Loading...
Building Permit 2020'SIDENTIAL BLDG Permit PERMIT NUM City of Edmonds www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: GREER JASON & EMILY Status: ISSUED Subtype: ADDITION Parcel No: 00450000000400 Site Address: 9809 241ST PL SW EDMONDS,WA 98020-6513 Applied: 1/6/2020 Subdivision: 004466, 004500 Lot: 0 Issued: 4/24/2020 Fire Sprinklers: Lot Area: 8,260 Zoning: RS-8 Final: Valuation: $5,796.00 Occupancy Type: Construction Type: Expiration Date: 4/24/2021 Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 1 Issued by: NED Scope of Work: GREER: UNCONDITIONED SUN ROOM WA State Contractor L & I #: SEATTPC853KQ City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT WILLIAM MILLHOLLIN 1026 SW 151ST ST, BURIEN WA (206)601-7043 WILLIAM@NWPERMIT.COM 98166 CONTRACTOR SEATTLE PATIO COVERS INC 33530 1ST WAY S STE 102, (206)850-3600 WES@SEATTLEPATIOCOVERS.COM FEDERAL WAYWA98003 OWNER GREER JASON & EMILY 9809 241ST PL SW, EDMONDS WA 98020-6513 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $35.00 $35.00 4/24/20 R4952 PER PERMIT ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $110.00 $110.00 4/24/20 R4952 PLAN REVIEW FEE RES 001.000.345.83.000.00 $196.35 $196.35 1/6/20 R1681 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/24/20 R4952 RESIDENTIAL VALUATION BASED 001.000.322.10.000.00 $231.00 $231.00 4/24/20 R4952 FEE TOTALS: $578.85 $578.85 CONDITION TYPE STATUS NOTES Printed: Tuesday, April 28, 2020 4:20:38 PM 1 of 2 MIDENTIAL BLDG PermitCity • • • • PERMITNUM 1215th Ave N, Edmonds •:i66 1 1 11 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. 3 INFORMATION - SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Work approved under this permit may or may not qualify as an essential or allowed activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the FOR Citys website for up-to-date information related to development activities during COVID- COVID-19 NOTICE INFORMATION 19. Issuance of this permit does not certify that construction is allowed to immediately occur, and inspections may or may not be granted accordingly. Construction activities and all required inspections will resume when the Order has been lifted. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION INSPECTIONS COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-4 FRAMING B-5 INSULATION ENERGY B-2 SETBACKS B-2 SLAB INSULATION B-7 BUILDING OTHER INSP X-2 ENGINEERING FINAL X-3 BUILDING FINAL" A-1 BUILDING PRECON Printed: Tuesday, April 28, 2020 4:20:38 PM 2 of 2