ENG2022-0004 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
• ••� 1 1 1 1
www.cityofedmonds.gov
10
Description: OVWSD-REPAIR WATER SERVICE LOCATED IN THE ASPHALT SIDEWALK
ISSUED: 02/15/2022
Address: 650 EDMONDS WAY EDMONDS WA 98020
EXPIRES: 08/14/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032500309400
Isle]
NAME TYPE NAME ADDRESS PHONE
APPLICANT
MARTY HENNINGER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
CONTACT
OLYMPIC VIEW WATER AND SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
DISTRICT
CONTRACTOR
OLYMPIC VIEW WATER & SEWER
EDMONDS WA 98026
(425)774-7769
DISTRICT
OWNER LAKESHORE INVESTMENT CORP PO BOX 4184, BELLEVUE WA 98009-4184
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
ENGINEERING INSPECTION FEE $220.00 $220.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
02/15/2022
RELEASED BY
DATE
Printed: Tuesday, February 15, 2022 7:39:27 AM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
L
11111
0
INSPECTION TYPE
DATE RESULT
NOTES
COMPLETE
E-7 RESTOR LIMITS
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL"
Printed: Tuesday, February 15, 2022 7:39:27 AM 2 of 2
ENG2022-0004
AA of EOAtp4
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
wc. 1890 Requirements outlined in Right -of -Way permit Handout E6.q.
1N3W1NVd30
If any field is not applicable to your project, write "XTCNA WW aving blank.
All fields required. Incomplete Applications -*fbLe$ee�.
a3Ai3a3N
SECTION A
Project Name V'Lo � S Gt
Site Address or if no site address use Property Address at NW ce r of project area: rl) E ✓�
Associated Permits: BLD PLN ENG
Owner and Entity Holdingapplicable)
Name of Companyo l 5 Franchise Ordinance No:
Point of Contact
Title rP
Address -2-b
City <1tJ✓1 State Zip %2
Phone Ll 2 2 (QC
Emailmoc-1,,c,&-o
LEI
Name of Company
Agent Name V
6"
Ke • • • 1 • •
PrimaryNamc
Title
'IStle O r
Mobile
Address P 12- 2
Email
City State
Zip U _ U
Secondary Name
Phone IZ 7 _ to I
Iltle
Email a 0 _
trCOY»
Mobile
City of Edmonds Busi ess License No:
Email
State License i\To:
❑ Contractor verifies it is currently bonded
p Contractor verifies it currently has general liability insurance
IPOTC: hCDC18.6o.ozo requires that the Application be signed by a licensed and bonded corn actor unless ornerwise approoea og me tiny
engineer.
T3,pe of Development - Clieck ALL that apply
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Single family -other ❑ Industrial
❑ Utility Franchise Work associated with development (clieck one of the above boxes as well)
❑ Traffic Control Only (no associated development)
)KQUtility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 2 hours +
LF
x
LF
SF
Parking 72 hours +
I LF
x
LF
SF
SECTION B -If you are not a utility company performing work in the City ROW, skin to SECTIONC.
1. The work in the right of ivay is on or for the following type of facilities::
❑ telecommunications ❑ cable o power a gas
�pCvater ❑ sewer o storm
1.. Does the utility owner have existing overhead infrastructure in the area of work?
2.
Will any equipment be added underground or above ground (e.. pedestals, vaults etc.)?
7
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does tine work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
5.
Does the work involve proposed additions to an above round utility system? If es:
Are the additions for the purpose of serving new comrnerciai development?
Are the additions for the purpose of sel-Ang a single-family residential subdivision?
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
Uroiect is Dronosed: _ ._. [Xl
_.
6a. I Does your prof
How man, are
to
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
Y
6b. I Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? What is the height of the additionalpoles?
6c. Are any poles to be niodifted/rebuilt/replaced? If yes: '
How many? What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety-- shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-3o5 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terns, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to complywith the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Tees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/202 r
*-LYMPIC VIEW WATER SEWER DISTRIGF
•
EDMONDS BLANKET PERMIT BEGINNING
NOTIFICATION
Site Address: 650 Edmonds Way
Scope of Work: Emergency repair of water service. Repair has been made.
Asphalt or Concrete Cut: Yes, sidewalk Start date: 12/31 /2021
Olympic View Water & Sewer District
8128 228th ST SW
Edmonds WA. 98026
Phone Number 425 774 7769
Fax Number 425 670 1856
Contact: Marty Henninger
E-mail: marty@ovwater.com
Olympic View Water & Sewer District
8128 228th ST SW
Edmonds WA. 98026
Phone Number 425 774 7769
Fax Number 425 670 1856
Contact: Bob Danson
E-mail: Bobd@ovwater.com
Traffic control shall be in accordance with the MUTCD.
® All flaggers shall be trained and certified as required by WAC 296-155-305.
® Restoration shall be in accordance with City of Edmonds standards.
® All asphalt or concrete cut surfaces shall be patched with City of Edmonds
approved materials prior to the end of the day.
O:ISHAREIPERMITS RIGHT OF WAYS\Edmonds
1N3wlaVd3a
S301A213S 1N3WdM3n30
SONOW03 d0 Ai10
zzoz co uer
RECEIVED
Jan 03 2022
DEVELO MFEEDMNDS N SOERVCES CITY OF EDMONDS MyBuildingPermit.com
DEPARTMENT
Right -of -Way Application #1071013 - 650 Edmonds Way
Applicant
First Name Last Name Company Name
Marty Henninger Olympic View Water and Sewer District
Number Street Apartment or Suite Number E-mail Address
8128 228th St SW marty@ovwater.com
City State Zip Phone Number Extension
Edmonds WA 98026 4257747769
Contractor
Company Name
Contractor Unknown
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
City Zip Code County Parcel Number
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Sidewalk Edmonds Way
Property Owner
First Name Last Name or Company Name
Number Street Apartment or Suite Number
City State Zip
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 1/3/2022 Submitted By: Marty Henninger
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1071013 - 650 Edmonds Way
Project Contact
Company Name: Olympic View Water and Sewer
District
Name: Marty Henninger Email: marty@ovwater.com
Address: 8128 228th St SW Phone #: 4257747769
Edmonds WA 98026
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 650 Edmonds Way
Description of Work: Repair water service located in the asphalt sidewalk on Edmonds Way. Repair has
been completed. Waiting to pave.
Project Details
Project Information
Job Number
2
Page 2 of 2
r
0
Jurisdiction: Edmonds
Project Name: 650 Edmonds Way
Application ID: 1071013
RECEIVED
Jan 03 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Supplemental Name: Authorization and Acknowledgment - Right of Way
Please Note: Contractors working in the Right of Way shall be Licensed and Bonded.
MyBuildingPermitxom
All provisions of laws and ordinances governing this type of work will be complied with. I certify under penalty of perjury that
the information provided on this application is true and correct and, further that I am authorized by the owner of the above
premises to perform the work for which the permit application is made. I further agree to hold harmless the City of Edmonds as
to any claim (including costs, expenses, and attorney's fees incurred in investigation and defense of such claim), which may be
made by any person, including the undersigned, and filed against the City of Edmonds, but only where such claim arises out of
the reliance of the City, including its officers and employees, upon the accuracy of the information supplied to the City as part of
this application.
I hereby authorize the City representatives to inspect my property Monday -Friday between the hours of 8:00 a.m. and 5:00 p.m.
during this permit application process for verification of site conditions.
I certify, under the penalty of perjury under the laws of the State of Washington, that the information and exhibits herewith
submitted are true and correct to the best of my knowledge and that I am authorized to file this application on behalf of the
owner of the subject property.
Yes, I authorize.
Electronic documents submitted to the City of Edmonds for plan review and permit issuance must be provided in a format that
does not prevent the City from making code comments on the documents during review or from making the documents ready for
permit issuance. Documents submitted in any manner that prevents the City from completing the review and permit issuance
process, including but not limited to submitting documents that are locked, may result in additional review time, permitting
delays, and/or cancellation of the permit application if the problem is not resolved by the applicant in a timely manner.
Please refer to chapter 18.43 RCW, chapter 18.210 RCW, chapter 196-23 WAC and chapter 196-33 WAC for Washington State
laws governing electronic documents. An interpretative guideline from the Board of Registration for Professional Engineers and
Land Surveyors can be found at http://www.dol.wa.gov/business/engineerslandsurveyors/docs/eDocsinterpretiveGuideline.pdf.
These laws and requirements are subject to change and the submitting parties are responsible for keeping apprised of any such
changes.
Please acknowledge that you understand these requirements and have verified the electronic documents being submitted meet
the City of Edmonds submittal requirements by checking the box below. If you have questions, contact the Engineering
Division at engineeringpermits@edmondswa.gov or 425-771 -0220.
Yes, I acknowledge.
The City of Edmonds makes permit applications available to the public in an effort to make its processes as transparent as
possible. By signing or initialing this document, I acknowledge that any and all information submitted as part of this application,
is public information. I further acknowledge and agree that this permit application, and any and all documents related
thereto, may be disclosed by the City of Edmonds to the public without redaction.
Please provide electronic signature below:
Marty Henninger
r
0
Jurisdiction: Edmonds
Project Name: 650 Edmonds Way
Application ID: 1071013
RECEIVED
Jan 03 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Supplemental Name: Right of Way Construction Terms and Conditions
MyBuildingPermitxom
Will Right of Way construction necessitate the closure of the right of way for a duration over 72 hours?
No, there are no right of way closures expected at this time.
Right of Way Closures- Please provide the area sf of the portion of right of way that will be closed over 72 hours
and the length of the closure (number of months) below.
Sidewalk Area (sf) of Closure
Sidewalk Duration of Closure (months)
Alley Area (sf) of Closure
Alley Duration of Closure (months)
Parkiing Strip Area (sf) of Closure
Parking Strip Duration of Closure (months)
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers,
employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen,
including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its
subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable,
arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the
failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These
indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval.
Right of Way Terms and Conditions
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the
City Engineer or their respective designee. Every flagger must be trained as required by WAC 296-1 55-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit
approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this
Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer or
their respective designee. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all
applicable city ordinances, including but not limited to Edmonds Community Development Code 1 8.00; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and
bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf
and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
Owner/Applicant Signature
Marty Henninger
��pc' I 60606 — �En—Z8 tO1600Z — -- - ❑ I L—Z d 2 1G
la ,9 II 1661-yL00 _ -a i I coo
— - - - -- 969zz 969819
o
9 Id HLLW��)_ o
do 1 pp/ I 96606 1 66606 1 6£606
I '
W�
-ze ^' 9092'z 9099N I I 06 80�06 62�06 _
� - N < 609zz 62'9
it
06d \ 4 o 2—Z9 I Z—Z8
\\ `i �9 p
3N07 O-bG !) : R I� „R t—
LA Z8
LOOZ-9Z L50 - tL6 6-1SIa 0 C� 1a ZA-za ®�066 l 1900Z Ia , 8 Ll L:2FI I U Ia 8 �68i
'\.
70
c T - N Zvi JL ►TL9
G2�06��)
z
NGINEERING DIVIS
....' .....,7T
60906
6z9 // 96906OWNER/CONTRACT(
Ep EROSION CONT
—z8 z£� i / aI1\II7,9 �,�0 \ `. \ `•� 91—Z8 / 869 J OWNER/CONTRACT
7�1,LI�I,'�Q� 60 \ ��\ / / l ALL ON SITE UTILITIE
I I ,yt-99
i Applica hall repair/replace all
��, ✓�'�° °° \6��(�'� ! / dama t4ities-or fi ontag�
®� w° 6£9 \ 1, � 909 / improve nts in City right-of-way
- 9£1 9perI 69,�° \O \c��\ ��� �` ' occurlsyd g thespeamitted pro a tr
— — ��� �° , Vic"•. \ /� \ 009 / Doti
691, 06G I \ �` 099 i
669 i 609
l �L /I69 92 9
RECEIVED
I 1 669 i \ \��O 0a9 I - - -- - - -
66l, £69 669 \\
`<<S 609 `��� n 03 2022
`ITY OF EDMONDS
\ 900Z- Z L90 \ � \ �` LOPMENT RTMENTVICES
C `\ DEPARTMENT
1 9 A�Id -\y��� I SCHff151JLE ALL INSPECTIONS THROUGH MYBU/L!
o6,c \ ,
099 I 6£606 1,60906 1 66906
�� I 90906 - I 90006 /1O,G06Vl i
999 ''d� \� \ 9£9 i 110906
099
I 6z906 -- -
n n n Il rA —w n n rr-%
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
MINIMUM LANE: CLOSURE TAPER LENGTH - L (feet)
LANE
WIDTH
Postod Spood (mph)
(fppt)
25
30
35
40
45
5p
55
60
1 65
70
10
105
1SD
205
270
45D
500
550
11
115
165
225
295
495
55D
605
66C
-
-
12
125
100
245
720
540
600
1 66D
720
1 780
840
MINIMUM SHOULDER TAPER LENGTH a L/3 (foot)
SHOULDER
WIDTH
POStOd Spood (mph)
(1"1
25
3D
35
40
45 50
S5
6D
65
70
&
40
40
W
90
1 120 130
150
160
T70
19D
10,
40
W
90
90
1 150 170
19D
20D
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN 8.
SIGN SPACING M X (1)
FREEWAYS & E%pRESSWAYS 55 170 MPH 1500,t
RURAL HIGHWAYS W 165 MPH 8002
RURAL ROADS 45 155 MPH Xo,z
RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'1
RURAL ROADS & URBAN ARTERIALS 25 130 MPH 2OD2 (2)
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100'n (2)
(1)ALL SPACING MAY BE ADJUSTED 70 ACCOMMODATE INTERCHANGE
RAMPS,AT-GRADE INTERSEC'(IONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
CHANNELIZATION DEVICE
SPACING foot
MPH I
TAPER
I TANGENT
0 7
50
40
80
W45
30
60
2v30
1 20
1 40
BUFFER DATA
LONGITUDINAL BUFFER SPACE - B
SPEED (MPH)
25
30
35
40
45
50
55
60
GS
70
LENGTH (1-11
155
200
250
305
360
A25
a95
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE R
HOST VEHICLE WEIGHT
9,eD0 TO 22.000 Ibn.
HOST VEHICLE WEIGHT
22.000 lb,
< 45 MPH
45.55 MPH
55 MPH
< 45 MPH
45.55 MPH
> 55 MPH
10D'
in,
17:
14
1.1,
150'
PCMS
® ® ®100 RIOHT + MILE
® LANE AHEAD
0 ® CLOSURC
W
UG3 SEE 2.0 SEC z0 SEC
NOTE 4 FIELD LOCATE 1 MILE 3 IN
IF PERFORMING % X % L D ADVANCE OF LANE CLOSURE SIGNING.
R 100'i
WORK FROM
PRIVATE ROAD 48" 48 Applicanlshallrepair/replaceall ENGINEERING DIVISION
PROPERTY WDRR damage nts ities or frontage
E improvements in City right-of-way , )TED
I AHEAD per city standards that is caused or
MODIFYSIGNS 48' 48* occurs during the permitted project.
ACCORDINGLY. 1N201 40' W4-2(L) RECEIVED - �J 11/26/2022
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING NOTES
R16HTLANE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
CLOSED
UTILITIES MAY REQUIRE A SEPERATE PERMIT. Jan 03 2022 1. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
LEGEND AHEAD 2. EXTEND DEVICE TAPER AT U3 ACROSS SHOULDER.
48' OWNER/CONTRACTOR IS RESPONSIBLE FOR CITY OF EDMONDS 3. DEVICES SHALL NOT ENCROACH lN70 THE ADJACENT LANE.
CI TEMPORARY SIGN LOCATION EROSION CONTROLAND DRAINAGE DEVELOPMENT SERVICES
® W20-SR DEPARTMENT 4, USE TRANSVERSE DEVICES IN CLOSED LANE EVERY 1000'(FT)
TRAFFIC SAFETY DRUM (RECOMMENDED).
()� SEQUENTIAL ARROW SIGN 5. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE
TRANSPORTABLE Al IENUATOR SINGLE -LANE CLOSURE FOR MULTI -LANE ROADWAYS 2D(FT).
PORTABLE CHANGEABLE MESSAGE SIGN rPC(VI$
6. ALL SIGNS ARE BLACK ON ORANGE,
NOT TO SCALE
FlIME I� NAME 1:IDoal n H PA S1FSicntlartl.l]-Pion sheet Uaa 0]•P5L Work 1n P rvaaWeml C1-TL17 Duffer Dou unle re 1.4em.nNTGI.tl n 4� PIOf 1
r'nD:31 AM FEOAtO PROJ.NO.
DAr[ rDpina W
PLOWAS �/® TC3m
TRD OY III
DC.StONED BY
BNreReO BY Washington $tti ,<t�
eHeCKCD BY Dopartmont of Transportation
PRQI. CNG0. °r
TRAFFIC CONTROL PLAN
RCGIDNAI ADM. RPVISION DATE BY n "''° vem