Loading...
REVIEWED BLD2020-1067+Structural_Analysis_or_Calculations+10.5.2020_9.51.30_AM/©W DNA CONSTRUCTION DNA Construction Client: Daniel and Corrine Towler Property: 8721 191st PL SW Edmonds, WA 98026 Operator: ANDY Estimator: Andy Moll Position: Owner Company: DNA CONSTRUCTION Business: P.O. Box 1418 Lake Stevens, WA 98258 Type of Estimate: Fire Date Entered: 8/25/2020 Price List: WAEV8X_AUG20 Labor Efficiency: Restoration/Service/Remodel Estimate: TOWLER-1 Dear Daniel & Corrine Towler, Date Assigned: Home: (425) 773-6252 Business: (425) 931-4195 E-mail: andy@dnaconstructionllc. corn Thank you for the opportunity to bid on your repair project located at the address listed above. This estimate was based upon visible and known damages and does not include any hidden or unforeseen damages. All additional items will be addressed and approved in a second written estimate prior to beginning those items. If you have any questions or comments please feel free to contact me at your next earliest convenience. Thank you. /©W DNA CONSTRUCTION DNA Construction E "t5' 10"aundry Room �^ i� 13' 9" 13' 11" DESCRIPTION r C1]9T/ p 04:aI Main Level Laundry Room 336.00 SF Walls 424.61 SF Walls & Ceiling 9.85 SY Flooring 42.00 LF Ceil. Perimeter Height: 8' 88.61 SF Ceiling 88.61 SF Floor 42.00 LF Floor Perimeter 1. Content Manipulation (Bid Item) Contents to be moved by others. 2. Interior door - Detach & reset - slab only 3. R&R Light fixture 4. Seal attic framing (shellac) - up to 5/12 5. Seal stud wall for odor control (shellac) 6. Batt insulation - 10" - R30 - unfaced batt 7. Batt insulation - 4" - RI I- unfaced batt 8. 1/2" drywall - hung, taped, ready for texture 9. Drywall Installer / Finisher - per hour Remove remainder of ceiling drywall to smoke seal attic, add backing, prep for new and blend texture. 10. Seal/prime then paint the walls and ceiling twice (3 coats) 11. Floor protection - heavy paper and tape 12. Mask and prep for paint - paper and tape (per LF) 13. Baseboard - Detach & reset 14. Baseboard - 2 1/4" stain grade 15. Stain & finish baseboard 16. R&R Trim board - 1" x 6" - installed (hardwood - oak or =) 17. R&R Casing - 2 1/4" stain grade 18. Stain & finish wood window sill 19. Stain & finish casing 20. Underlayment - 1/2" BC plywood 21. Remove Vinyl floor covering (sheet goods) 22. Floor preparation for resilient flooring 23. Vinyl floor covering (sheet goods) 24. R&R Vinyl - metal transition strip 25. Heat/AC register - Floor register - Detach & reset QTY 1.00 EA 2.00 EA 1.00 EA 35.44 SF 10.00 SF 35.44 SF 15.00 SF 45.44 SF 4.00 HR 424.61 SF 88.61 SF 42.00 LF 34.75 LF 7.25 LF 42.00 LF 12.00 LF 12.00 LF 12.00 LF 12.00 LF 27.00 SF 45.00 SF 88.61 SF 137.42 SF 6.00 LF 1.00 EA TOWLER-1 9/23/2020 Page:2 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Laundry Room DESCRIPTION 26. Prime & paint heat register 27. Washer/Washing Machine - Front -loading - High grade 28. Washing machine hose line - stainless steel (per pair) 29. Dryer - Electric - High grade 30. Final cleaning - construction - Residential NOTES �3' 4"� 2' 10,E Half Bathroti�hii t"1--2' 3" I 19" DESCRIPTION Half Bathroom 113.37 SF Walls 125.42 SF Walls & Ceiling 1.34 SY Flooring 14.17 LF Ceil. Perimeter 31. Content Manipulation (Bid Item) Contents to be moved by others. 32. R&R Light fixture 33. Clean bathroom fan - Heavy Labor and materials to replace bathroom fan ducting. 34. Seal/prime then paint the walls and ceiling twice (3 coats) 35. Floor protection - heavy paper and tape 36. Mask and prep for paint - paper and tape (per LF) 37. Baseboard - Detach & reset 38. Stain & finish baseboard 39. Remove Vinyl floor covering (sheet goods) 40. Vinyl floor covering (sheet goods) QTY 1.00 EA 1.00 EA 1.00 EA 1.00 EA 88.61 SF Height: 8' 12.05 SF Ceiling 12.05 SF Floor 14.17 LF Floor Perimeter QTY 1.00 EA 1.00 EA 1.00 EA 125.42 SF 12.05 SF 14.17 LF 14.17 LF 14.17 LF 12.05 SF 71.08 SF TOWLER-1 9/23/2020 Page:3 /©W DNA CONSTRUCTION DNA Construction DESCRIPTION 41. Floor preparation for resilient flooring 42. Toilet - Detach & reset 43. R&R Plumbing fixture supply line 44. Toilet paper holder - Detach & reset 45. Clean toilet 46. Final cleaning - construction - Residential NOTES Garage CONTINUED - Half Bathroom 722.67 SF Walls 1231.50 SF Walls & Ceiling 56.54 SY Flooring 90.33 LF Ceil. Perimeter QTY 12.05 SF 1.00 EA 1.00 EA 1.00 EA 1.00 EA 12.05 SF Height: 8' 508.83 SF Ceiling 508.83 SF Floor 90.33 LF Floor Perimeter DESCRIPTION QTY All top cord tails on truss system in roof selction F5/East wall of garage are none salvageable from fire and need to be replaced. 47. R&R Tarp - all-purpose poly - per sq ft (labor and material) 1200.00 SF Apply tarp during attic framing repair to protect structure. 48. R&R 2" x 8" lumber (1.33 BF per LF) 392.00 LF 49. R&R 1" x 4" lumber (.333 BF per LF) 816.00 LF 50. R&R Sheathing - plywood - 1/2" CDX 165.93 SF 51. R&R 2" x 6" lumber (1 BF per LF) 16.00 LF 52. R&R Sheathing - plywood - 3/4" CDX 160.00 SF Attic sheeting. 53. R&R Framing hanger 28.00 EA 54. R&R Framing hurricane tie 14.00 EA TOWLER-1 9/23/2020 Page:4 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Garage DESCRIPTION QTY 55. Carpenter - General Framer - per hour 3.00 HR Labor and materials to make V-cut vent blocks and add screen. 56. Seal truss system (shellac) - up to 5/12 348.50 SF 57. Seal stud wall for odor control (shellac) 269.33 SF 58. Batt insulation - 6" - R19 - unfaced batt 78.90 SF 59. 5/8" drywall - hung, taped, floated, ready for paint 748.16 SF Garage drywall is finished and painted. 60. Seal/prime then paint part of the walls and ceiling twice (3 coats) 907.50 SF 61. Paint overhead door - 2 coats (per side) 2.00 EA 62. Mask and prep for paint - plastic, paper, tape (per LF) 90.33 LF 63. Floor protection - heavy paper and tape 508.83 SF 64. Light bulb - Fluorescent tube - 4' soft white - mat. only 2.00 EA 65. Install Fluorescent light fixture 1.00 EA 66. Overhead (garage) door opener - Detach & reset 2.00 EA 67. Door Installer/Finish Carpenter - per hour 2.00 HR Remove and re -install track and garage door assembly for drywall repair. 68. Finish Hardware Installer - per hour 4.00 HR Labor to reset all garage hooks and accessories. 69. R&R Stairway - disappearing (folding) / attic access ladder 1.00 EA 70. R&R 110 volt commercial wiring/conduit, box, outlet, switch 6.00 EA 71. Final cleaning - construction - Residential 508.83 SF NOTES TOWLER-1 9/23/2020 Page:5 /©W DNA CONSTRUCTION DNA Construction n 6� Patio Height: 8' 0 726.67 SF Walls 234.84 SF Ceiling ~ 961.50 SF Walls & Ceiling 234.84 SF Floor 26.09 SY Flooring 90.83 LF Floor Perimeter 1 90.83 LF Ceil. Perimeter 7" DESCRIPTION QTY 72. Fencing Installer - per hour 30.00 HR Labor to replace fence and build new garden shed. 73. Material Only Wood fence rail - 2" x 4" x 8'- treated 1.00 EA 74. Material Only Post - wood - 4" x 4" treated lumber 5.00 EA 75. Material Only 2" x 4" lumber - treated (.667 BF per LF) 34.00 LF 76. Material Only 2" x 12" lumber (2 BF per LF) 12.00 LF 77. Material Only Wood fence slat 5' - 6' high - cedar or equal 110.00 EA 78. Metal roofing 24.00 SF 79. Expansion joint - Plastic/PVC 11.00 LF 80. Concrete Finisher - per hour 12.00 HR Demo slab. 81. Concrete slab on grade - 4" - finished in place 234.84 SF 82. Concrete slab reinforcement - #3 (3/8") - grid, 24" ea way 234.84 SF 83. Add for aggregate (pebble) finish 234.84 SF 84. 2" x 8" lumber - treated (1.33 BF per LF) 45.00 LF Replace treat 4x8 treated bulk head. NOTES ? Driveway 684.00 SF Walls Y 1140.88 SF Walls & Ceiling 50.76 SY Flooring J-1 85.50 LF Ceil. Perimeter Height: 8' 456.88 SF Ceiling 456.88 SF Floor 85.50 LF Floor Perimeter TOWLER-1 9/23/2020 Page:6 /©W DNA CONSTRUCTION DNA Construction DESCRIPTION QTY 85. Clean with pressure/chemical spray 456.88 SF Clean driveway. 86. Material Only Underlayment - 1/2" OSB 320.00 SF Protect driveway. NOTES �--11, 5" T Y, e oseG i 1 DESCRIPTION Bedroom 1 Level 2 498.88 SF Walls 702.15 SF Walls & Ceiling 22.59 SY Flooring 62.36 LF Ceil. Perimeter Subroom: Closet (1) 159.19 SF Walls 174.78 SF Walls & Ceiling 1.73 SY Flooring 19.90 LF Ceil. Perimeter Height: 8' 203.27 SF Ceiling 203.27 SF Floor 62.36 LF Floor Perimeter Height: 8' 15.59 SF Ceiling 15.59 SF Floor 19.90 LF Floor Perimeter 87. Content Manipulation (Bid Item) Contents to be moved by others. 88. Batt insulation - 4" - R13 - unfaced batt 89. Seal stud wall for odor control (shellac) 90. Drywall Installer / Finisher - per hour Labor and materials to add backing, prep for new and blend texture after repairs. 91. R&R 1/2" drywall - hung, taped, ready for texture Remove drywall on east wall and partially on south wall to smoke seal and re -insulate wall cavities. 92. Seal the surface area w/latex based stain blocker - one coat 93. Paint part of the walls - two coats - 2 colors TOWLER-1 QTY 1.00 EA 156.00 SF 156.00 SF 4.00 HR 156.00 SF 231.00 SF 329.03 SF 9/23/2020 Page:7 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Bedroom 1 DESCRIPTION QTY Residual smoke smell in Master Closet. 94. Labor to tape drop cloths 109.43 SF 95. Mask and prep for paint - plastic, paper, tape (per LF) 82.26 LF 96. Baseboard - Reset 41.13 LF 97. Stain & finish baseboard 41.13 LF 98. Final cleaning - construction - Residential 218.86 SF NOTES Master Bath DESCRIPTION 440.00 SF Walls 551.78 SF Walls & Ceiling 12.42 SY Flooring 55.00 LF Ceil. Perimeter 99. R&R Window drapery - hardware 100. R&R Window blind - aluminum - 1" - 7.1 to 14 SF 101. Interior door - Detach & reset 102. Detach & Reset Light bar - 4 lights 103. Towel bar 104. Towel ring - Detach & reset 105. Toilet paper holder - Detach & reset 106. Mirror - 1/4" plate glass 107. Vanity - High grade 108. Material Only Countertop subdeck - plywood 109. Install Countertop subdeck - plywood Height: 8' 111.78 SF Ceiling It 1.78 SF Floor 55.00 LF Floor Perimeter QTY 1.00 EA 3.00 EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 1.00 EA 18.00 SF 6.00 LF 32.00 SF 16.00 SF TOWLER-1 9/23/2020 Page:8 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Master Bath DESCRIPTION QTY 110. Countertop edge treatment - wood 9.00 LF 111. 1/4" Cement board 16.00 SF 112. Ceramic/porcelain tile 16.00 SF 113. Seal grout on tile wall 111.78 SF 114. 4" backsplash for flat laid countertop - Solid hardwood 8.00 LF 115. Plumbing - Labor Minimum 1.00 EA Plumbing minimum charge to remove angle stops for drywall and cabinet installation and cap off supply lines. 116. Angle stop valve 4.00 EA 117. Plumbing fixture supply line 4.00 EA 118. P-trap assembly - ABS (plastic) 2.00 EA 119. Sink - single 2.00 EA 120. Sink faucet - Bathroom 2.00 EA 121. Tile / Cultured Marble Installer - per hour 4.00 HR Labor to remove tub tile and prep substrate for new tile. 122. 1/4" Cement board 61.50 SF 123. Ceramic/porcelain tile 61.50 SF 124. Ceramic tile - bullnose - 2" x 6" 8.00 LF 125. Seal grout on tile wall 61.50 SF 126. Jetted tub - Acrylic 1.00 EA 127. R&R Jet well pump - 1/2 hp - pump & motor 1.00 EA 128. Jetted tub faucet 1.00 EA 129. Seal/prime then paint the walls and ceiling twice (3 coats) - 2 colors 551.78 SF Residual smoke smell in Master Bedroom. 130. Floor protection - heavy paper and tape 111.78 SF 131. Mask and prep for paint - plastic, paper, tape (per LF) 55.00 LF 132. Batt insulation - 4" - Rl 1- unfaced batt 18.00 SF 133. R&R 1/2" - drywall per LF - up to T tall 6.00 LF 134. Drywall Installer / Finisher - per hour 2.00 HR Labor and materials to add backing, prep for new and blend texture after repairs. 135. Seal the floor shellac - one coat 111.78 SF 136. Seal stud wall for odor control (shellac) 34.00 SF 137. R&R Snaplock Laminate - simulated wood flooring 116.55 SF 138. R&R Reducer strip - for wood flooring 9.00 LF TOWLER-1 9/23/2020 Page:9 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Master Bath DESCRIPTION QTY 139. R&R Underlayment - rubber - 1/4" - 3/8" - Floating 111.78 SF 140. Detach & Reset Heat/AC register - Floor register 1.00 EA 141. Prime & paint heat register 1.00 EA 142. Remove Baseboard - 2 1/4" stain grade 20.00 LF 143. Stain & finish baseboard 44.15 LF 144. Toilet - Detach & reset 1.00 EA Remove toilet to clean and re -grout tile. 145. R&R Plumbing fixture supply line 1.00 EA 146. Regrout tile 12.00 SF 147. Seal grout on tile wall 12.00 SF 148. Clean bathroom fan - Heavy 1.00 EA 149. Clean toilet 1.00 EA 150. Final cleaning - construction - Residential 111.78 SF NOTES � 18' 6" Is ster CIO t _ q a Master Bedroom I 5' 3" 1 F5'7" T L=18' 2"5' S" DESCRIPTION Master Bedroom 593.33 SF Walls 858.20 SF Walls & Ceiling 29.43 SY Flooring 74.17 LF Ceil. Perimeter 151. Content Manipulation (Bid Item) Contents to be moved by others. 152. Detach & Reset Window drapery - hardware - single rod 153. Detach & Reset Hanging light fixture Height: 8' 264.87 SF Ceiling 264.87 SF Floor 74.17 LF Floor Perimeter QTY 1.00 EA 1.00 EA 1.00 EA TOWLER-1 9/23/2020 Page:10 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Master Bedroom DESCRIPTION QTY 154. Seal/prime then paint the walls and ceiling twice (3 coats) - 2 colors 858.20 SF Residual smoke smell in Master Bedroom. 155. Labor to tape drop cloths 264.87 SF 156. Mask and prep for paint - plastic, paper, tape (per LF) 74.17 LF 157. Final cleaning - construction - Residential 264.87 SF NOTES Master Closet 5' 3" Master Closk a a 1 232.00 SF Walls 280.56 SF Walls & Ceiling 5.40 SY Flooring 29.00 LF Ceil. Perimeter Height: 8' 48.56 SF Ceiling 48.56 SF Floor 29.00 LF Floor Perimeter DESCRIPTION QTY 158. Content Manipulation (Bid Item) 1.00 EA Contents to be moved by others. 159. Recessed light fixture - Detach & reset trim only 1.00 EA 160. Shelving - wire (vinyl coated) - Detach & reset 51.00 LF 161. Seal/prime then paint the walls and ceiling twice (3 coats) 280.56 SF Residual smoke smell in Master Closet. 162. Labor to tape drop cloths 48.56 SF 163. Mask and prep for paint - plastic, paper, tape (per LF) 29.00 LF 164. Final cleaning - construction - Residential 48.56 SF TOWLER-1 9/23/2020 Page: II /©W DNA CONSTRUCTION DNA Construction DESCRIPTION NOTES CONTINUED - Master Closet Roof3 900.85 Surface Area 170.69 Total Perimeter Length s j, JF5()68.99 Total Hip Length 4T<i DESCRIPTION 165. Remove Laminated - comp. shingle rfg. - w/ felt 166. Laminated - comp. shingle rfg. - w/ felt Remove sections F1, F3, F5 and F6 in roof sketch (not in line of site). 9.01 Number of Squares 3.29 Total Ridge Length QTY QTY 9.01 SQ 9.33 SQ Upper roof selection partially needs to be replaced due to sun fade after 10 yrs. Replacement is only for line of sight with lower section from driveway and road. Insured stated roof is approx 14yrs old. 167. R&R Valley metal - (W) profile - painted 34.59 LF 168. R&R Ridge cap - Standard profile - composition shingles 86.20 LF 169. R&R Drip edge 170.69 LF 170. R&R Chimney flashing - average (32" x 36") 1.00 EA 171. R&R Flashing - L flashing - color finish 36.00 LF 172. Step flashing 44.00 LF 173. R&R Gutter / downspout - aluminum - up to 5" 218.69 LF NOTES TOWLER-1 9/23/2020 Page:12 /©W DNA CONSTRUCTION DNA Construction Landscaping DESCRIPTION QTY 174. Plants - shrubs - deciduous - 1 gallon 1.00 EA 175. Plants - shrubs - deciduous - 5 gallon 3.00 EA 176. Material Only Mulching (per CY) 4.00 CY 177. General Laborer - per hour 9.00 HR 3 guys for 3 hours to remove mulching and prune trees. NOTES Roon DESCRIPTION Level 3 1424.80 Surface Area 187.57 Total Perimeter Length 13 5.3 7 Total Hip Length 178. Remove Laminated - comp. shingle rfg. - w/ felt 179. Laminated - comp. shingle rfg. - w/ felt Remove sections F1, F3, F5 and F6 in roof sketch (not in line of site). 14.25 Number of Squares 37.75 Total Ridge Length QTY 14.25 SQ 14.33 SQ Upper roof selection partially needs to be replaced due to sun fade after 10 yrs. Replacement is only for line of sight with lower section from driveway and road. Insured stated roof is approx 14yrs old. 180. R&R Valley metal - (W) profile - painted 54.00 LF 181. R&R Ridge cap - Standard profile - composition shingles 37.75 LF 182. R&R Flashing - pipe jack - lead 3.00 EA 183. R&R Roof vent - turtle type - Metal 4.00 EA 184. R&R Drip edge 187.57 LF 185. Roof window - Detach & reset 1.00 EA 186. R&R Roof window step flashing kit 1.00 EA TOWLER-1 9/23/2020 Page:13 /©W DNA CONSTRUCTION DNA Construction DESCRIPTION NOTES CONTINUED - Roon Level 4 Upper Siding Elevation " 371.34 SF Walls 454.09 SF Walls & Ceiling lip, � 9.20 SY Flooring 46.42 LF Ceil. Perimeter Subroom: Room2 (1) 244.84 SF Walls Room2 (1) la-s, Rm 283.12 SF Walls & Ceiling �z'8^ 4.25 SY Flooring 30.61 LF Ceil. Perimeter s 9^ _ Room3 (2) Q N Roc _ 1 �6' 1 Subroom: Room3 (2) 188.00 SF Walls 222.50 SF Walls & Ceiling 3.83 SY Flooring 23.50 LF Ceil. Perimeter QTY Height: 8' 82.76 SF Ceiling 82.76 SF Floor 46.42 LF Floor Perimeter Height: 8' 38.28 SF Ceiling 38.28 SF Floor 30.61 LF Floor Perimeter Height: 8' 34.50 SF Ceiling 34.50 SF Floor 23.50 LF Floor Perimeter TOWLER-1 9/23/2020 Page:14 /*W DNA Construction DNA CONSTRUCTION -]s7"-� 15' 3" Room6 (5) _ R Subroom: Room4 (3) 171.93 SF Walls 195.85 SF Walls & Ceiling 2.66 SY Flooring 21.49 LF Ceil. Perimeter Subroom: Rooms (4) 282.55 SF Walls 347.89 SF Walls & Ceiling 7.26 SY Flooring 35.32 LF Ceil. Perimeter Subroom: Room6 (5) 312.93 SF Walls 362.52 SF Walls & Ceiling 5.51 SY Flooring 39.12 LF Ceil. Perimeter 1 -7 7 -~ Subroom: Room? (6) T 3" 196.35 SF Walls Room? (6) a 230.60 SF Walls & Ceiling ��''lo" 3.81 SY Flooring 8 a" 24.54 LF Ceil. Perimeter 1-8' 6"1 Subroom: Room8 (7) 248.96 SF Walls 304.43 SF Walls & Ceiling 6.16 SY Flooring 31.12 LF Ceil. Perimeter Height: 8' 23.93 SF Ceiling 23.93 SF Floor 21.49 LF Floor Perimeter Height: 8' 65.34 SF Ceiling 65.34 SF Floor 35.32 LF Floor Perimeter Height: 8' 49.59 SF Ceiling 49.59 SF Floor 39.12 LF Floor Perimeter Height: 8' 34.25 SF Ceiling 34.25 SF Floor 24.54 LF Floor Perimeter Height: 8' 55.47 SF Ceiling 55.47 SF Floor 31.12 LF Floor Perimeter TOWLER-1 9/23/2020 Page:15 /©W DNA CONSTRUCTION DNA Construction 12' 5", Subroom: Room9 (8) 164.55 SF Walls ..Sp" _ 181.64 SF Walls & Ceiling 1.90 SY Flooring 1 20.57 LF Ceil. Perimeter Height: 8' 17.09 SF Ceiling 17.09 SF Floor 20.57 LF Floor Perimeter r2' 3" DESCRIPTION QTY 187. Clean with pressure/chemical spray 644.53 SF 188. Prime & paint exterior soffit - exposed rafters 243.33 SF 189. Seal & paint wood siding 401.20 SF 190. Labor to tape drop cloths 408.00 SF 191. Prime & paint exterior fascia - wood, 4"- 6" wide 121.67 LF 192. Mask and prep for paint - paper and tape (per LF) 121.67 LF NOTES 20' 6 20 Lower Siding Elevation �= o 1-6' 2" 6' T Room10 (1) I t �6 4---------- I Lower Siding Elevation 620.00 SF Walls 995.00 SF Walls & Ceiling 41.67 SY Flooring 77.50 LF Ceil. Perimeter Subroom: Room10 (1) 222.43 SF Walls 269.84 SF Walls & Ceiling 5.27 SY Flooring 27.80 LF Ceil. Perimeter Height: 8' 375.00 SF Ceiling 375.00 SF Floor 77.50 LF Floor Perimeter Height: 8' 47.41 SF Ceiling 47.41 SF Floor 27.80 LF Floor Perimeter TOWLER-1 9/23/2020 Page:16 /©W DNA CONSTRUCTION DNA Construction �--- 7"� 22 ," 3) [:Room12 E(2)] i� 1--12' 4"1 [F 12' 5) Room13 (3) �6' 4" 6' (4) Room14 (5) 3' 6" 7 oom15 (4) Subroom: Room12 (2) 482.43 SF Walls 658.24 SF Walls & Ceiling 19.53 SY Flooring 60.30 LF Ceil. Perimeter Subroom: Room13 (3) 318.43 SF Walls 413.25 SF Walls & Ceiling 10.54 SY Flooring 39.80 LF Ceil. Perimeter Subroom: Room14 (5) 222.43 SF Walls 269.84 SF Walls & Ceiling 5.27 SY Flooring 27.80 LF Ceil. Perimeter Subroom: Room15 (4) 182.43 SF Walls 210.08 SF Walls & Ceiling 3.07 SY Flooring 22.80 LF Ceil. Perimeter Subroom: Room16 (10) 174.43 SF Walls 198.13 SF Walls & Ceiling 2.63 SY Flooring 21.80 LF Ceil. Perimeter Height: 8' 175.81 SF Ceiling 175.81 SF Floor 60.30 LF Floor Perimeter Height: 8' 94.82 SF Ceiling 94.82 SF Floor 39.80 LF Floor Perimeter Height: 8' 47.41 SF Ceiling 47.41 SF Floor 27.80 LF Floor Perimeter Height: 8' 27.66 SF Ceiling 27.66 SF Floor 22.80 LF Floor Perimeter Height: 8' 23.71 SF Ceiling 23.71 SF Floor 21.80 LF Floor Perimeter TOWLER-1 9/23/2020 Page:17 /©W DNA CONSTRUCTION DNA Construction 1--10' 7"� 10'3" 19 ( RoomB (7) '" 17 H2' 9"--I 2' 5" 1 om19 �--a'------ I 3' 6" oom20 (9) t e'er DESCRIPTION Subroom: Room17 (6) 157.10 SF Walls 172.24 SF Walls & Ceiling 1.68 SY Flooring 19.64 LF Ceil. Perimeter Subroom: Room18 (7) 290.43 SF Walls 371.42 SF Walls & Ceiling 9.00 SY Flooring 36.30 LF Ceil. Perimeter Subroom: Room19 (8) 165.10 SF Walls 184.19 SF Walls & Ceiling 2.12 SY Flooring 20.64 LF Ceil. Perimeter Subroom: Room20 (9) 182.43 SF Walls 210.08 SF Walls & Ceiling 3.07 SY Flooring 22.80 LF Ceil. Perimeter 193. Door numbers/letters - Detach & reset 194. R&R Exterior light fixture 195. Clean with pressure/chemical spray 196. Prime & paint exterior soffit - exposed rafters 197. Seal & paint wood siding 198. Labor to tape drop cloths 199. Prime & paint exterior fascia - wood, 4"- 6" wide 200. Mask and prep for paint - paper and tape (per LF) Height: 8' 15.15 SF Ceiling 15.15 SF Floor 19.64 LF Floor Perimeter Height: 8' 80.99 SF Ceiling 80.99 SF Floor 36.30 LF Floor Perimeter Height: 8' 19.10 SF Ceiling 19.10 SF Floor 20.64 LF Floor Perimeter Height: 8' 27.66 SF Ceiling 27.66 SF Floor 22.80 LF Floor Perimeter QTY 1.00 EA 1.00 EA 1187.71 SF 253.00 SF 934.71 SF 586.00 SF 126.50 LF 126.50 LF TOWLER-1 9/23/2020 Page:18 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Lower Siding Elevation DESCRIPTION 201. Mask and prep for paint - plastic, paper, tape (per LF) NOTES Burnt wall 1---32' 8" 32' 4" I r Burnt wall R in10 F DESCRIPTION 643.76 SF Walls 899.25 SF Walls & Ceiling 28.39 SY Flooring 80.47 LF Ceil. Perimeter 202. R&R Fascia - 2" x 8" - softwood - re -sawn 203. R&R Underlayment - 5/8" BC plywood BC Grade exposed soffit plywood. 204. R&R Sheathing - plywood - 1/2" CDX Wall sheeting replace 4 sheets due to burn. 205. Seal more than the floor shellac - one coat 206. R&R House wrap (air/moisture barrier) 207. R&R Siding - tongue & groove - redwood 208. R&R Siding trim - 1" x 8" hardboard trim board 209. R&R Siding trim - 1" x 4" hardboard trim board 210. R&R Siding trim - 1" x 2" fir re -sawn 211. R&R Aluminum window, horiz. slider 3-11 sf (2 pane) 212. Add. charge for a retrofit window, 3-11 sf - difficult 213. Caulking - acrylic 214. Flashing - Sill flashing - moldable tape 215. Prime & paint exterior soffit - exposed rafters QTY 86.00 LF Height: 8' 255.49 SF Ceiling 255.49 SF Floor 80.47 LF Floor Perimeter QTY 45.00 LF 88.00 SF 128.00 SF 335.49 SF 335.49 SF 335.49 SF 42.00 LF 14.00 LF 56.00 LF 1.00 EA 1.00 EA 68.00 LF 12.00 LF 253.00 SF TOWLER-1 9/23/2020 Page:19 /©W DNA CONSTRUCTION DNA Construction CONTINUED - Burnt wall DESCRIPTION QTY 216. Seal & paint wood siding 255.49 SF 217. Labor to tape drop cloths 144.00 SF 218. Prime & paint exterior fascia - wood, 4"- 6" wide 36.00 LF 219. Mask and prep for paint - paper and tape (per LF) 72.00 LF 220. Exterior faucet / hose bibb - Detach & reset 1.00 EA 221. Door Installer/Finish Carpenter - per hour 1.00 HR Detach and reset dog door. NOTES: Gereral DESCRIPTION QTY 222. Residential Supervision / Project Management - per hour 223. Painter -per hour Labor to stain match millwork. 224. Two ladders with jacks and plank (per day) 225. Scaffold - per section (per week) 226. Scaffolding Setup & Take down - per hour 227. Furnace - check, heavy clean, replace filters and service Furnace to be inspected for smoke damage. If damaged furnace will need to be replaced. 228. Single axle dump truck - per load - including dump fees 229. Temporary toilet (per month) 230. General Laborer - per hour Site clean up. 231. Architectural/Drafting fees (Bid Item) This items may or may not be needed. 232. Taxes, insurance, permits & fees (Bid Item) TOWLER-1 9/23/2020 20.00 HR 2.00 HR 2.00 DA 2.00 WK 3.00 HR 1.00 EA 3.00 EA 3.00 MO 4.00 HR 1.00 EA 1.00 EA Page: 20 /©W DNA CONSTRUCTION DNA Construction DESCRIPTION 233. Electrical (Bid Item) Panel, Conduit, outlets and security system. NOTES Back Lower 1 DESCRIPTION CONTINUED - Gereral Back Lower Roof 934.71 Surface Area 231.76 Total Perimeter Length 234. Remove Laminated - comp. shingle rfg. - w/ felt 235. Laminated - comp. shingle rfg. - w/ felt Remove sections F 1, F3, F5 and F6 in roof sketch (not in line of site). 9.35 Number of Squares 19.08 Total Ridge Length QTY 1.00 EA QTY 9.04 SQ 9.33 SQ Upper roof selection partially needs to be replaced due to sun fade after 10 yrs. Replacement is only for line of sight with lower section from driveway and road. Insured stated roof is approx 14yrs old. 236. R&R Valley metal - (W) profile - painted 17.02 LF 237. R&R Ridge cap - Standard profile - composition shingles 35.00 LF 238. R&R Drip edge 231.76 LF 239. Step flashing 34.00 LF 240. Roofer -per hour 2.00 HR Labor and materials to remove and replace large skylight flashing on 4 piece unit. Labor is needed do to difficulty. TOWLER-1 9/23/2020 Page:21 /©W DNA CONSTRUCTION DNA Construction DESCRIPTION NOTES Grand Total Areas: 11,108.93 SF Walls 3,964.92 SF Floor 0.00 SF Long Wall 3,964.92 Floor Area 14,517.98 Exterior Wall Area 8,390.13 Surface Area 60.13 Total Ridge Length CONTINUED - Back Lower 1 3,964.92 SF Ceiling 440.55 SY Flooring 0.00 SF Short Wall 2,951.21 Total Area 941.17 Exterior Perimeter of Walls 32.60 Number of Squares 204.36 Total Hip Length 15,073.85 SF Walls and Ceiling 1,388.62 LF Floor Perimeter 1,388.62 LF Ceil. Perimeter 11,166.26 Interior Wall Area 590.02 Total Perimeter Length QTY TOWLER-1 9/23/2020 Page:22 Main Level Main Level TOWLER-1 9/23/2020 Page:23 Level 2 1--18'6 io Level 2 TOWLER-1 9/23/2020 Page:24 Level 3 �-13'4"--------------- I Level 3 TOWLER-1 9/23/2020 Page:25 Level 4 Level 4 TOWLER-1 9/23/2020 Page:26 Back Lower Roof t 21' S" 19' 1 " ire T co ID (V N IL Back Lower Roof TOWLER-1 9/23/2020 Page:27