Loading...
Building Permit 2021Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED Parcel No: 00463301500400 Site Address: 8711 240TH ST SW lot 1 EDMONDS,WA 98026- 9018 Subdivision: 008410, 004633, SP 635 (11-78) Lot: 0 Fire Sprinklers: Lot Area: 9,151 Zoning: IRS-8 Valuation: $412,610.31 Occupancy Type: R3 Construction Type: VB Code Edition: 2018 No. Stories: 2 # of Dwelling Units: 1 Scope of Work: ADAMANT HOMES- NEW SFR P&M INCL. LOT 1 Applied: 8/9/2021 Issued:2/14/2022 Final: Expiration Date: 2/9/2023 Issued by: NED I WA State Contractor L & I #: ADAMAH1792LG I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LOREE QUADE PO BOX 14790, MILL CREEK WA (425)422-9637 LOREE@ADAMANTHOMES.COM 98082 CONTACT ADAMANT HOMES INC PO BOX 14790, MILL CREEK WA (425)422-9637 loree@adamanthomes.com 98082 CONTRACTOR ADAMANT HOMES INC PO BOX 14790, MILL CREEK WA (425)422-9637 LOREE@ADAMANTHOMES.COM 98082 8717 240TH ST SW, EDMONDS OWNER JODAR PAUL A WA 98026 FEE •' • DESCRIPTION ACCOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 2/14/22 R18098 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 2/14/22 R18098 PERMITS 2020 TRANSPORTATION IMPACT 112.502.345.86.000.00 $6,249.14 $6,249.14 2/14/22 R18098 FEE AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 2/14/22 R18098 PUMP - 1.75 BTU OR LESS AIR HANDLERS - 10,000 CFM OR 001.000.322.10.000.00 $30.00 $30.00 2/14/22 R18098 LESS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 2/14/22 R18098 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/9/21 R13806 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $240.00 $240.00 2/14/22 R18098 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $880.00 $880.00 2/14/22 R18098 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $75.00 $75.00 2/14/22 R18098 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 2/14/22 R18098 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 2/14/22 R18098 PARK IMPACT - ADMIN FEE RES 001.000.322.10.000.00 1 $50.00 1 $50.00 1 2/14/22 1 R18098 Printed: Monday, February 14, 2022 3:18:59 PM 1 of 5 -RESIDENTIAL BLDG PermitCity - • • • • 121 98020 1 1 www.edmondswa.gov DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # PARK IMPACT FEE - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 2/14/22 R18098 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,978.00 $2,978.00 2/14/22 R18098 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $2,531.30 $2,531.30 8/9/21 R13806 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 2/14/22 R18098 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $195.00 $195.00 2/14/22 R18098 FEE STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $799.00 $799.00 2/14/22 R18098 CHARGE SFR UNDER 5000 TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $50.00 $50.00 2/14/22 R18098 FEE - SFR WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 2/14/22 R18098 EXPANSION TANK TOTALS: $17,142.99 $17,142.99 CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR CARBON MONOXIDE SYSTEMS CARBON MONOXIDE SYSTEMS NFORMATION ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR SHORT PLAT IMPROVEMENTS SHALL BE COMPLETED PRIOR TO ISSUANCE OF FINAL ENGINEERING OTHER INFORMATION CERTIFICATE OF OCCUPANCY FOR THE SUBJECT SINGLE-FAMILY RESIDENCE. FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. Printed: Monday, February 14, 2022 3:18:59 PM 2 of 5 RESIDENTIAL: Permit - City •Edmonds 121 98020 1 1 1ka www.edmondswa.gov • FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 4 inches high with a half inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. FOR Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water PRV REQUIRED INFORMATION shutoff. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. STORM COVENANT FOR A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed UNDERGROUND WIRING INFORMATION underground. Printed: Monday, February 14, 2022 3:18:59 PM 3 of 5 : Permit EdmondsU, City of Edmonds PERMIT NUM L121 5 hAve N, 98020 1 1 . •. • in UTILITY LOCATES FOR INFORMATION All utilities shall be located prior to any excavation. New locates shall be called for if at time of excavation, original locates are no longer identifiable. WATER SERVICE HANDOUT FOR INFORMATION Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements. WATER SERVICE SHUTOFF FOR INFORMATION Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. WHOLE HOUSE FAN FOR INFORMATION Installer shall provide the manufacturer installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole house ventilation, see operating instructions". SEQID INSPECTION TYPE IN7COMPLEIED SULT RE NOTES A-1 PLANNING PRECONDATE A-1 BUILDING PRECON B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE E-1 CLEARING LIMITS E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-4 STRM STUB CONNECT E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE Printed: Monday, February 14, 2022 3:18:59 PM 4 of 5 Printed: Monday, February 14, 2022 3:18:59 PM 5 of 5