Loading...
ENG2022-0063 ROW PERMITRIGHT OF WAY PERMIT PERMITNUMBER, City of Edmonds _7 121 5th Ave N, Edmonds WA ..• • 1 11.11 www.cityofedmonds.gov• • Description: PUD POTHOLING FOR CITY PHASE 9 SEWER PROJECT ISSUED: 02/22/2022 Address: 121 5TH AVE N EDMONDS WA 98020 EXPIRES: 02/17/2023 rmit Type: RIGHT OF WAY Permit Subtype: CITY Parcel Number: 00434400100300 i NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT RICHARD DUMO PO BOX 1107, EVERETT WA 98206 (425)783-5110 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER EDMONDS CITY OF 250 5TH AVENUE N, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 1111 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION ...,7TED RELEASED Bl 1 //) _ ,.. DATE 12/22/2022 Printed: Tuesday, February 22, 2022 1:05:56 PM 1 of 2 KIRRMF WAY PERMIT City of Edmonds www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE ALERT RESIDENTS Alert affected residents and/or businesses prior to work start. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS Scheduled required inspections as noted through My Building Permit www.mybuildingpermit.com POTHOLING Verify clear bore crossings. RESTORE LANDSCAPE Restore landscape to like or better conditions. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND OR NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL TRAFFIC CONTROL All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. • INSPECTION TYPE DATE RESULT NOTES COMPLETE X 2 ENGINEERING FINAL** Printed: Tuesday, February 22, 2022 1:05:56 PM 2 of 2 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Scope: Perform potholing at stated address to find electrical service conduits that might be in conflict with the City's Sewer replacement project. (as requested by Russell Lynch - 425-771-0220 ext. 1701) RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF n/a Alley 72 hours + LF Ix I LF SF n/a Parking 72 hours + LF I x I LF SF n/a SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable X power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes X No 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existingunderground common utilitysystem? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? n/a Are the additions for the purpose of serving a single-family residential subdivision? n/a Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the X project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: APPLICANT TITLE: Ie 11wo Richard Dumo PUD Engineer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE DATE: 2/16/2022 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 LANE CLOSURE ON A LOW VOLUME ROAD ROAD W20-1 WORK AHEAD ENGINEERING DIVISION ...,7TED ONE LANE W20-4 ROAD _ _ I� 12/22/2022 lV AHEAD x O O o RESTORE POTHOLES O o WITH HOT MIX. FULL W3-4 • RESTORATION NOT O REQUIRED UNDER THIS W20-7A ® PERMIT. }, O V) O to O m 't O N O W za 9k W20-7A O Lr)o -Z zz O y <-- W3-4 x if ONE LANE i ROAD W20-4 AHEAD X Applicant shall repair/replace all ROAD damage to utilities or frontage i WORKW20-1 improvements in City right-of-way A E per city standards that is caused or during the RECEIVED occurs permitted project. FEB 16 2022 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SNOHOMISH COUNTY L r- TRAFFIC CONTROL PLAN PUBLIC UTILITY DISTRICT NO 1 PROJECT POTHOLE FOR PUD SERVICE CONDUITS LOCATION 7411 241ST ST. SW, EDMONDS WA 98026 ENGINEER RICHARD DUMO DATE 2/16/2022 ORDER 100076076-60 PHONE 425-783-5110 CELLULAR 425-346-8846