Building Permit 2020'S IDENTIAL BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
98020 1 1 D
www.edmondswa.gov
wwm
Type: RESIDENTIAL BLDG Owner/ Business: ANDY MOLL Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 00672700001600 Site Address: 8721 191ST PL SW EDMONDS,WA 98026-5941
Applied: 10/8/2020
Subdivision: SP S-30-75, 004346, 006727 Lot: 0
Issued: 10/14/2020
Fire Sprinklers: No Lot Area: Zoning:
Final:
Valuation: $100,000.00 Occupancy Type: Construction Type: VB
Expiration Date: 10/14/2021
Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0
Issued by: WAC
Scope of Work: FIRE DAMAGE REPAIR
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
ANDY MOLL
PO BOX 1418, LAKE STEVENS
(425)931-4195
ANDY@DNACONSTRUCTIONLLC.COM
WA 98258
CONTACT
DNA CONSTRUCTION LLC
PO BOX 1418, LAKE STEVENS
(425)931-4195
andy@dnaconstructionllc.com
WA 98258
CONTRACTOR
DNA CONSTRUCTION LLC
PO BOX 1418, LAKE STEVENS
(425)931-4195
andy@dnaconstructionllc.com
WA 98258
DANIEL ALLEN & CORINN
8721 191ST PL SW, EDMONDS
OWNER
TOWLER
WA 98026-5941
•' ' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/13/20
R8063
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,100.00
$1,100.00
10/13/20
R8063
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$935.00
$935.00
10/9/20
R7985
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
10/13/20
R8063
TOTALS: $2,081.50 $2,081.50
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, October 14, 2020 11:36:30 AM 1 of 2
'SIDENTIAL BLDG Permit
PERMIT NU
City of Edmonds
-. •. � i
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS
- Schedule Online
at: https://Inspection.MVBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-3 ROOF SHEATHING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Wednesday, October 14, 2020 11:36:30 AM 2 of 2