ENG2020-0461 REVISION 1RIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
046]
www.cityofedmonds.gov
777
Description: PUD-PHASE 2 OF 4 TO CONVERT & REMOVE 6 POLES & WIRES
ISSUED: 08/05/2021
Address: 102 MAIN ST EDMONDS WA 98020-3132
EXPIRES: 02/05/2022
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00454800300700
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216
CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216
OWNER TRINITY UNITED GROUP LLC PO BOX 84325, SEATTLE WA 98124
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $0.00
ENGINEERING INSPECTION FEE
$110.00 $0.00
ENGINEERING REVISION REVIEW FEE
$110.00 $0.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE
$330.00 $0.00
•
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
08/05/2021
RELEASED BY v DATE
ENGINEERING DIVISION
"DTED SEE PAGE 6 FOR REVISION 1
�6 12/18/2022
Printed: Thursday, August 05, 2021 1:02:09 PM 1 of 2
Y. -RWOF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
f 121 5th Ave N, Edmonds WA 98020 ENG2020-0461
--- - www.cityofedmonds.gov / 425.771.0220
CONDITIONS
_ INSPECTIONS
INSPECTION
• DATECOMPLETE®�
in
X-2 ENGINEERING FINAL"
.; START
E-7 CONCRETE SIDEWALK
E-7 CURB GUTTER
Printed: Thursday, August 05, 2021 1:02:09 PM 2 of 2
0 \:L L?,11(7.
ANC. 1 s`) u
PROJECT NAME:
PUD WO #100061120 - PHASE 2 RECEIVED 11/5/20
ROW PERMIT NO.: ENG 2020-0461
ISSUE DATE: 8/5/21
RIGHT-OF-WAY CONSTRUCTION
PERMIT APPLICATION
Phase 2 - OH to UG
CONTRACTOR: SNOPUD
Mailing Address: 1802 75th St SW, MS 02
PO Box 1107, Everett 98206
State License #:
City Business License #:
CONTACT: Richard Dumo
Phone #: 425-783-5110
Fax #:
Email #: rsdumo@snopud.com
❑ Liability Insurance ❑ Bonded
ADDRESS OR INTERSECTION OF CONSTRUCTION: 102 Main St. & Sunset Ave, Edmonds WA 98020
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT:
❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only)
❑ Multi -Family ❑ Single Family
K EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket permit?
ANY ASSOCIATED PERMITS?
❑ Other
❑ Yes X❑ No
BLD# ENG#
DESCRIPTION OF PROPOSED WORK (Be Specific) : This is Phase 2 of 4 to convert and remove (6)
Poles & Wires at Railroad Street. Phase 2 Scope: Bore conduits across Maint St., Install junction vault, 3phase transformer,
primary and secondary cables and secondary pedestals. Also includes Tree removal at the intersection of Main St. and
Sunset Avenue. (Please see attached drawing.)
WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑X Year:
Approx. Total: 60 Sq. Ft. (Includes Bore Pits and Vault & Ped installation on concrete sidewalk and pavement)
PAVEMENT CUT: ® Yes ❑ No If yes, indicate size of cut: x
CONCRETE CUT: N Yes ❑ No If yes, indicate size of cut: x
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(NUMBER OF MONTHS)
Sidewalk 48 Hrs + 5 LF
X
5 LF
25 SF
0 month
Alley 72 Hrs + 3 LF
X
4 LF
12 SF
0 month
Parking 72 Hrs + LF
X
LF
SF
APPLICANT TO READ AND SIGN
*Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
*Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS.
Indemnity: The Applicant has signed an application which states he/she hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this permit.
I have read the above statements and understand the permit requirements and acknowledge that I must
follow all requirements in order for the permit to be valid.
SIGNATURE �� Z�)Um'& DATE 11 /5/2020
Contractor or Agent
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
(EDMONDS LANDING)
(FERRY LOADING/UNLOADING LANES)
t
+t
IIIN-IVf
M �
A
RDno
woxx
AxEAD
BE
W 20 -1 PREPARED
ro sroP
W3-4
SIDEwkR
nosFo — a
AxEAO
W20 =
RDAD
wax
ax[eD
10
W3--4 B
BE
PREPARED =
TO STOP
A
W20-70
- SCHEDULE ALL INSPECTION THROUGH MYBUILDINGPERMIT.COM
- RESTORATION TO BE DETERMINED BY CITY INSPECTOR
N
NORTH
I
W20-4
JW20--/7A W3-4 W20-1
■ wE A to STOP 8I
siawuw 11
aasED
exFN
H`]IHIHIHI�—
PARKING LANE
a_
f MAIN ST. f
MAIN ST.
y
— y
1iliilii11 liiliiliiliiliillllllll H I
f i I V+ I F-F I I -+I ►+I I+I 1 �� ��
a
rp
■ _
A
DT-1-A,REDOP
_1 B
ROAp
pRA =
exFAD
FERRY WAITING
/T /T AREA /T
1 1 1 1
= OW20-7A
I
RDA. W20-1
wa1A
pxEAD
PARKING LANE
1
2
3
SPEED
SIGN
SPACING
BUFFER
LIMIT
A, B, C (FT)
(FT)
25
200
55
30
200
85
35
350
120
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
NOTE:
FLAGGERS REQUIRED TO CONTROL TRAFFIC
WHENEVER THE CREW MUST INTERRUPT
TRAFFIC FLOW TO ACCESS THE WORK SITE
WITH MATERIALS OR EQUIPMENT.
FLAGGERS TO ASSIST PEDESTRIANS CROSSING THE
ROAD BACK AND FORTH DURING CONSTRUCTION.
WORK HOURS:
7AM TO 5PM MONDAY TO THURSDAY
LEGEND:
O CONE OR CHANNELIZING DEVICE
®® SERVICE TRUCK/EQUIPMENT
WORK AREA
OT FLAGGER
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
1,1/ 08/03/2021
Vill
PEDESTRIAN ROUTE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
RESUB
May 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
NOT SEWER LINE - THIS ISgCURB
DOWNTOWN ALLIANCE BOUNDARY 'I
MAIN ST. A-5375s
PROP LINE \ \ it STREET LIGHT
PLI 368 \
;II
EXISTING PLI157897
SID WALK ��\� TO BE REMOVED
LP
WM O
— — — — — — — — — — — — — — 1
------S - - - - -- - - - --
�---S-10------- TREE TO BE II I
i - S - - - - - _ _ _ _ _ _ _ _ REMOVED
I /
i MAIN ST. \s Q
0----- -W--7------ j-----W--------------- W--------------W----- W
PROP 2( " S
0"
CONDUIT BORE , "
PLI 369 _
I� CURB
EXISTING
J-VAULT
A-29045 \ .0
4 =
�C 1
, I�
/ ~0
J
/ It
NEW 3PH
TRANSFORMER
l A-53757
LEGEND:
------ T-------
- EXISTING
TELICOMM
------- G-------
- EXISTING
GAS
------- W-------
- EXISTING
WATER
------ SD----------
- EXISTING
STORMDRAIN
------- S-------
- EXISTING
SEWER
- PROPOSED
BORE
ROUTE
No��N
- - - - - - - - - - -
- EXISTING
POWER IN
CONDUIT
OWNER/CONTRACTOR IS RESPONSIBLE FOR •
- POTHOLE
LOCATIONS
EROSION CONTROL AND DRAINAGE
z
Applicant shall repair/replace all ENGINEERING DIVISION
damage to utilities or frontage APPROVED AS NOTED
rn
V) improvements in City right-of-way
per city standards that is caused or J U WQ✓�,o -44 02/18/2022
occurs during the permitted project. VV
WSDOT FORCE MAIN SHALL BE
LOCATED PRIOR TO BORING MINIMUM CLEARANCE FROM UTILITIES:
(REFER TO TABLE FOR OTHER UTILITY)
HORIZONTAL - AT LEAST 5 FEET REVISION
VERTICAL = AT LEAST 12"
DISTANCE FROM OTHER APPURTENANCES = 10'
FEB 17 2022
ENGINEERING INSPECTOR TO DETERMINE RESTORATION LIMITS
MIN. DISTRICT CONDUIT CLEARANCE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT
FROM OTHER UTILITIES
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
VERT SEP (CROSSING)
HORIZ SEPARATION
TYPE OF UTILITY LINE
ELECT
PRIM
ELECT
SEC
MAIN
ELECT
SEC SERV
(300V MAX)
ELECT
PRIM
ELECT
SEC
MAIN
ELECT
SEC SERV
(300V MAX)
COMMUNICATION
6"
6"
6"
0"
0"
0"
COMMUNICATION SERVICE
3''
31'
3
011
01,
OII36"
HIGH PRESSURE GAS
12
12
2'
>=
6'
>=
LOW PRESSURE GAS
6'
6
6"
12"
12
12"
GAS SERVICE
6"
6"
6"
12"
12"
12"
LIGHTING & ELECTRIC SUPPLY
6"
6"
6"
0"
0"
0"
CITY OF EDMONDS RESU B
FD^'oti May 03 2021
a PLAN REVIEW COMMENTS CITY OFEDMONDS
DEVELOPMENT SERVICES
ENGINEERING DIVISION DEPARTMENT
(425) 771-0220
City Website: www.edmondswa.gov
DATE: March 30, 2021
TO: Richard Dumo, Snohomish County PUD
rsdumoksnopud.com
jointusegsnopud.com
FROM: Natalie Griggs, Engineering Technician
en ing eeringpermitsgedmondswa.gov
RE: Application #: ENG2020-0460 and -0461
Project: PUD Phase 1 and 2 Waterfront
Project Address: 107 Bell St, 102 Main St, Sunset Ave, Railroad Ave
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents including a
written response to each item below.
City of Edmonds handouts, standard details, application and other forms, and development code
may be referenced on the City website: www.edmondswa.gov under Services/Permits and
Development.
March 30, 2021 Comments
December 17, 2020 Comments
CONSTRUCTION PLANS
• March 30, 2021: 5' horizontal separation from catch basins, manholes, etc. shall be
sufficient if the boring location is verified per actual field locates. The City will
require 10' separation from bends in water main(s) or behind hydrants or water
blowoffs.
December 17, 2020: For all boring locations, show all underground utilities and
appurtenances within the vicinity of the boring. Any new conduit shall maintain
minimum utility separation-5' horizontal, 1' vertical, and at least 10' from utility
appurtenances. Please show that minimum separation requirements can be achieved on
the plans.
• Ok
Phase 1 Application ENG2020-0460
Boring from new pole PLI 364 to vault A-3307:
RESUB
May 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
1) March 30, 2021: Partially addressed. Please show all underground utilities and DEPARTMENT
services as they are located per actual field locates. Show potholing for all crossings.
See attached survey at the corner of Sunset and Bell for reference. Ans: the
potholes are the green dots as shown on the attached drawing below. The other utilities
are drawn from the drawing you have sent and the intersections with the bore will be
potholed.
7
PH1 - OTHER
UTILITIES.pdf
December 17, 2020: Show all underground utilities and appurtenances between the pole
at the corner of the 2" d Ave N on Bell St (PLI 364) and the vault (A-3307) at the
northwest corner of Bell St and Sunset Ave.
2) March 30, 2021: Partially addressed. Please ensure that all surface features match
field locates. See attached survey at the corner of Sunset and Bell for reference.
Show all surface features as they are actually located in the proposed bore path, including
the ROW line, sidewalk, curb -gutter, edge of pavement, trees, and any other surface
features that may affect boring feasibility. Ans: the drawing below includes carefully
drawn locations of bushes, maple tree, curb, sidewalk, edge of pavement, ROW, parking
lane, private driveway, alley way, planter etc. along the bore route. I'm not a professional
drafter but I tried my best to show all the items being asked for. Maybe you might need
to zoom in enough to see a better detail.
PH1 - OTHER
UTILITIES.pdf
3) Ok
4) Ok
5) Ok — addressing under ENG2020-0476.
New pole replacing BO pole PLI 364 at 2" d and Bell:
1) March 30, 2021: Procedure for payment from PUD to be discussed prior to issuance
of permit. Ans: Beth Haskins has confirmed that the Accounts payable have paid to
pay the City of Edmonds the $7,000 for the ADA Ramp.
December 17, 2020: Removal and relocation of pole PLI 364 will require the installation
of an ADA compliant ramp. Given the location of this ramp, the City will be requiring a
specific bulb design for the new ADA ramp. The City will not be requiring PUD to install
this ramp but will instead allow PUD to make payment to the City for a standard ADA
ramp in the amount of $7,000. The City will only require PUD to remove the BO pole
and to temporarily restore the ramp with asphalt until the City can install the specific
ADA ramp at a later date.
2) March 30, 2021: The new pole location has been approved per clear zone
requirements and per City's future bulb out design. Ans: Thank you.
December 17, 2020: The proposed new pole location does not meet clear zone
requirements. Please verify that the property line is at the back of sidewalk. City records
Page 2 of 3
RESUB
May 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
indicate that the property line may be further back from the back of sidewalk. If this is the
case, please revise the plans to show the new pole at the back of sidewalk.
3) Ok
4) Ok
Phase 2 Annlication ENG2020-0461
Boring on Sunset crossing Main St:
1) March 30, 2021: Partially addressed. Please show all underground utilities and
services as they are located per actual field locates. Show potholing for all crossings.
See attached survey at the corner of Sunset and Bell for reference. Ans: The
attached survey does not apply for Sunset crossing and Main St. and your recent email
(attached below) says that you do not have a survey that covers that intersection.
Therefore, I have drawn the other utilities in that intersection based on actual locates that
I have ordered and also from your Utility website. See the drawing below:
RE PUD Phase 1 & 2 PH2 - OTHER
ROW Permit Apps EN UTILITIES.pdf
December 17, 2020: Show all underground utilities and appurtenances between the pole
at the northwest corner of Sunset and Main St (PLI 157897) and the vault (A-53757) on
Railroad St.
2) March 30, 2021: Partially addressed. Please ensure that all surface features match
field locates. See attached survey at the corner of Sunset and Bell for reference.
Ans: As mentioned above on #1, the drawing below shows the location of Other
Utilities based on painted locates. I have tried my best to draw bushes, tree, curb,
sidewalk, edge of pavement, ROW, etc. along the bore route from the transformer to
the come1r of Sunset and Main St.
7
PH2 - OTHER
UTILITIES.pdf
Page 3 of 3
RESUB
May 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
December 17, 2020: Show all surface features as they are actually located in the DEPARTMENT
proposed bore path, including the ROW line, sidewalk, curb -gutter, edge of pavement,
trees, and any other surface features that may affect boring feasibility.
3) Pole removal to be reviewed under ENG2020-502 for Phase 4. Phase 1 and 2
for undergrounding only.
4) Ok, to be reviewed under ENG2020-0502 for Phase 4.
TRAFFIC CONTROL PLANS
1) Please resubmit all applicable traffic control plans for Phase 1 and 2 with the
next plan resubmittal. Answer: Please see Traffic Control Plans (TCP) with Pedestrian
Control Plan (PCP) for Phase 1 and Phase 2 below.
T T
EDMONDS TCP wd TCP wd PCP - PH
PCP - PH 2.pdf 1.pdf
2) Will portions of the sidewalk need to be closed for the proposed work? If so,
please provide pedestrian detour plans in addition to the vehicular traffic
control plans with signage to divert pedestrians to cross at the nearest
designated intersections. Answer: Please see Traffic control Plans with Pedestrian route
included. 7.1
TCP wd PCP - PH EDMONDS TCP wd
1.pdf PCP - PH 2.pdf
3) If revising the plans changes the location of work so that different traffic lanes or
sections of sidewalk or parking need to be closed, please submit updated traffic control
plans for review. Answer: The Plans for the bore route is not changing. The Traffic Control
Plans above are going to be used.
Page 4 of 3
RESUB
May 03 2021
(SUPPLEMENT ANSWERS) CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
(These are answers to the Phase 2 questions that were asked or included on the comments for
Phase 4 dated April 16, 2021)
February 5, 2021 Comments
CONSTRUCTION PLANS
1. April 16, 2021: The boring plan from Sunset across Main St was submitted with
Resub 2 for ENG2020-0460 and -0461 for Phase 1 and 2 of the underground project.
a) The "Other Utility Location" plan shows the boring as a perpendicular
crossing across Main St — this would be approved. The other plan sheet in
this packet, however, shows the boring across Main St at an angle — this will
not be approved. Please revise all plan sheets with parallel and perpendicular
borings only. Ans: We already addressed that crossing being not so
perpendicular on the phone when Jeff and I were at Main St. and you were on the
other line. There is a Water meter that Jeff pointed out on that corner which will
make a 90 degree crossing difficult. Maybe you just forgot that conversation
already but Jeff agreed that the crossing is not a perfect 90 degree angle but close
and it will miss the water meter.
b) Two lines are shown on the "Other Utility Location" plan — the new boring in
blue, and an existing power conduit in red. What is the proposed separation
between the two? There are other utility companies proposing future work in
the sidewalk in this location and it would preferred if these two conduits
were as close as possible to leave room for future utility projects. Ans: Yes,
we can have both our new electrical and existing as close as possible.
accommodate other
RESUB
May 03 2021
CITY OF EDMONDS
2. Aril 8 2021: Northwest corner of Main and Sunset: DEVELOPMENT SERVICES
p DEPARTMENT
a) The pole at northwest corner of Sunset and Main shall be removed, not
topped to be a meter pole. Revise the plans accordingly. The City will
coordinate with PUD outside of this permit to find a new location for this
meter. Ans: The Overhead Pole removal plan has been revised. That plan is
under Phase 4 but see a snapshot of the notes below. It says to "Pull out and
remove existing pole".
CONSTRUCTION NOTES:
O AT PLI 157897
EXISTING 45' CLASS 2 POLE
REMOVE 1KVA 120/220V OH TRANSFORMER
UTC-------------
SER-------------
MAKE------------
REMOVE CUTOUTS AND RELATED MATERIALS
REMOVE 2'' PRI RISER AND RELATED MATERIALS
PULL OUT AND REMOVE EXISTING POLE
NOTE: EXISTING METER FOR EDMONDS PUBLIC
WORKS WILL BE RELOCATED
b) What are the specifications for Ped #1 and Ped #2 shown next pole PLI
157897 (the pole to be removed)? Ans: The measurements of the 2
pedestals are below.
4-POS T1521
SET SCREW
TERMINALS 4-POS
SET SCREW
TERMINALS
18"
S' PVC DUCT
FROM A-2179
FROMDu10
1 LARGE SEC PED DETAIL 3 LARGE SEC PED DETAIL 4
NTS j 7 2 NTS 5
c) What are the specifications for vault A-53758 shown behind Ped #1 and Ped
#2? The lid of this vault will need to be pedestrian rated since it is in the
sidewalk. Ans: The Vault lid will be a "Non -slip" type lid. See below.
Page 2 of 3
RESUB
May 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
o � DEPARTMENT
4'-811
♦� �fV �f•t 4 •••
V0303 W/ NON -SLID'
(C(0* 1002120)
A-53758 DETAIL 2
NT'_ 5 ]
d) Why do both a vault and two pedestals need to be installed at this location?
With this configuration, the entire width of the sidewalk will be occupied by
PUD equipment and would limit any other utility companies from being able
to install underground facilities in this area. Could this arrangement be
consolidated? No. Please clarify. Ans: It is necessary to separate the Primary
wires/connections from the secondary connections. It is a safety requirement
/standard that we have to abide with.
e) What power source will be feeding the streetlight at this corner? Will the
new underground feed the streetlight or will PUD need a new source that is
not shown on the plans? The City will need to review this if it is outside the
scope of work that was submitted on the site plan. Ans: If the Streetlight at
this corner is currently being fed by the overhead transformer located on that
pole that is going away, one of the pedestals will be feeding the streetlight.
3. April 8, 2021: The plans are not to scale, so it is unclear how far the proposed
conduit will be from City utilities. Please provide plans that are to scale and that
show minimum separation requirements can be met. The conduit can be 5' from
City utilities and appurtenances but will need to be 10' from any bends in City
water mains or behind hydrants or blowoffs to provide sufficient space around
blocking. Ans: See "Other Utility Location" drawing below. I cannot draw plans that
are to scale without potholing the actual locations of the Utilities. The separation that
is being asked for will be maintained horizontally and if there is no room, the conduit
will maintain vertical separation. The included chart will be strictly followed by the
contractor that will be doing the bore.
Page 3 of 3
RESUB
0
1•
PH2 - OTHER
UTILITIES.pdf
May 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
February 5, 2021: For all boring locations, show all underground utilities and
appurtenances within the vicinity of the boring. Any new conduit shall maintain
minimum utility separation-5' horizontal, 1' vertical, and at least 10' from utility
appurtenances. Please show that minimum separation requirements can be achieved on
the plans.
a) Show all surface features as they are actually located in the proposed bore path,
including the ROW line, sidewalk, curb -gutter, edge of pavement, trees, and any
other surface features that may affect project feasibility.
b) Please refer to the attached plan sheet for the Site Utilities Plan at Lift Station 8.
TRAFFIC CONTROL PLAN
b. The TCP for the work on Main St and Sunset/Railroad does not show sidewalk
closures or pedestrian detours. Please revise the plans accordingly. Ans: Ans: See
updated TCP w/ Pedestrian control plan below.
TCP wd PCP - PH
2.pdf
c. The TCP that shows the work on Main and Sunset does not show any traffic control
measures for the boring pit on north side of Railroad St. Please revise. Ans: See
updated TCP w/ Pedestrian control plan below.
1-•
TCP wd PCP - PH
2.pdf
February 5, 2021: Will at least a 5'-wide sidewalk remain open during the proposed
work? If not, please ensure ADA accessibility during construction or provide a pedestrian
detour plan to have pedestrians cross at the nearest designated crosswalks. Please update
the traffic control plan accordingly. Ans: See updated TCP w/ Pedestrian control plan
below.
0
TCP wd PCP - PH
2.pdf
Page 4 of 3