2020-0015 Greer Solarium AdditionCity of Edmonds
4 of EDP
0�� PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
�sr. 1 ggo
DATE: January 23, 2020
TO: Jason Greer
FROM: Kevin Bloomfield, Plans Examiner
RE: Plan Check: BLD2020-0015
Project Address: 9809 2415t pl sw
Scope: Sunroom Addition
Thank you for submitting your plans to the City of Edmonds for review. We have completed an
initial review of the project mentioned above. For this project to move forward a few items will
need to be addressed.
Once a revised set of plans, including a written response to the list of the items contained in this
letter are resubmitted, we can complete the review. Some items may require a review by other
divisions, such as Planning, Engineering, or Fire and will be noted as such.
Resubmittals can be made at the Development Services Department on the 2nd Floor of City
Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on
Wednesdays.
To complete the review the following items will need to be addressed:
General:
The addition of the sunroom and archway into the home will require compliance with the 2015
Washington State Energy Code.
R502.1 General
Additions to an existing building or portion thereof shall conform to the provisions of the 2015 WSEC
as those provision relate to new construction without requiring the unaltered posriton of the existing
building or building system to comply with this code.
The sunroom is being indirectly heated by the rest of the home. Alterations under 500 square feet
require a .5 energy credit. Energy credits can be found in Table 406.2 in the 2015 WSEC.
Once you have selected the option being used document this on the plans. Include all the information
into table R402.1.1 and include this with the plans.
Page A4
The archway between the two rooms has created two point loads. Please Show location of thickened
areas in the existing foundation.
If you need any clarification or have any questions at all, please feel free to call anytime.
Kevin Bloomfield
Page 2 of 2