Loading...
ENG2022-0004 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds • ••� 1 1 1 1 www.cityofedmonds.gov 10 Description: OVWSD-REPAIR WATER SERVICE LOCATED IN THE ASPHALT SIDEWALK ISSUED: 02/15/2022 Address: 650 EDMONDS WAY EDMONDS WA 98020 EXPIRES: 08/14/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032500309400 Isle] NAME TYPE NAME ADDRESS PHONE APPLICANT MARTY HENNINGER 8128 228TH ST SW, EDMONDS WA 98026 (425)774-7769 CONTACT OLYMPIC VIEW WATER AND SEWER 8128 228TH ST SW, EDMONDS WA 98026 (425)774-7769 DISTRICT CONTRACTOR OLYMPIC VIEW WATER & SEWER EDMONDS WA 98026 (425)774-7769 DISTRICT OWNER LAKESHORE INVESTMENT CORP PO BOX 4184, BELLEVUE WA 98009-4184 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $220.00 $220.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 02/15/2022 RELEASED BY DATE Printed: Tuesday, February 15, 2022 7:39:27 AM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. L 11111 0 INSPECTION TYPE DATE RESULT NOTES COMPLETE E-7 RESTOR LIMITS E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" Printed: Tuesday, February 15, 2022 7:39:27 AM 2 of 2 ENG2022-0004 AA of EOAtp4 RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal wc. 1890 Requirements outlined in Right -of -Way permit Handout E6.q. 1N3W1NVd30 If any field is not applicable to your project, write "XTCNA WW aving blank. All fields required. Incomplete Applications -*fbLe$ee�. a3Ai3a3N SECTION A Project Name V'Lo � S Gt Site Address or if no site address use Property Address at NW ce r of project area: rl) E ✓� Associated Permits: BLD PLN ENG Owner and Entity Holdingapplicable) Name of Companyo l 5 Franchise Ordinance No: Point of Contact Title rP Address -2-b City <1tJ✓1 State Zip %2 Phone Ll 2 2 (QC Emailmoc-1,,c,&-o LEI Name of Company Agent Name V 6" Ke • • • 1 • • PrimaryNamc Title 'IStle O r Mobile Address P 12- 2 Email City State Zip U _ U Secondary Name Phone IZ 7 _ to I Iltle Email a 0 _ trCOY» Mobile City of Edmonds Busi ess License No: Email State License i\To: ❑ Contractor verifies it is currently bonded p Contractor verifies it currently has general liability insurance IPOTC: hCDC18.6o.ozo requires that the Application be signed by a licensed and bonded corn actor unless ornerwise approoea og me tiny engineer. T3,pe of Development - Clieck ALL that apply ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Single family -other ❑ Industrial ❑ Utility Franchise Work associated with development (clieck one of the above boxes as well) ❑ Traffic Control Only (no associated development) )KQUtility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 2 hours + LF x LF SF Parking 72 hours + I LF x LF SF SECTION B -If you are not a utility company performing work in the City ROW, skin to SECTIONC. 1. The work in the right of ivay is on or for the following type of facilities:: ❑ telecommunications ❑ cable o power a gas �pCvater ❑ sewer o storm 1.. Does the utility owner have existing overhead infrastructure in the area of work? 2. Will any equipment be added underground or above ground (e.. pedestals, vaults etc.)? 7 If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does tine work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an above round utility system? If es: Are the additions for the purpose of serving new comrnerciai development? Are the additions for the purpose of sel-Ang a single-family residential subdivision? 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the Uroiect is Dronosed: _ ._. [Xl _. 6a. I Does your prof How man, are to City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 Y 6b. I Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? What is the height of the additionalpoles? 6c. Are any poles to be niodifted/rebuilt/replaced? If yes: ' How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety-- shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-3o5 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terns, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to complywith the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Tees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/202 r *-LYMPIC VIEW WATER SEWER DISTRIGF • EDMONDS BLANKET PERMIT BEGINNING NOTIFICATION Site Address: 650 Edmonds Way Scope of Work: Emergency repair of water service. Repair has been made. Asphalt or Concrete Cut: Yes, sidewalk Start date: 12/31 /2021 Olympic View Water & Sewer District 8128 228th ST SW Edmonds WA. 98026 Phone Number 425 774 7769 Fax Number 425 670 1856 Contact: Marty Henninger E-mail: marty@ovwater.com Olympic View Water & Sewer District 8128 228th ST SW Edmonds WA. 98026 Phone Number 425 774 7769 Fax Number 425 670 1856 Contact: Bob Danson E-mail: Bobd@ovwater.com Traffic control shall be in accordance with the MUTCD. ® All flaggers shall be trained and certified as required by WAC 296-155-305. ® Restoration shall be in accordance with City of Edmonds standards. ® All asphalt or concrete cut surfaces shall be patched with City of Edmonds approved materials prior to the end of the day. O:ISHAREIPERMITS RIGHT OF WAYS\Edmonds 1N3wlaVd3a S301A213S 1N3WdM3n30 SONOW03 d0 Ai10 zzoz co uer RECEIVED Jan 03 2022 DEVELO MFEEDMNDS N SOERVCES CITY OF EDMONDS MyBuildingPermit.com DEPARTMENT Right -of -Way Application #1071013 - 650 Edmonds Way Applicant First Name Last Name Company Name Marty Henninger Olympic View Water and Sewer District Number Street Apartment or Suite Number E-mail Address 8128 228th St SW marty@ovwater.com City State Zip Phone Number Extension Edmonds WA 98026 4257747769 Contractor Company Name Contractor Unknown Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number City Zip Code County Parcel Number Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Sidewalk Edmonds Way Property Owner First Name Last Name or Company Name Number Street Apartment or Suite Number City State Zip Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 1/3/2022 Submitted By: Marty Henninger Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1071013 - 650 Edmonds Way Project Contact Company Name: Olympic View Water and Sewer District Name: Marty Henninger Email: marty@ovwater.com Address: 8128 228th St SW Phone #: 4257747769 Edmonds WA 98026 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: 650 Edmonds Way Description of Work: Repair water service located in the asphalt sidewalk on Edmonds Way. Repair has been completed. Waiting to pave. Project Details Project Information Job Number 2 Page 2 of 2 r 0 Jurisdiction: Edmonds Project Name: 650 Edmonds Way Application ID: 1071013 RECEIVED Jan 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Supplemental Name: Authorization and Acknowledgment - Right of Way Please Note: Contractors working in the Right of Way shall be Licensed and Bonded. MyBuildingPermitxom All provisions of laws and ordinances governing this type of work will be complied with. I certify under penalty of perjury that the information provided on this application is true and correct and, further that I am authorized by the owner of the above premises to perform the work for which the permit application is made. I further agree to hold harmless the City of Edmonds as to any claim (including costs, expenses, and attorney's fees incurred in investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the City of Edmonds, but only where such claim arises out of the reliance of the City, including its officers and employees, upon the accuracy of the information supplied to the City as part of this application. I hereby authorize the City representatives to inspect my property Monday -Friday between the hours of 8:00 a.m. and 5:00 p.m. during this permit application process for verification of site conditions. I certify, under the penalty of perjury under the laws of the State of Washington, that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on behalf of the owner of the subject property. Yes, I authorize. Electronic documents submitted to the City of Edmonds for plan review and permit issuance must be provided in a format that does not prevent the City from making code comments on the documents during review or from making the documents ready for permit issuance. Documents submitted in any manner that prevents the City from completing the review and permit issuance process, including but not limited to submitting documents that are locked, may result in additional review time, permitting delays, and/or cancellation of the permit application if the problem is not resolved by the applicant in a timely manner. Please refer to chapter 18.43 RCW, chapter 18.210 RCW, chapter 196-23 WAC and chapter 196-33 WAC for Washington State laws governing electronic documents. An interpretative guideline from the Board of Registration for Professional Engineers and Land Surveyors can be found at http://www.dol.wa.gov/business/engineerslandsurveyors/docs/eDocsinterpretiveGuideline.pdf. These laws and requirements are subject to change and the submitting parties are responsible for keeping apprised of any such changes. Please acknowledge that you understand these requirements and have verified the electronic documents being submitted meet the City of Edmonds submittal requirements by checking the box below. If you have questions, contact the Engineering Division at engineeringpermits@edmondswa.gov or 425-771 -0220. Yes, I acknowledge. The City of Edmonds makes permit applications available to the public in an effort to make its processes as transparent as possible. By signing or initialing this document, I acknowledge that any and all information submitted as part of this application, is public information. I further acknowledge and agree that this permit application, and any and all documents related thereto, may be disclosed by the City of Edmonds to the public without redaction. Please provide electronic signature below: Marty Henninger r 0 Jurisdiction: Edmonds Project Name: 650 Edmonds Way Application ID: 1071013 RECEIVED Jan 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Supplemental Name: Right of Way Construction Terms and Conditions MyBuildingPermitxom Will Right of Way construction necessitate the closure of the right of way for a duration over 72 hours? No, there are no right of way closures expected at this time. Right of Way Closures- Please provide the area sf of the portion of right of way that will be closed over 72 hours and the length of the closure (number of months) below. Sidewalk Area (sf) of Closure Sidewalk Duration of Closure (months) Alley Area (sf) of Closure Alley Duration of Closure (months) Parkiing Strip Area (sf) of Closure Parking Strip Duration of Closure (months) Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Right of Way Terms and Conditions Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer or their respective designee. Every flagger must be trained as required by WAC 296-1 55-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer or their respective designee. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to Edmonds Community Development Code 1 8.00; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. Owner/Applicant Signature Marty Henninger ��pc' I 60606 — �En—Z8 tO1600Z — -- - ❑ I L—Z d 2 1G la ,9 II 1661-yL00 _ -a i I coo — - - - -- 969zz 969819 o 9 Id HLLW��)_ o do 1 pp/ I 96606 1 66606 1 6£606 I ' W� -ze ^' 9092'z 9099N I I 06 80�06 62�06 _ � - N < 609zz 62'9 it 06d \ 4 o 2—Z9 I Z—Z8 \\ `i �9 p 3N07 O-bG !) : R I� „R t— LA Z8 LOOZ-9Z L50 - tL6 6-1SIa 0 C� 1a ZA-za ®�066 l 1900Z Ia , 8 Ll L:2FI I U Ia 8 �68i '\. 70 c T - N Zvi JL ►TL9 G2�06��) z NGINEERING DIVIS ....' .....,7T 60906 6z9 // 96906OWNER/CONTRACT( Ep EROSION CONT —z8 z£� i / aI1\II7,9 �,�0 \ `. \ `•� 91—Z8 / 869 J OWNER/CONTRACT 7�1,LI�I,'�Q� 60 \ ��\ / / l ALL ON SITE UTILITIE I I ,yt-99 i Applica hall repair/replace all ��, ✓�'�° °° \6��(�'� ! / dama t4ities-or fi ontag� ®� w° 6£9 \ 1, � 909 / improve nts in City right-of-way - 9£1 9perI 69,�° \O \c��\ ��� �` ' occurlsyd g thespeamitted pro a tr — — ��� �° , Vic"•. \ /� \ 009 / Doti 691, 06G I \ �` 099 i 669 i 609 l �L /I69 92 9 RECEIVED I 1 669 i \ \��O 0a9 I - - -- - - - 66l, £69 669 \\ `<<S 609 `��� n 03 2022 `ITY OF EDMONDS \ 900Z- Z L90 \ � \ �` LOPMENT RTMENTVICES C `\ DEPARTMENT 1 9 A�Id -\y��� I SCHff151JLE ALL INSPECTIONS THROUGH MYBU/L! o6,c \ , 099 I 6£606 1,60906 1 66906 �� I 90906 - I 90006 /1O,G06Vl i 999 ''d� \� \ 9£9 i 110906 099 I 6z906 -- - n n n Il rA —w n n rr-% SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM MINIMUM LANE: CLOSURE TAPER LENGTH - L (feet) LANE WIDTH Postod Spood (mph) (fppt) 25 30 35 40 45 5p 55 60 1 65 70 10 105 1SD 205 270 45D 500 550 11 115 165 225 295 495 55D 605 66C - - 12 125 100 245 720 540 600 1 66D 720 1 780 840 MINIMUM SHOULDER TAPER LENGTH a L/3 (foot) SHOULDER WIDTH POStOd Spood (mph) (1"1 25 3D 35 40 45 50 S5 6D 65 70 & 40 40 W 90 1 120 130 150 160 T70 19D 10, 40 W 90 90 1 150 170 19D 20D 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN 8. SIGN SPACING M X (1) FREEWAYS & E%pRESSWAYS 55 170 MPH 1500,t RURAL HIGHWAYS W 165 MPH 8002 RURAL ROADS 45 155 MPH Xo,z RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'1 RURAL ROADS & URBAN ARTERIALS 25 130 MPH 2OD2 (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'n (2) (1)ALL SPACING MAY BE ADJUSTED 70 ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSEC'(IONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. CHANNELIZATION DEVICE SPACING foot MPH I TAPER I TANGENT 0 7 50 40 80 W45 30 60 2v30 1 20 1 40 BUFFER DATA LONGITUDINAL BUFFER SPACE - B SPEED (MPH) 25 30 35 40 45 50 55 60 GS 70 LENGTH (1-11 155 200 250 305 360 A25 a95 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE R HOST VEHICLE WEIGHT 9,eD0 TO 22.000 Ibn. HOST VEHICLE WEIGHT 22.000 lb, < 45 MPH 45.55 MPH 55 MPH < 45 MPH 45.55 MPH > 55 MPH 10D' in, 17: 14 1.1, 150' PCMS ® ® ®100 RIOHT + MILE ® LANE AHEAD 0 ® CLOSURC W UG3 SEE 2.0 SEC z0 SEC NOTE 4 FIELD LOCATE 1 MILE 3 IN IF PERFORMING % X % L D ADVANCE OF LANE CLOSURE SIGNING. R 100'i WORK FROM PRIVATE ROAD 48" 48 Applicanlshallrepair/replaceall ENGINEERING DIVISION PROPERTY WDRR damage nts ities or frontage E improvements in City right-of-way , ­ )TED I AHEAD per city standards that is caused or MODIFYSIGNS 48' 48* occurs during the permitted project. ACCORDINGLY. 1N201 40' W4-2(L) RECEIVED - �J 11/26/2022 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING NOTES R16HTLANE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY CLOSED UTILITIES MAY REQUIRE A SEPERATE PERMIT. Jan 03 2022 1. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. LEGEND AHEAD 2. EXTEND DEVICE TAPER AT U3 ACROSS SHOULDER. 48' OWNER/CONTRACTOR IS RESPONSIBLE FOR CITY OF EDMONDS 3. DEVICES SHALL NOT ENCROACH lN70 THE ADJACENT LANE. CI TEMPORARY SIGN LOCATION EROSION CONTROLAND DRAINAGE DEVELOPMENT SERVICES ® W20-SR DEPARTMENT 4, USE TRANSVERSE DEVICES IN CLOSED LANE EVERY 1000'(FT) TRAFFIC SAFETY DRUM (RECOMMENDED). ()� SEQUENTIAL ARROW SIGN 5. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE TRANSPORTABLE Al IENUATOR SINGLE -LANE CLOSURE FOR MULTI -LANE ROADWAYS 2D(FT). PORTABLE CHANGEABLE MESSAGE SIGN rPC(VI$ 6. ALL SIGNS ARE BLACK ON ORANGE, NOT TO SCALE FlIME I� NAME 1:IDoal n H PA S1FSicntlartl.l]-Pion sheet Uaa 0]•P5L Work 1n P rvaaWeml C1-TL17 Duffer Dou unle re 1.4em.nNTGI.tl n 4� PIOf 1 r'nD:31 AM FEOAtO PROJ.NO. DAr[ rDpina W PLOWAS �/® TC3m TRD OY III DC.StONED BY BNreReO BY Washington $tti ,<t� eHeCKCD BY Dopartmont of Transportation PRQI. CNG0. °r TRAFFIC CONTROL PLAN RCGIDNAI ADM. RPVISION DATE BY n "''° vem