90.00
2/14/22
R18099
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
2/14/22
R18099
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$2,786.00
$2,786.00
2/14/22
R18099
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$2,368.10
$2,368.10
8/12/21
R13905
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
2/14/22
R18099
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$130.00
$130.00
2/14/22
R18099
FEE
Printed: Monday, February 14, 2022 3:23:49 PM 1 of 5
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE RECEIPT #
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$65.00
$65.00
2/14/22 R18099
FEE
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
2/14/22 R18099
EXPANSION TANK
TOTALS: $6,795.60 $6,795.60
CONDITIONS
CONDITION TYPE STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
O
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
CARBON MONOXIDE SYSTEMS
CARBON MONOXIDE SYSTEMS
NFORMATION
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Printed: Monday, February 14, 2022 3:23:49 PM 2 of 5
'RESIDENTIAL BLDG Permit
PERMIT NU
City of Edmonds
. ••0i 1 IC
. •. •
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
HOSE BIBBS
FOR
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
FOR
This property falls within the Olympic View Water and Sewer District. A permit from
OVWSD SEWER SERVICE
INFORMATION
Olympic View is required for the sanitary sewer installation.
OVWSD WATER LINE/METER
FOR
This property falls within the Olympic View Water and Sewer District. Contact Olympic
INFORMATION
View for specific water line and/or water meter information.
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 4 inches high with a half
inch min stroke width on a contrasting background.
FOR
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water
PRV REQUIRED
INFORMATION
shutoff.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
STORM COVENANT
O
A stormwater covenant shall be approved for recording prior to project final approval.
ORMATION
FOR
All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed
UNDERGROUND WIRING
INFORMATION
underground.
Printed: Monday, February 14, 2022 3:23:49 PM 3 of 5
: Permit
PERMIT NU
City of Edmonds
EdmondsU,
L121 5 hAve N, 98020 1 1
in
. •. •
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
WATER LINE ASBUILT
FOR
Owner/Contractor to provide water service line asbuilt at final inspection.
NFORMATION
FOR
Refer to City of Edmonds Water service line handout for approved pipe materials,
WATER SERVICE HANDOUT
INFORMATION
inspections and other requirements.
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
FOR
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it
WATER SERVICE SHUTOFF
INFORMATION
enters the building.
Installer shall provide the manufacturer installation, operating instructions, and a whole
FOR
WHOLE HOUSE FAN
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
Epp
• •
-. •
• •- •
C • •'- •
COMPLETED
SEQID INSPECTION TYPE
INSPECTOR
RESULT
NOTES
DATE
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
E-3 STRM COVENANT
E-3 STRM MGMT FACILITY
E-4 WATER SERVICE LINE
E-5 DRIVEWAY SLOPE
Printed: Monday, February 14, 2022 3:23:49 PM 4 of 5
Printed: Monday, February 14, 2022 3:23:49 PM 5 of 5